INTRAFIX PROJECTS PILKINGTON PLANAR™ INTRAFIX FITTINGS WERE USED ON THE EXPO PHASE 2 – RAIL AND MAINTENANCE FACILITY AND OFFICES AND LAX INTERNATIONAL AIRPORT TERMINAL 4 CONNECTOR TO CREATE A CLEAN APPEARANCE ON THE EXTERIOR OF THE FACADES. The Expo Phase 2 project was designed to be very transparent with Pilkington Optiwhite™ low-iron glass units (with low-e) and low-iron monolithic glass fins. Having no exposed fittings on the outside, concealing the point-supports inside the unit, can give a more structurally-glazed appearance than traditional point-supported glass systems that have exposed bolt heads. 6
5
4
3
2
1
D
D
C
C
B
B
905J Intrafix IGU THIS DRAWING IS THE PROPERTY, THE DESIGN AND THE COPYRIGHT OF
PILKINGTON NSG Group Flat Glass Business
TELEPHONE: 01744-692803
A
SCALE @ A3
Pilkington Architectural Alexandra Works Borough Road St. Helens England WA10 3WA FAX: 01744-692988
INFORMATION AND DETAILS TO BE TREATED IN CONFIDENCE. NOT TO BE COPIED WITHOUT PERMISSION. DO NOT SCALE DATE ALL DIMENSIONS IN MILLIMETRES
DESCRIPTION
26/03/2014
6
5
4
3
2
SD
TM
ISSUE
1
0
PROJECT Expo Phase 2 – Rail and Maintenance Facility and Offices
40 Projects | 800.452.7925
A
Pilkington Planar Typical Detail of
CLASS SECTION GLASS TYPE NUMBER
LOCATION Santa Monica, CA
ARCHITECT RNL Design