466 ENGINE <1992> - Fuel and Emission Control Parts
IIC-47
REMOVAL AND INSTALLATION - SOHC for TRUCK 12 Nm 9 ft.lbs.
I - - - -
5
12 Nm 9 ft.lbs.
9Nm 7 ft.lbs.
19Nm 14 ft.lbs.
Removal steps 1. Throttle body 2. Throttle body gasket 3. EGR valve 4. EGR valve gasket 5. Injectors and fuel rail 6. Insulator 7. Fuel pressure regulator )B4 8. O-ring 9. Insulator *AC 10. injectors 11. O-ring 12. Grommet 13. Fuel rail
6EN0534