Sport Editor: Katie Bartholomew
OCTOBER 12 2012
Win? Lose? Agonising draw? Get in touch: sport@varsity.co.uk
£16m Sports Centre construction work right on track
Katie Bartholomew investigates progress at the University’s biggest ever investment in sport facilities ANTONY LEMONS
8 Badminton courts 2 Basketball courts 2 Netball courts 2 Volleyball courts 2 Five-a-side football pitches 2 Martial Arts dojos 4 Fencing pistes 9 Table tennis tables 8 Weight training platforms 1 Plyometric track Striking construction work done so far on the new Sports Centre (photograph as of 20th September 2012)
Cambridge’s ‘800 Years With No Sports Centre’ - as the student campaign protested - are nearly over. A cutting-edge sport facility moves ever closer to completion, and construction work is right on track. While students broke themselves into revision for last term’s exams, ground for the new Sports Centre was broken on 1st May 2012. Representatives from seven Cambridge sports teams attended the ground-breaking ceremony, along with the scheme’s engineers, architects and other contractors. Hannah Pennicott, representing the Blues netball team, says: “The ground-breaking ceremony for the long awaited Sports Centre was great to be part of: a good opportunity to showcase the Sports Centre plans, as well as to thank those involved with the project. Representatives from some of the sports who will use the centre were all very excited at the
prospect of having an excellent venue to train and compete in. There was much anticipation after the ceremony for the muddy field in west Cambridge to be transformed into a state-of-the-art Sports Centre – we now cannot wait for the opening ceremony!”
‘The building work is going absolutely to schedule: absolutely on time, on budget’ Since then, construction has been smooth and efficient: welcome and well-deserved news to those campaigners who fought through years of reluctance and snail-paced progression to allow the Sports Centre to be funded and built at all. Now, finally, much of the fundamental structural work has been
Just published on
AMAZON/KINDLE
completed over the summer vacation. It has brought a dramatic change to the west Cambridge site (off Madingley road), which many students may not yet have noticed. The completed centre will certainly not go unnoticed, however: the fitness suite will boast a sizable strength and conditioning wing, a threelane plyometric track and free-weights platforms; currently homeless sports – such as netball, basketball, badminton and volleyball – will be catered for by a large sports hall of two full-size basketball courts; multi-purpose rooms will provide space for fitness classes, martial arts and fencing. At sixteen million pounds, the Sport Centre indeed represents the largest financial investment in student sport facilities in the University’s history. Those keen to slam-dunk into the new basketball courts still have to wait until
****
Racing with the Devil by
Anthony Young **** The horse racing industry as you could never have imagined *********
ANTONY LEMONS
9
4 7
8
4
6
2
4
7 3
EYES ON...
TOM HILL fresh from a
5.30am pool session, talks of trunks that have kept him winning for 6 years Sport:
Swimming Event:
100m breaststroke Age:
21 Height:
191cm Weight:
85kg Varsity caps for Cambridge:
3 Personal Best:
1.05.6mins
KATHERINE MORRIS
What’s your weekly training programme? 6 pool sessions, 2 gym sessions, 1 run and 1 land training session. I usually do evenings at the pool, but make it up with a 5.30 morning session if I miss one.
Sports representatives at the ground-breaking ceremony, 1st May 2012
8 7
2 9
2 1 6 6 5
3 8
8 3
6
2
3
5
1
6 2
Any superstitions or rituals? I’ve worn the same pair of swimming trunks to warm up in for 6 years. They’ve actually got holes in them now. How did you get into swimming? My mum took me to swimming lessons when I was 4, and I’ve been competing ever since I was 9.
SUDOKU
www.amazon.co.uk
A new book by a new author and ready for download
August 2013 for the scheduled opening of these Phase 1 developments. But project leader Antony Lemons is optimistic that his team’s work is on target: “The building work is going absolutely to schedule: absolutely on time, on budget.” He hopes to be taking possession of the building on June 14th, and then to begin commissioning. “This next part of the year will be extremely busy
with marketing the facilities, setting up price structures and really ensuring that we staff it correctly. We want to hit the ground running with new members in August next year. There’s still an awful lot to do, but we’ve got it in hand.” Mr Lemons also drew attention to other improvements to sporting facilities: namely, the summer refurbishment of the hockey pitches at Wilberforce Road Sports Ground. The new sand-dressed, colourcoded surface – which is “up there with the best surfaces in the UK” – came into use for league matches last week. A dip in the proposed 50m swimming pool would require a slightly longer academic commitment for those studying here now. Keen swimmers should consider PhD proposals: this next venture lacks, as yet, funding. Indoor tennis courts have also been proposed for a potential second phase. For now, Cambridge students can be confident that completion of the Sports Centre is less than a year away.
SPORT 31
7
Injuries along the way? As I do breaststroke, loads of knee problems. I normally can’t train for about a month every season because of my knees. Sporting hero? Kosuke Kitajima - best breaststroker who’s ever lived Rivals? I used to train with an Olympian (Andrew Willis): so I never won any competitions for my club, but it’s done me good working with someone so fast. Here, a guy who swims the same stroke as me was doing an MPhil at Cambridge, but now he’s doing a PhD at Oxford... Best gym in Cambridge? I only use my college gym, at Jesus. What’s a blues swimmer’s diet? I eat when I’m hungry! Usually 5 meals a day. But I suppose no fatty foods for a few days before a race.
● To get involved with Cambridge Univer sit y Sw imming and Water Polo Club cont act c.u.swimmingandwaterpolo@sport. cam.ac.uk