UVM Comprehensive Campus Renewable Energy Feasibility Study

Page 447

UVM Campus Renewable Energy Feasibility Study Building: University Heights North 1

2. Installed cost includes all materials, labor, design, engineering‌etc. based on observed market conditions in Q2 2012. 3. Roof substrate is assumed to be Standing Seam Metal or similar and fully adhered. 4. Roof conditions should be field verified and confirmed to be OK for installation. Coordinate with manufacturer to ensure continuation


Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.