RIDDLE-PACE FIELD
Riddle-Pace Field Essentials • First game played at current location in 1931 • In 2008, Riddle-Pace Field underwent a $4.7 million renovation • Stadium constructed of red brick and exposed steel beams • Fully air-conditioned, state-of-the-art press box which features a 500-square foot media center and two 12x15 VIP suites with theatrestyle seating • Complex includes locker room facilities, coaches offices and covered batting cage • Right field wall is 27-feet tall and 30-feet tall at scoreboard • Wall contains state-of-the-art scoreboard and sound system • The playing surface at Riddle-Pace Field was replaced in Dec. 2014