20. List the performance indicators to be tracked. The degree to which EOMF efforts reach landowners in Phase III will be reflected in a planned end-ofPhase III survey, similar to that conducted at the end of Phase II. Performance indicators for each of the projects alluded to above (Sections 12 and 13) are outlined in their respective work plans.
- 35 -