1 minute read

Figure 7.27. Site plan zoning

strategically located near to the bore well so that these bore wells get the recharge. All these years we have seen bore wells in surounding area getting dry, but ours always remain charged and this is only because of the harvesting system we have deployed.

7.8.18. SEAWAGE TREATMENT.

Advertisement

Water such huge green campuses requires a lot of water. Here we meet about 80% of the requirement just by recycling the wastewater. The sewage treatment plant is designed to use least of chemicals and power. Total power required to run a 150 KLD plant is 7.5 KW thus saving huge power costs. All the wastewater is channelized to the huge sewage treatment plant installed. All this sewage is treated in such a way that only a very little amount is sludge is left and all the water is treated and filled with appropriate chemical properties to be used for horticulture. This water then is supplied to the carefully designed irrigation system which is designed after carefully assessing the amount of water required in various green and plants. And the water that comes out from the STP is so rich in minerals that practically we do not require in various greens and plants. And the water that comes out from the STP is so rich in minerals that practically we do not require to use any fertilizer and the plants are always lush green!! Thus, they are not drawing any fresh water for irrigation.

Figure 7.27. Site plan zoning

Source: https://www.pathways.in/aravali/aravali_green_pathways