Skip to main content

Learning from Cities - The 2nd Guangzhou International Award for Urban Innovation

Page 121

Asian-African Line

105

Besides, because the public do not

one is canal-digging project. The severe

trust the government, it is no easy to

accumulation of dirt has reduced the

persuade them to accept the project led

water resources management capacity of

by the government. In fact, the local

many rivers and canals. In cooperation

residents resist forcefully to cooperate

with the central government as well as

with the government in the initial phase

with the help of the World Bank and

and ask for unreasonable compensation

the government of Netherlands, Jakarta

fees. The crucial steps to overcome this

is carrying out a major canal-digging

barrier lie in the frequent contact between

project, involving 13 river channels and 5

the government leaders and the dwellers

reservoirs.

to improve the public recognition for the

The project is committed to reducing

project. The governor himself directly

the coverage of flood danger in the region

came and consoled the people, listened

from 203 square kilometers down to 144

to their problems and aspirations as

square kilometes. Besides, the government

well as communicated frequently. At

of Jakarta Special District provided about

the same time, he called on the private

USD 6.2 million for the construction

sectors to donate furniture for the new

of water wells, embankments and other

housing to attract the residents. In

flood control infrastructure. Specifically,

terms of explaining the importance of

there are six major measures: First,

maintaining the reservoir area, he spared

accelerating the recovery of three long

no efforts to do various work. Through

rivers (Ciliwung River, Pesanggarahan

communication, the government managed

River and Sunter River), which currently

to persuade reservoir dwellers finally and

only have a width of 15 meters, but

eliminate their resistance, thus setting a

will be expanded to 50-60 meters in the

good example for other similar projects.

future. Second, building a new drainage system in the city. Third, building large

5. Overall Strategy Layout for

reservoirs, such as Ciawi and Cimanggis.

Water Control

Fourth, building soakaways. It plans to

Pluit Reservoir Revitalization

build 20,000 wells with a width of over

Project constitutes only a part of the

one meter. These soakaways will quickly

overall strategy layout for water control

absorb water within 4 hours. Fifth,

in Jakarta. Whether the project can be

building a multifunctional tunnel, which

truly effective or not depends on the

can be used as a water storage facility in

coordination of other projects. The first

rainy season and as the road or highway


Turn static files into dynamic content formats.

Create a flipbook