EIC Monthly News January 2014

Page 7

New EIC Members

New EIC Members New Primary Member

New Global Member

Trinity Point New Road Halesowen West Midlands B63 3HY Tel +44 (0)121 585 5566 Fax +44 (0)121 585 5350 Email cblewer@birwelco.com Web www.unitbirwelco.com

Nobel Way, Birmingham West Midlands B6 7ES Tel +44 (0)121 344 5800 Fax +44 (0)121 344 3056 Email a.floyd@imicomponents.com Web www.imicomponents.com

IMI Components Ltd

Birwelco Limited

The Nominated Representative is Mr Adrian Floyd, Technical Commercial Manager. IMI Components UK has an enviable track record in the nuclear industry for delivering on time and within budget aligned to a unique skill set which allows the company to successfully undertake complex and demanding projects for its customers. IMI Components provides a high quality source for low, medium and high volume component supply as well as the capability to manufacture bespoke assemblies for customers. The company specialises in precision CNC machining, assembly and fabrication. It has the capability to carry out supporting processes such as heat treatments, surface treatments and NDT inspection, minimising the supply chain and reducing risk for its customers. When necessary IMI Components also has the skills and experience to carry out customer site installation work and when required the engineering departments can offer design for manufacture support and development.

The Nominated Representative is Mr Carl Blewer, General Manager. With a history dating back over 100 years Birwelco Ltd is an engineering, construction and thermal equipment manufacturer providing a comprehensive range of services to a variety of business sectors in the UK and around the world. Birwelco delivers leading edge design, engineering, construction and maintenance solutions to customers within the energy, chemical, petrochemical, power, refining and utility industries. Having grown from a specialist engineering base, Birwelco has an innate understanding of complex solutions together with a unique perspective and an acute awareness of the level of detail and precision that are fundamental to all major engineering projects.

New Primary Member

WIKA Instruments Ltd

New Primary Member

Energy Project Solutions Ltd (EPS)

4 Gatton Park Business Centre Wells Place, Merstham Surrey RH1 3LG Tel +44 (0)1737 644 008 Email david.phillips@wika.com Web www.wika.co.uk

Keystone Innovation Centre Croxton Road Thetford Norfolk IP24 1JD Tel +44 (0)1842 768 312 Fax +44 (0)1842 768 319 Email davidmowle@epsltd-uk.com Web www.epsltd-uk.com

The Nominated Representative is Mr David Phillips, Managing Director. WIKA Instruments Limited is the UK subsidiary of the world’s leading manufacturer of pressure, temperature, level, flow and related calibration instruments. The WIKA subsidiary in the UK and Ireland was formed in 1972 and since 2005, the head office has been in Merstham, Redhill, Surrey. The Merstham facility houses an engineering services department with repair, modification, calibration and sophisticated diaphragm seal capability as well as an ATEX approved electrical temperature manufacturing production line and is the only manufacturing location for the ASL range of high precision temperature calibration instruments. There are three other locations: Andover, Hampshire – sales and technical support for all calibration instruments and systems. Calibration systems build; Swanley, Kent – level instrumentation manufacture and development; Irlam, Manchester – industrial deadweight tester manufacture and development. Today WIKA Instruments Limited employs over 115 employees and over 45 employees have over 10 years’ experience with the company.

The Nominated Representative is Mr David Mowle, Managing Director. Energy Project Solutions (EPS) is an engineering and manufacturing consultancy, focused on providing innovative metering solutions to the energy sector. Formed in 2010 its main supply is DP meters. EPS supplies traditional single and dual chamber meters, but its most prestigious product is called meter2di, which is a dual chamber double isolation meter that complies with the requirements of HSG 253 category 2 for proven isolation of plant. EPS is in a strategic supply agreement with ABB, in which ABB will take EPS products to market in many countries around the world.

www.the-eic.com

7

January 2014


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.
EIC Monthly News January 2014 by Energy Industries Council - Issuu