Tiffany Fu
Town Square Neighborhood Development Miami Team: Mitch Hirsch, Celia Toche, Tiffany Fu Phases: Concepts
4 | DYNAMIC USE OF URBAN USES CULTURAL PUBLIC PARKING RESIDENTIAL RETAIL EDUCATIONAL ENTERTAINMENT HOTEL OFFICE
PAGE 29
1 | ORGANIZED PUBLIC OPEN SPACE 3 | BALANCED LOCAL DENSITIES ORGANIZED PUBLIC OPEN SPACES NEIGHBORHOOD FABRIC : MEMORABLE SPACES AND OBJECTS
Chain of greens Bicycle Path Pedestrian Path
2 | CONNECTIVITY Bus ATStopsCRITICAL SCALES Public Open Space
MICRO CONNECTIVITY
PAGE 19
MACROMACRO CONNECTIVITY CONNECTIVITY
PAGE 28
20TH ST.
NE 2ND AVE
TEMPLE ISRAEL OF GREATER MIAMI
MARGARET PACE PARK
NE 19TH ST
BISCAYNE SKATE PARK
1800 CLUB CONDOS
N BAYSHORE DR
BISCAYNE BLVD
NE 4TH AVE
N MIAMI AVE.
CITY OF MIAMI CEMETERY
NE 18TH ST
BAY PARK PLAZA APARTMENTS
NE 17TH TERRACE
DORSEY PARK WOMEN’S CLUB NE 17TH ST.
BISCAYNE BLVD
NE 2ND AVE
NE 16TH ST.
OMNI INTERNATIONAL MALL
NE 1ST CT
NE MIAMI PL
NE 1ST AVE.
NE MIAMI CT
NE MIAMI AVE
TRINITY CATHEDRAL
NE 15TH ST. MIAMI DADE COUNTY PUBLIC SCHOOLS
NE 14TH ST.
NE 1ST CT
NE MIAMI PL
NE 1ST AVE.
ADRIENNE ARSHT CENTER PERFORMING ARTS
BISCAYNE BLVD
NE 2ND AVE
NE 13TH ST.
NW 1ST AVE. NE 11TH ST.
NE MIAMI AVE
NE 1ST AVE.
MUSEUM PARK NE 10TH ST.
NE 9TH ST.
NE 8TH ST.
NE 2ND AVE
AMERICAN AIRLINES ARENA
NE 7TH ST.
Chain of greens
Major Vehicular Passways
Chain of greens
Biscayne/Brickell Trolley
Bicycle Path
Rail Systems
Pedestrian Path
3 | BALANCED LOCAL DENSITIES Bus Stops MIAMI 21 BUILDING CODE DISTRICTS
PAGE 20
MIAMI 21 ALLOWABLE HEIGHT DENSITY
BALANCED LOCAL DENSITIES
20TH ST.
NE 2ND AVE
TEMPLE ISRAEL OF GREATER MIAMI
MARGARET PACE PARK
NE 19TH ST
BISCAYNE SKATE PARK
1800 CLUB CONDOS
N BAYSHORE DR
BISCAYNE BLVD
NE 4TH AVE
N MIAMI AVE.
CITY OF MIAMI CEMETARY
NE 18TH ST
BAY PARK PLAZA APARTMENTS
NE 17TH TERRACE
WOMEN’S CLUB NE 17TH ST. 20TH ST.
TEMPLE ISRAEL OF GREATER MIAMI
NE 2ND AVE
1800 CLUB CONDOS
CITY OF MIAMI CEMETARY
N BAYSHORE DR
BISCAYNE BLVD
N MIAMI AVE.
NE 1ST AVE.
NE 1ST CT
NE MIAMI PL
NE MIAMI AVE
NE MIAMI CT
TRINITY CATHEDRAL
MARGARET PACE PARK
NE 19TH ST
BISCAYNE SKATE PARK
NE 4TH AVE
BISCAYNE BLVD
NE 2ND AVE
NE 16TH ST.
OMNI INTERNATIONAL MALL
NE 18TH ST
BAY PARK PLAZA APARTMENTS
NE 15TH ST. NE 17TH TERRACE
MIAMI DADE COUNTY PUBLIC SCHOOLS WOMEN’S CLUB
NE 17TH ST.
NE 14TH ST.
OMNI INTERNATIONAL MALL
NE 1ST CT
NE MIAMI PL
NE MIAMI CT
TRINITY CATHEDRAL
NE 15TH ST.
BISCAYNE BLVD
NE 2ND AVE
NE MIAMI AVE
ADRIENNE ARSHT CENTER PERFORMING ARTS
NE 1ST AVE.
NE 1ST CT NE 13TH ST.
BISCAYNE BLVD
NE 2ND AVE
NE 1ST AVE.
NE MIAMI PL
NE 16TH ST.
MIAMI DADE COUNTY TY Y PUBLIC SCHOOLS
NE 14TH ST.
NE 1ST CT
NE MIAMI PL
NE 1ST AVE.
BISCAYNE BLVD
NW 1ST AVE.
NE 11TH ST.
ADRIENNE ARSHT CENTER PERFORMING ARTS
NE 2ND AVE
NW 1ST AVE.
NE 13TH ST.
NE 11TH ST.
NE MIAMI AVE
NE 9TH ST.
NE 1ST AVE.
NE MIAMI AVE
NE 1ST AVE.
BICENTENNIAL PARK NE 10TH ST.
BICENTENNIAL PARK NE 10TH ST.
NE 9TH ST.
NE 8TH ST.
NE 8TH ST.
NE 2ND AVE
NE 2ND AVE
AMERICAN AIRLINES ARENA
AMERICAN AIRLINES ARENA
NE 7TH ST.
NE 7TH ST.
T6-80-O T6-80-O
8080-*Unlimited - *UNLIMITED STORIES Stories
T6-12-O T6-12-O
T6-60A-O 6060-*Unlimited Stories T6-60A-O - *UNLIMITED STORIES
T6-08-O T6-08-O
T6-36B-O T6-36B-O
Stories 3636-*60 - *60 STORIES
D1 D1
T6-24-O T6-24-O
2424-*48 - *48 STORIES Stories
D2 D2
Stories 12 12-*20 - *20 STORIES
C1C1
CIVIC INSTITUTION Civic Institution
30+Floors Floors 30+
Stories 8 - 8-*12 *12 STORIES
CS CS
Civic Space CIVIC SPACE
11-29 Floors 11-29 Floors
8 - 8-*10 *10 STORIES Stories
T4-R T4-R
3 Stories 3 STORIES
3-10 Floors 3-10 Floors
8 Stories 8 STORIES
T3-O T3-O
2 Stories 2 STORIES
1-2 Floors 1-2 Floors
WITH bonus BONUS HEIGHTS **with heights
PAGE 27
This master plan prescribes a chain of green parks to link the Omni downtown area of Miami to the beachfront. These twenty-seven blocks are composed of a gradient of towers and podiums, ranging in setbacks, heights, footprints, and program. I was responsible for the drawings, diagrams, and models (both digital and physical) for this project.
Render by Bo Sun
5 | SUPPORTING LANDMARKS
SUPPORTING LANDMARKS
20TH ST.
NE 2ND AVE
TEMPLE ISRAEL OF GREATER MIAMI
MARGARET PACE PARK
NE 19TH ST
BISCAYNE SKATE PARK
1800 CLUB CONDOS
N BAYSHORE DR
NE 4TH AVE
BISCAYNE BLVD
N MIAMI AVE.
CITY OF MIAMI CEMETERY
NE 18TH ST
BAY PARK PLAZA APARTMENTS
NE 17TH TERRACE
DORSEY PARK WOMEN’S CLUB
NE 17TH ST.
BISCAYNE BLVD
NE 2ND AVE
NE 16TH ST.
OMNI INTERNATIONAL MALL
NE 1ST CT
NE MIAMI PL
NE 1ST AVE.
NE MIAMI AVE
NE MIAMI CT
TRINITY CATHEDRAL
NE 15TH ST. MIAMI DADE COUNTY PUBLIC SCHOOLS
NE 14TH ST.
NE 1ST CT
NE 1ST AVE.
NE MIAMI PL
BISCAYNE BLVD
NE 2ND AVE
NE 13TH ST.
ADRIENNE ARSHT CENTER PERFORMING ARTS
NW 1ST AVE. NE 11TH ST.
NE MIAMI AVE
NE 1ST AVE.
MUSEUM PARK NE 10TH ST.
NE 9TH ST.
NE 8TH ST.
NE 2ND AVE
AMERICAN AIRLINES ARENA
NE 7TH ST.
PAGE 31
Tokyo 2020 Olympic Stadium
Team: Mitch Hirsch, Gregg Jones, Rob Narracci, Peter Fotlett, Tiffany Fu, Alicia Cerna, Ben Galtney, Dylan Hames, Chrissy Fazio Phases: Competition Renders by Crystal Renders
Louver Studies
This proposal was PCPA’s entry for the 2020 Tokyo Olympic Stadium Competition. The landscaped terraces were intended to give a warm and soft atmosphere, rather than the typical sleek, hard feel of most stadiums. I created design iterations for massing and envelope enclosures. Most notably, I designed a Grasshopper definition which allowed us to quickly and flexibly create louver patterns to apply to our building. This was inspired by a Muji textile pattern, and was very well received by our team members.
Muji Textile Sample
Grasshopper Definition for Randomized Louvers
Utah Performing Arts Center
Team: Mitch Hirsch, Gina Narracci, Tiffany Fu, Carl Cornilsen, Dylan Hames, Katy Harp Phases: Competition, Schematic Design, Design Development
Renders by Steel Blue
30' TRUCK
UTILITY VAULT
Facade Model MECHANICAL ROOM
STAGE MGR BACKSTAGE PANTRY
JAN CREW LOCKERS
MECHANICAL ROOM INACCESS. MECHANICAL ROOM
6 P. DRESSING ROOM
INACCESS. 4305
4302
4301
MARQUEE/ CANOPY ABOVE CAFE 1196 SF
+1 +1 FOH ELEV 2 ELEC ROOM 12x10 21
CONCESS MGR
21
21
JAN
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
STAR/1P. DRESSING ROOM
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
BAR STOR 250sf
OPEN TO -11 BELOW
4304 HALL EGRESS STAIR
FOH EGRESS STAIR ELEC ROOM 10x12
STAGE RECEIVING
FOOD SERVICE TRASH
RUN CREW STOR
FOOD SERVICE RCV'G
GEN STOR 1/3
0'
EMERG GENERATOR 20x7x7h
STAR/1P. DRESSING ROOM
ADMIN 844 sf
4306
STAGE DOOR LOBBY STAGE DOOR SECURITY
4303 REH RM STAIR
REH RM LOBBY
0' (4305)
-4' (4301)
RETAIL 520 SF
-1'
4304
MID-BLOCK WALKWAY 1 4 '-0"
PLAZA 4303
Programming on the Site 4302
4301
0' (4305)
BAR
FOH EGRESS STAIR
ROOF FOH ELEV 2 ELEC ROOM 12x10
+21'6 21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
23
23
21
21
21
21
21
21
21
23
23
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
23
23
21
21
21
21
21
21
21
23
23
21
21
21
21
21
21
21
21
21
21
21
21
21
21
23
23
21
21
21
21
21
21
21
23
23
21
21
21
21
21
21
21
23
23
21
21
21
21
21
21
21
21
21
21
21
21
21
21
23
23
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21 21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
23
23
21
21
21
21
21
21
21
23
23
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
23
23
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
23
23
23
23
21
23
23
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
23
23
21
21
21
21
21
21
21
23
23
21
21
21
21
21
21
23
23
21
21
21
21
21
23
23
21
21
21
21
21
21
21
23
23
21
21
21
21
21
21
21
21
23
23
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
+21'6
21
21
21
21
21
21
21
21
JAN
21
21
21
21
21
21
21
21
21
21
21
21
21
VEST
21
21
21
21
21
21
23
23
21
21
21
21
21
21
21
21
COAT RM
21
21
21
FOH STORAGE
21
21
4307 21
4308
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
FOH STORAGE
23
21
21
21
21
21
21
21
RETAIL 1200 SF USHERS' LOCKERS
23
21
21
21
21
21
21
21
LOBBY
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
+5
23
21
21
21
21
21
21
21
OPEN TO BELOW
23
21
21
21
21
21
21
21
STAR/1P. DRESSING ROOM
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
COUNTERWEIGHT PIT
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
ELEC ROOM 9x12 4309
23
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
BOH EGRESS STAIR
BAR
23
21
21
21
21
21
21
21
21
21
21
21
21
21
21
DROPOFF AT GALLERIA
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
+5 (4310)
23
21
21
21
21
21
21
21
21
21
21
21
21
21
21
GALLERIA
23
21
21
21
21
21
21
21
21
21
21
21
-11
21
21
21
21
21
21
21
21
21
21
21
21
+5 (4310)
23
21
21
21
21
21
21
21
21
21
21
21
21
21
HALL EGRESS STAIR
23
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
TELECOM ROOM
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
COAT ROOM 320sf FOH EGRESS STAIR
23
21
21
21
21
21
21
21
21
21
21
21
21
21
21
ROAD BOX STORAGE
23
21
21
21
21
21
STAR/1P. DRESSING ROOM
21
21
21
21
21
21
21
21
21
21
21
TOWER LOADING DOCK
21
21
21
21
21
21
21
21
ELEC ROOM 10x12
21
21
21
21
21
21
21
21
SALES KIOSK
BAR
21
21
21
21
21
PATRONS' BALCONY
21
21 21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
PIT WAGON STORAGE ABOVE
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
4310
21
21 21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
BOH EGRESS STAIR
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
4310
JAN
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
WOMEN
FURN STOR
FOH ELEV 1 ELEC ROOM 10x12
INACCESS
+13'6
+13'6
+13'6
+12'6
+13'6
(BOXES ABOVE)
+12'6
+25'9
+21'6
FOH STOR
+24'3
HALL EGRESS STAIR
+24'0
F/S ELEV-3
21
21
21
21
21
21
21
LIGHTING CONTROL BOOTH 21
+5
INACCESS
21
+1 21
+5
21
4306
21
TOOL ROOM BAR HOUSE SOUND BOOTH
21
+5
FOH STOR
21
FREIGHT ELEV-5
PATRON SERVICES
21
BOH EGRESS STAIR
LOBBY/ WINTER GARDEN
21
4307
21
12 P. DRESSING ROOM
21
21
21
21
21
21
21
21
21
21
21
WARDROBE
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
-9'
PROGRAM STOR
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
OPEN TO BELOW
21
21
PERFORMERS' LOUNGE 21
6 P. DRESSING ROOM -18'6
1 2'-0" FOH ELEV 1
21
JAN SUPPLY STORAGE DROPOFF AT PARKING LANE BOX OFC STOR
21
PAINT STOR +5 FOH EGRESS STAIR
HOUSE MGR
21
BAR STAFF LOCKERS 12 P. DRESSING ROOM COPY/ WORK RM
F/S ELEV-3
VISTING CO OFC MAINT OFC CREW LOUNGE & LOCKER BOX OFC MGR
21
TELECOM ROOM
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
A/V SHOP BOX BOX OFC WINDOW OFC STAFF
21
ELEC DISTR ROOM 9x16
16 P. DRESSING ROOM CONNECTION TO OFFICE LOBBY TBD
21
BLDG ENG OFC LIGHTING STORAGE MARQUEE/ CANOPY ABOVE
21
-18'6
LAUNDRY 16 P. DRESSING ROOM
21
GENERAL STORAGE 500sf BLACK BOX STORAGE 300sf
21
-3'6
WIGS
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
COUNTERWEIGHT PIT ABOVE
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
INACCESS.
FOLDING GLASS WALL SYSTEM
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
ELEC DISTR ROOM 12x12
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
-18'6
21
HALL EGRESS STAIR 21
21
21
21
21
21
21
21
21
21
21
21
21
21
-3'6
MUSICIANS' LOCKERS & ASSEMBLY
21
FOH EGRESS STAIR 21
21
21
21
21
21
21
21
21
21
21
21
HALL EGRESS STAIR
JAN
21
21
21
21
21
21
21
21
21
21
21
FOH ELEV 1
F/S ELEV-3
21
21
21
21
21
21
21
6 P. DRESSING ROOM
21
ELEC DISTR ROOM 12x12 21
21
21
21
21
21
21
ELEC DISTR ROOM 11x14
JAN
PRDTN OFC
TELECOM ROOM 8x10 21
TELECOM ROOM
UTILITY VAULT
TD/IATSE OFC
FOH ELEV 2
PLENUM
21
COAT ROOM 830sf
21
JAN
21
21
LOBBY
21
FOH EGRESS STAIR
21
AHU-1 MECHANICAL ROOM
21
21
4313
4312
4311 4312
MEN
4311
PATRONS' LOUNGE LOUNGE SUPPORT
PATRONS' BALCONY
+21'6
+11'6 HALL EGRESS STAIR
+10'6 ELEC ROOM 8x16
ROOFTOP MECH FROM BASEMENT
+11'6
+10'6
+23'1
ELEC ROOM 8x16
DANCE WARMUP 1260 sf
+25'
PERF TLT
BAR STOR
0' PERF TLT
6 P. DRESSG ROOM
6 P. DRESSG ROOM
AIJ
45' x 65' MULTI-PURPOSE BLACK BOX
+25' BOH EGRESS STAIR
BOH EGRESS STAIR
OFF STAGE WING MEN
JAN
DROPOFF AT STAGE DOOR
REH RM STAIR
REH ELEV-4
S&LL
FREIGHT ELEV-5
0' FREIGHT ELEV-5 WOMEN
AIJ
4305
S&LL REH ELEV-4
BLACK BOX LOBBY
+25'
FOH ELEV 2 ELEC ROOM 12x10
+39'2 +39'10
+41'10
AMP RACK
HALL EGRESS STAIR
ROOFTOP MECH FROM BASEMENT
AMP RACK LIGHTING CNTRL ROOM FOH ELEV 2 ELEC ROOM 12x10 21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
FOLLOW SPOT BOOTH 21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
FOH ELEV 1
21
21
21
21
21
21
21
21
21
21
21
21
+23'1
21
+35'10 21
21
21
21
21
21
21
21
21
21
OPEN TO BELOW
21
21
21
21
21
21
21
21
21
21
TERRACE
21
21
21
21
21
21
21
21
21
21
21
+5
21
21
21
21
21
21
21
21
21
21
21
+23'1
21
21
21
21
21
21
21
21
21
21
+35'10
21
21
21
21
21
21
21
21
21
21
+24'3
21
+37'10 21
+24'3 FOH EGRESS STAIR
21
+25'9 +36'
21
(BOXES BELOW) ELEC ROOM 9x14
21
21
21
21
21
21
21
21
21
21
+25'9
21
21
21
21
21
21
21
21
21
21
+25'9 (BOXES BELOW)
21
21
21
21
21
21
21
21
21
21
+41'10
V-VIP LOUNGE
21
21
21
21
21
21
21
21
21
21
21
+39'10
ROOF TERRACE
21
21
21
21
21
21
21
21
21
21
21
21
HALL EGRESS STAIR
21
21
21
21
21
21
21
21
21
21
FOH STOR
21
21
21
21
21
21
21
21
21
21
+39'2
21
21
21
21
21
21
21
21
21
21
21
BAR STOR
21
21
21
21
21
21
21
21
21
21
21
FOH ELEV 1
F/S ELEV-3
+39'2 21
21
21
21
21
21
21
21
21
+39'2
21
21
21
21
21
21
21
21
ELEC ROOM 10x12
DIMMER ROOM
Massing Study JAN
FOH EGRESS STAIR 21
21
21
21
21
LOBBY
21
21
OPEN TO BELOW
21
LOBBY
21
FOH EGRESS STAIR
21
TERRACE
21
21
BAR LOUNGE STORAGE
LOUNGE SUPPORT
+39'2
LOUNGE COAT RM
+37'10 FLY GALLERY ELEC ROOM 10x12 TELECOM ROOM
ROOF TOP MECHANICAL
DIMMER ROOM HALL EGRESS STAIR
ELEC ROOM 10x12
+39'10 FOH EGRESS STAIR INTERMEDIATE GALLERY
FORESTAGE GRID 25'x60'
ELEC ROOM 10x12
+36'
ELEC ROOM 10x12
This 2500-seat theater is located in a very urban and constricted part of Salt Lake City. This building features a broadway house, a sixty-foot high winter garden, a black box theater, a cafe, and retail elements. I studied the complexities and intricacies of programming the theater onto this tight site, as well as master planning the block and overall massing for the building. The project was studied in both Rhino and Revit, and I served as BIM coordinator with our associate architects and consultants.
HALL EGRESS STAIR
TENSION WIRE GRID REH RM STAIR
Take Apart Model
Hall Interiors
Facade Options
mASTERPLAN STudIES
mASTERPLAN STudIES
Base Diagram
Connectivity
Main Street Facade Study - east Side
SITe
TrIBune BuILDInG
HerALD BuILDInG WALKer BuILDInG
EET
TRIBuNE BuILdINg
REg
ENT
STR
mA
IN
ST
RE ET
100 S OuTH
wALKER CENTER Pelli Clarke Pelli Architects
Master Planning Issues Main Street Facade Study - West Side
Site Regulating Lines
PAGE 22
PAGE 16 KeArnS BuILDInG DAFT BuILDInG
ZIOn’S BAnK
Enlivening an Alleyway Tower Adjacency Options
PAGE 17
Although our documentation was recorded with Revit and CAD, most of experimental studies were done through iterative modeling exericises. This process was used to study the master planning, hall interior, facade, and massing.
Yedioth Ahronoth Tower
Team: Mitch Hirsch, Celia Toche, Tiffany Fu, Chrissy Fazio Phases: Concepts
Renders by Bo Sun
This mixed-use tower is located in the heart of Tel-Aviv, Israel. It stands as a slender, almond-shaped icon that tapers towards the top. The project has been tried and tested through many months of rigorous calculations and market predictions, transforming in scale, shape, and character meanwhile. My role in this project involved creating drawings, digital modeling tower iterations, creating physical models, calculating adjusted area differences, and creating packages for clients.
RETAIL RESIDENTIAL OFFICE
2B
CORPORATE SUITES CIRCULATION
RETAIL
CORE
RESIDENTIAL OFFICE
YEDIOTH AHRONOTH CORPORATE SUITES CIRCULATION CORE
PELLI CLARKE PELLI ARCHITECTS MAY 1, 2012
SERVICE
31
SERVICE PARKING
PARKING
YEDIOTH AHRONOTH PELLI CLARKE PELLI ARCHITECTS MAY 1, 2012 29 2BYEDIOTH AHRONOTH PELLI CLARKE PELLI ARCHITECTS MAY 1, 20
N
YEDIOTH AHRONOTH
PELLI CLARKE PELLI ARCHITECTS MAY 1, 2012
30
OPTION 2B A1204 TELͲAVIV SELECTED PROGRAM STRATEGY FLOORPLATES VARY Ͳ TAPERED
Program
v2
Floor Height
Top of Floor Floorplate
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32
13 9 7 4.5 3.9 3.9 3.9 3.9 3.9 3.9 3.9 3.9 3.9 3.9 3.9 3.9 3.9 3.9 3.9 3.9 3.9 3.9 3.9 3.9 3.9 3.9 3.9 3.9 3.9 3.9 3.9 3.9 3.9 3.9 3.3 3.3 3.3 3.3 3.3 3.3 3.3 3.3 3.3 3.3 3.3 3.3 3.3 3.3 3.3 3.3 3.3 3.3 3.3 3.3 3.3 3.3 3.3 3.3 3.3 3.3 3.3 3.3 3.3 3.3 3.3 5
REQUIRED PROGRAM Retail Component Corporate Suites Office Amenities and Mechanical
20,000 8,000 45,000 incl
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64
Retail Retail Retail Mech Corp Suites Corp Suites Corp Suites Corp Suites Office Office Office Office Office Office Office Office Office Office Office Office Office Office Office Office Office Office Office Office Office Office Office Ameni+Mech Ameni+Mech Residential Residential Residential Residential Residential Residential Residential Residential Residential Residential Residential Residential Residential Residential Residential Residential Residential Residential Residential Residential Residential Residential Residential Residential Residential Residential Residential Residential Residential Residential Residential Residential
1 2 3 1 2 3 4 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Apartments total program
22 29 33.5 37.4 41.3 45.2 49.1 53 56.9 60.8 64.7 68.6 72.5 76.4 80.3 84.2 88.1 92 95.9 99.8 103.7 107.6 111.5 115.4 119.3 123.2 127.1 131 134.9 138.8 142.7 146.6 150.5 153.8 157.1 160.4 163.7 167 170.3 173.6 176.9 180.2 183.5 186.8 190.1 193.4 196.7 200 203.3 206.6 209.9 213.2 216.5 219.8 223.1 226.4 229.7 233 236.3 239.6 242.9 246.2 249.5 252.8 257.8
sm sm sm uded
5246 ** 5246 ** 5246 ** 1745 1744 1744 1743 1742 1740 1739 1738 1737 1736 1735 1734 1732 1731 1730 1728 1727 1726 1724 1723 1721 1720 1718 1717 1715 1713 1712 1710 1708 1412 1411 1410 1409 1408 1406 1405 1404 1402 1401 1400 1398 1397 1395 1394 1393 1391 1390 1388 1387 1384 1383 1382 1380 1378 1377 1375 1373 1371 1370 1368 1368 SCHEME 2C 15738 6973 39706 1708
52,000 sm
44510
125,000 sm
110,380
**NOTE Final Retail areas / configuration to be reconciled with tower expression at the ground and pedestrian corridors and Azreili coordination.
HRONOTH
PELLI CLARKE PELLI ARCHITECTS MAY 1, 2012
28
Mandarin Oriental Hotel
Team: Mitch Hirsch, Celia Toche, Tiffany Fu, Chrissy Fazio, Carl Cornilsen Phases: Competition, Concepts
This 180-key Mandarin Oriental Hotel in Costa Mesa, California was a commission our team won through a competition. During concepts phase, we explored many different typologies for the program on the site - tower, terraces, bungalow, courtyards, etc. After much analysis and client feedback, we developed a double courtyard scheme with a feature ballroom overhanging the hotel driveway. My responsibilities for this project included creating drawings, digital modeling, physical modeling, creating diagrams, and assembling client presentations.
Mitikah C-Tower
Team: Mitch Hirsch, Celia Toche, Chrissy Fazio, Tiffany Fu Phases: Design Development
Renders were outsourced.
This mixed-use tower in Mexico City is the tallest of a master plan designed by PCPA. Its smooth and elegant form is deceivingly simple, for its 3D curved and tapered nature makes the building a complex geometry to rationalize. I was first brought onto the project to rationalize the facade pattern as NURBS onto the tower RHINO model. I then joined the team to create DD drawing documents for plans, sections, and details.
1.1
1.11
3 A-5.01
1.9
1.89
0.6
3
FL 20
3.6
1.1
2
1.11
3
0.6
3.6
1
1.9
1.89
0.6 0.5
0.5
0.6
0.61
2
14
1.9
1
FL 19
130 MAYORAZGO HOTEL AND CONDO TOWER
1.89
5
15
0.6
1
ID City | OR-B
Project Management Paseo de la Reforma 965 Col. Lomas de Chapultepec Mexico D.F., C.P. 11000
0.6
7.2
0.6
9
1.9
1.89
0.6
0.6
1.1
6
IDEURBAN
Technical Direction & Construction Montes Urales 105 Lomas de Chapultepec Mexico D.F., C.P. 11000
1.11
10
Pelli Clarke Pelli Architects
4
Core & Technical Direction Prado Norte 125-PB Lomas De Chapultepec Mexico D.F. 11000
1.1 1.9
1.89
3.6
9
0.6
0.6 1.1
FL 17
1.11
2
WSP Cantor Seinuk
Structural Engineering 228 E. 45th St, 3rd Floor New York, NY 10017 USA
1
4
Exterior Expression & Envelope 1056 Chapel Street New Haven, CT 06510 USA
Roy Azar Architects
1.11
2
FL 18
Israel Berger & Associates Curtainwall Engineering 232 Madison Avenue New York, NY 10016 USA
3.6
Cosentini Associates
2 A-5.01
3
ELEVATION
A-5.01
1:50
SECTION 1:50
RTKL
B SHEET KEY NOTES: 1.MATERIAL DESIGNATIONS
1 2
4
A
IGU WITH CUSTOM COLOR SOLID FRIT ON SURFACE #2
4
IGU WITH CUSTOM COLOR SOLID FRIT ON SURFACE #2
5
IGU WITH CUSTOM COLOR SOLID FRIT ON SURFACE #2
6
IGU WITH CUSTOM COLOR SOLID FRIT ON SURFACE #2
7
STOREFRONT VISION GLASS - CLEAR LOW IRON
8 9
11
17.8
VISION GLASS IGU: VIRACON VRE1-46 (TYP) VISION GLASS IGU WITH SHADOW BOX
3
10
8.48
STRUCTURAL GLASS FIN PAINTED METAL VERTICAL ELEMENT AS LABELED SHEETS A - 3.06 THROUGH A - 3.21 PAINTED METAL HORIZONTAL ELEMENT AS LABELED SHEETS A - 3.06 THROUGH A - 3.21
Retail Design 1717 Pacific Avenue Dallas, TX USA
GDU
Landscape Design Fernando Montes de Oca #4 Colonia Condesa, Delegacion Cua Mexico D.F. 06140
Grupo Arquitech
Retail Executive Architect Adolfo Lopez Mateos No. 597 Mexico D.F., C.P. 11830
VDA
Vertical Transportation Consultants 5 Regent Street, Suite 524 Livingston, NJ 07039 USA
PAINTED METAL - VERTICAL MULLION, NOT EXPRESSED
12
PAINTED METAL - HORIZONTAL MULLION, NOT EXPRESSED
13
IN-SWING HOPPER WINDOW
14
CUSTOM COLOR PAINTED METAL LOUVER
15
62% OPEN METAL MESH PANEL
Submissions and Revisions: Date
Description
1/10/2012 DESIGN DEVELOPENT PROGRESS PRINT
16
CURTAIN POCKET AND ROLLER SHADE
17
CANOPY/TERRACE
18
VERTICAL TRUSS ELEMENTS - STRUCTURAL
BLACK RED RED GREEN YELLOW 1.55
MEP Coord & Energy Modeling Two Pennsylvania Plaza New York, NY 10121 USA
WHITE
This drawing is not for construction purposes. The information contained herein is intended only to commu the architecture firms and consultants who are responsib construction documents. Pelli Clarke Pelli assumes no respon or construction matters, nor do they assume responsibility for coordination. The ideas, designs and arrangements conta remain the property of Pelli Clarke Pelli, and no part thereof to others or used in connection with any work or project othe for which they have been prepared and developed without Clarke Pelli, Inc. c Copyright 2012 Pelli Clarke Pelli, Inc.
Drawing Title:
VIGNETTES
LOUVER 1.1
5 0.99
92 0.9
0.71 0.36
OPERABLE WINDOW VISION GLASS VISION GLASS WITH SHADOWBOX
Project No:
A1107 Scale:
1: 50
www.tiffafu.com