1 minute read

THE WEST

Next Article
THE ATRIUM

THE ATRIUM

Professional Work: STUDIOS Architecture

Supervisor: Kristian Passinita & Jose

Advertisement

Located in Cupertino, this office serves the Legal team of a tech company. The design brings together the flexibility and collaboration opportunities inherent to tech workplaces with a warm, sophisticated palette suited to this forward-thinking Tech Client. We overhauled an outdated work floor with a timeless and functional design that feeds natural light to the central lounge and assistant bays. We also placed a continuous linear band of light between two parallel fabric panels bringing more light into the space while providing acoustic treatment and gave new life to the existing private office.

Proposed Plan - Level 1

Demolition Plan - Level 1

Declaimer: All the drawings in this project belong to STUDIOS Architecture

Elevation - Breakroom - Back Counter

Section at Pantry Sink Detail - Ceiling Edge detail at Recessed Channel and GWB Bulkhead

Enlarged Plan - Break Room and Meeting Room

Enlarged Plan - Break Room and Meeting Room

Elevation - Level 1 - Lounge & Tech Concierge East

Elevation - Level 1 - Hallway Millwork

Section at Lounge Shelving and Full Storage Cabinet

Declaimer: All the drawings in this project belong to STUDIOS Architecture

The Warehouse

Professional Work: TEF Design Supervisor: Justin Blinn & Ivana Pilipovic vertically enlarged openings that also provide interior stairwell opening infill window to be multi-lite, while new window area to be detailed to contrast

Originally constructed in 1941 as a warehouse for WWII efforts, Building 2 is a simple rectangular concrete structure with large multi-lite windows at each facade. The building is oriented in the north-south direction with loading access at the north, west, and east facades. A sixth floor addition was built in 1944 as a drafting studio. The project entails base building rehabilitation, including envelope improvements and structural retrofit, and adaptive reuse for commercial office use. Building systems, including HVAC, electrical, plumbing, and fire protection, will be all new. The project also includes new vertical circulation elements complying with modern egress requirements, including new elevators and egress stairs.

First Floor Plan

Proposed West Entry Elevation & Plan

Proposed Section of Entry Storefront

Proposed East Entry Elevation & Plan

Declaimer: All the drawings in this project belong to

This article is from: