IMPLEMENTATION ASSUMPTIONS
Existing conditions The current conditions representing facilities that are existing on campus today.
194 | Chapter 3: How to Get There - Implementation
Potential buildings to be replaced These buildings have been proposed to be replaced or removed for further development.
Projects approved, pending construction and addressed in previous EIR evaluations
Proposed PMP 2039 build out and basis for current EIR
This plan represents short-term development, including facilities that are existing on campus and those that have been reviewed by the Board of Trustees and approved for construction. This includes the East Side parking structure, Corporation Yard, 600 student beds, upgraded baseball facilities, and additional space for visual arts. Proposed facilities in the 2003 master plan but not yet implemented are not included, for example the science laboratory replacement building.
The proposed 2039 Campus Master Plan (Development Plan) defines the vision for the future and identifies current buildings and Board of Trustees approved facilities as ‘existing’. Facilities that are being considered for replacement and all potential new facilities, together with open space development, are also identified.
Cal State Fullerton Physical Master Plan | 195