AustralianNew Zealand Line
129
â–Ą Citizens participate in the jointly designed Urban Forest District Plan Project
collection network. By collecting rain
construction of project to build a series
water, 25% of green irrigation water
of major model projects. For example,
demand can met each year. Even during
with the design concept of wetland of rain
the drought season, the network can still
processing type in Melbourne Royal Park,
work at a low cost and in an efficient way
an artificial wetland and rain recycling
to ensure municipal water supply.
system project has been proceeded.
(3) Emphasizing the application
Also, on Collins Street, sewage filter
of green technology, with a focus on
processing device, water for spray, rain
building green demonstration project
recycling device, as well as underground
Melbourne city construction, with
sewage pipeline have been perfectly
going green and harmony as the theme,
combined to water trees along the street.
has innovatively integrated new concept,
Among them, the most impressive one
materials, and technology into the
is a six-star green building of the No. 2