A&C Andalib & Collins KU Structural Group
Bailey Hall Andalib & Collins KU Structural Group
No.
Project Location: Lawrence, K.S.
Description
Date
Bailey Hall 1440 Jayhawk Blvd Lawrence, K.S.
Structural Engineering Documents
Project Manager:
Reid Poling
Lead Structural Analyst: Lead Estimator: Financial Manager: Lead Bim Coordinator:
Grant Cambell Ryan Jobe
Annie Wangles William McCann
Checker
Sheet NAME Cover SHEET gENERAL sTRUCTURAL iNFORMATION LEVEL 1 cOLUMN LAYOUT LEVEL 2 COLUMN LAYOUT LEVEL 3 COLUMN LAYOUT LEVEL 4 COLUMN LAYOUT fIRST STORY FRAMING PLAN SECOND STORY FRAMING PLAN THIRD STORY FRAMING PLAN ROOFING FRAMING PLAN LATERAL STRUCTURAL SYSTEMS LATERAL STRUCTURAL SYSTEMS LATERAL STRUCTURAL SYSTEMS LATERAL STRUCTURAL SYSTEMS TYPICAL CONNECTIONS DETAILS TYPICAL BASEPLATE CONNECTION DETAIL FIRST FLOOR LIVE LOAD DIAGRAM SECOND FLOOR LIVE LOAD DIAGRAM THIRD FLOOR LIVE LOAD Diagram FOURTH FLOOR LIVE LOAD Diagram ROOF LIVE LOAD Diagram RAIN LOAD DIAGRAM Diagram SNOW LOAD DIAGRAM EAST-tO-WEST WIND LOAD Diagram WEST-tO-EAST WIND LOAD diagram NORTH-TO-SOUTH WIND LOAD Diagram SOUTH-TO-NORTH WIND LOAD diagram SEISMIC LOAD DIAGRAM
Author
Design Team
Sheet no. S10.1 s10.2 S11.1 S11.2 S11.3 S11.4 S12.1 S12.2 S12.3 S12.4 S13.1 S13.2 S13.3 S13.4 S14.1 S14.2 S15.1 S15.2 S15.3 S15.4 S15.5 S15.6 S15.7 S15.8 S15.9 S15.10 S15.11 S15.12
Issue Date
The general scope of work consists of the structural design of a multi-story steel frame structure located in Lawrence, KS. The client shall be provided with the following engineering services: General structural planning and layout, calculation of dead, live and environmental loads, structural framing plans, lateral bracing systems, and design of structural connections. This set of structural engineering documents will only be authorized for construction after it has been reviewed, stamped, and signed by a licensed, professional enginner. Any changes made by the client to the engineering services provided regarding the project once work has commenced will require the assessment of additional engineering fees.
Drawing Index
Project Number
General Scope of work
Cover Sheet
S10.1 1/8" = 1'-0"
OR CTIO U TF NO NSTR O C
N