Hitachi centrifugal chiller gsg gxg

Page 41

5.

Instrumentation and Control

5.1 Operation Control System The load limiting control operates in two phases;

The Hitachi Centrifugal Chiller adopts as standard entire automatic operation system based on

one is to stop the vane opening action (limits opening

the micro computer incorporated in the console panel.

action only to stop the vane operation), and the other is to force vane closing action.

(a) Startup operation (d) Automatic start and stop

Pressing the start switch on the console panel

The signal detecting the chilled water outlet

first starts the oil pump. About 20 seconds after the oil pressure has increased, the main contactor is

temperature is processed in the micro computer to

activated and the main motor is started via the

activate the automatic start and stop switch. If the

reduced voltage starter. Once, after a certain period, it

load is lowered below the range of capacity control,

is switched to full voltage setting with the main motor in

the automatic start and stop switch stops the chiller

full-speed operation, the inlet guide vane (hereinafter

temporarily. After 15 minutes has passed and the load

referred to as the vane) is automatically started to

is recovered, the chiller is automatically restarted.

open via the temperature regulator circuit and the load (e) Failiure stop

limiter circuit without being over loaded. Then the

In case the safety switch is activated, the chiller

Chiller gets into routine operation to keep the chilled

stops operation with alarming beep while the cause of

water outlet temperature at a certain level.

the failure is indicated on the console panel. (b) Stop operation (f) Oil heater

Pressing the stop switch on the console panel

To prevent foaming of oil at startup, the oil

stops the operation of the Chiller, after the minimum vane openings, with the vane automatically closed completely. The oil

heater is automatically activated while the chiller is out

pump also automatically stops after about 4 minutes.

of operation so that the oil is kept at an appropriate temperature. (In order to do so, electric source for control system will be activated even when the chiller is off.)

(c) Automatic temperature regulator (with load limiting function)

(g) Emergency stop

The temperature regulator provides stable

Pressing the Emergency stop switch on the console

temperature control and load limiting control by applying the load limiting function to the entire circuit

panel stops the operation of the Chiller with the vane

and by adopting circuits unique to Hitachi such as

automatically closed completely. The oil pump also

integration and differential control functions.

automatically stops after about 4 minutes.

41