Freelance, experience-based design.
Creator of a broad range of environments and experiences that engage people in the physical realm through art, technology, and architecture. This is the work of Nicholas Ter Meer.
268 Monroe Street // Brooklyn, NY 11216 // 310.463.5216 // andtermeer.co
2
HAND // Projects designed with &™. Made with our hands. &™ is the exploratory design studio and shop lead by Nicholas Ter Meer.
Weave Stool The Weave Stool is a combination of styles and materials. Three of the four legs are pine while one is cedar. The dowel is connected and expressed by Japanese-style wedge dowel joinery. A unique addition is the seat--the stool is a single thread paracord woven in an elongated checker pattern.
Dimensions 18” x 18” x 18” 2016
4
Dove Stool The Dove Stool is a simple and bold stool. One-inch birch board is cut to a 90° dovetail, expressing the layers of board as strength and power of connections.
Dimensions 18” x 18” x 12” 2016
6
Concrete Candle Holder The Concrete Candle Holder is a series of three cylinder-cast concrete with brass hardware.
Dimensions 4.5� x 4.5� 2016
8
01 Coffee Table The 01 Coffee Table gracefully combines the organic lines of the live edge oak top with the structured aesthetic of the cedar and birch dowel base.
Dimensions 65” x 25.5” x 17” 2015
10
01 Shelf The 01 Shelf incorporates minimal aesthetics with traditional dowel joinery. The combination of cedar and birch is expressed by an exposed dowel joint. Upper left dowel, extends through frame to emphasize the joints function and also serve as a hook.
Dimensions 27.5” x 17” x 70” 2015
12
UIC: CasaMare The goal of the UIC was to reveal the myriad of interconnected political, economic, social and physical design issues that affect the use of common spaces and to create a collaborative framework that allows participants in the U.S. and Italy to create an ongoing dialogue. The UIC: CasaMare is planned as a long-term commitment to on-the-ground action with local players. During the Casa Mare action the badanti group told us that one of the most important features of a Casa Mare is a hanging carpet. This carpet is made by weaving communally. We took this idea and found a material in the abandoned Ospedale al Mare that we could weave as a collective act to create a bulletin board for the Casa Mare.
Sponsor: 13th International Architecture Exhibition of the 2012 Venice Biennale Agency: DSGN AGNC Fabrication: DSGN AGNC and partners Urban Tricksters, Teatro Marinoni: Bene Comune Venice, Italy 2012
14
16
MADE // Projects designed with &™. Made by various fabrication shops.
Dove Men+Care A barbershop pop-up shop to showcase all of Dove Men+Care line of hair, body, and face products. The two barber chairs were booked for three days within the first two hours of operation.
Client: Dove Men+Care, Edelman Agency: MKG Fabrication: Pink Sparrow Washington DC, 2016
18
MAKE 1 20"
48"
48"
20"
1 A01.2
ELEVATION
RIGHT SIDE
1/2”=1
1/2”=1
2 A01.2
21'
12"
12"
71-1/4"
12"
accounted for 1" ove all sides for mirror m
A01.3
58"
7
canvas wrapped on site
58"
mirr
9'-0" 8'-0"
6" 89-1/4" 38"
6" 20"
20
satin white MDF
8
satin whi
48"
48"
48" 599 BROADWAY FL 4 NY, NYC 10012 212.620.7770
DOVE MEN+CARE DAD 2.0 SUMMIT
3 A01.2
A01.2
PLAN 1/2”=1
DRAWING BY:
NTM DRAWING DATE:
'-8"
70"
12"
70"
12"
erlap mounting
ror
82"
ite MDF
February 1, 2016
molding to have mitered edge to connecting wall
INSTALL: February17-18 , 2016 DATE OF EVENT: February19-20 , 2016
VENUE:
Mandarin Oriental, DC 1330 Maryland Ave SW, Washington, DC 20024
SCALE:
58"
mirror
88"
satin white MDF
58"
1/4”=1’ All materials, construction and finishes must comply with the most stringent applicable federal and local safety codes. This drawing and all the ideas, arrangements, designs and plans contained herein or represented thereby are owned and remain the property of MKG, and have been created and developed for use on, and in connection with, the project specified. Neither this drawing, nor any of such ideas, arrangements, designs or plans shall be appropriated by or disclosed to any person, firm or corporation for any use whatsoever, except by specific and written permission of MKG. Written dimensions on drawings shall have authority over scaled. Contractors and manufacturers shall verify and be responsible for all dimensions and conditions on the job, and shall inform this office of all variations from drawings prior to performing the work. This office shall first see and approve the contractor’s full-size details before any fabrication is begun. These drawings represent visual concepts and construction suggestions only. The designer and his/her employees and assistants are not qualified to determine the structural appropriateness of these designs, and will not assume responsibility for improper engineering, construction and/ or handling of the scenery/structures represented herein.
MAKE 1
48"
48
20"
3 A01.4
2
LEFT SIDE 1/2”=1’
A01.4
ELEVATION 1/2”=1’
molding to have mitered edge to connecting wall
12"
58"
9'-0" 8'-0"
38"
20"
22
satin white MDF
8"
48"
48"
599 BROADWAY FL 4 NY, NYC 10012 212.620.7770
DOVE MEN+CARE DAD 2.0 SUMMIT
PLAN 1/2”=1’
1
A01.4
A01.4 DRAWING BY:
NTM DRAWING DATE:
16'-0"
February 1, 2016
INSTALL: February17-18 , 2016 DATE OF EVENT: February19-20 , 2016
all shelves will be marked on canvas print
VENUE:
Mandarin Oriental, DC
A01.5
1330 Maryland Ave SW, Washington, DC 20024
SCALE:
1/2” = 1’
canvas wrapped on site
satin white MDF
All materials, construction and finishes must comply with the most stringent applicable federal and local safety codes. This drawing and all the ideas, arrangements, designs and plans contained herein or represented thereby are owned and remain the property of MKG, and have been created and developed for use on, and in connection with, the project specified. Neither this drawing, nor any of such ideas, arrangements, designs or plans shall be appropriated by or disclosed to any person, firm or corporation for any use whatsoever, except by specific and written permission of MKG. Written dimensions on drawings shall have authority over scaled. Contractors and manufacturers shall verify and be responsible for all dimensions and conditions on the job, and shall inform this office of all variations from drawings prior to performing the work. This office shall first see and approve the contractor’s full-size details before any fabrication is begun. These drawings represent visual concepts and construction suggestions only. The designer and his/her employees and assistants are not qualified to determine the structural appropriateness of these designs, and will not assume responsibility for improper engineering, construction and/ or handling of the scenery/structures represented herein.
MAKE 2
PL
LEFT SIDE
1”=1’
2 A01.7
24"
39-1/2"
existing shelving unit
16-1/2"
24
29"
LAN 1”=1’
1 A01.7
24"
18"
gloss white MDF
11" 6"
599 BROADWAY FL 4 NY, NYC 10012 212.620.7770
DOVE MEN+CARE DAD 2.0 SUMMIT
A01.7 DRAWING BY:
18"
NTM DRAWING DATE:
FRONT 1”=1’
3 A01.7
29"
February 1, 2016
INSTALL: February17-18 , 2016 DATE OF EVENT: February19-20 , 2016
1-1/2" VENUE:
Mandarin Oriental, DC 1330 Maryland Ave SW, Washington, DC 20024
SCALE:
1” = 1’
existing shelving unit
15-5/8"
All materials, construction and finishes must comply with the most stringent applicable federal and local safety codes. This drawing and all the ideas, arrangements, designs and plans contained herein or represented thereby are owned and remain the property of MKG, and have been created and developed for use on, and in connection with, the project specified. Neither this drawing, nor any of such ideas, arrangements, designs or plans shall be appropriated by or disclosed to any person, firm or corporation for any use whatsoever, except by specific and written permission of MKG. Written dimensions on drawings shall have authority over scaled. Contractors and manufacturers shall verify and be responsible for all dimensions and conditions on the job, and shall inform this office of all variations from drawings prior to performing the work. This office shall first see and approve the contractor’s full-size details before any fabrication is begun. These drawings represent visual concepts and construction suggestions only. The designer and his/her employees and assistants are not qualified to determine the structural appropriateness of these designs, and will not assume responsibility for improper engineering, construction and/ or handling of the scenery/structures represented herein.
EDELMAN/DOVE MEN+CARE // DAD 2.0 SUMMIT // FEBRUARY 18-20 // MANDARIN ORIENTAL, DC // LEAD DESIGNER: NTM
ENTRY RENDERING
hanging lights from aircraft cable
wall displays
text on wall
entry check-in counter
existing carpet with texture
6
EDELMAN/DOVE MEN+CARE // DAD 2.0 SUMMIT // FEBRUARY 18-20 // MANDARIN ORIENTAL, DC // LEAD DESIGNER: NTM
BARBER SHOP ELEVATION RENDERING
additional product display with description on clipboard
10
26
EDELMAN/DOVE MEN+CARE // DAD 2.0 SUMMIT // FEBRUARY 18-20 // MANDARIN ORIENTAL, DC // LEAD DESIGNER: NTM
GALLERY WALL ELEVATION
14
EDELMAN/DOVE MEN+CARE // DAD 2.0 SUMMIT // FEBRUARY 18-20 // MANDARIN ORIENTAL, DC // LEAD DESIGNER: NTM
WE THE DADS WALL ELEVATION
WE THE DADS, manifesto collaboration with Vayner
14" x 14" x 48" podium, glass case has glass cube 14" T
15
NAIAS As a sponsor of the 2016 North American International Auto Show, Delta Air Lines lounge featured a complete Delta Lounge experience. The lounge included an 80� monitor highlighting the power, performance and precision of the airline. A virtual reality experience took the visitor through a tour of the new features that Delta airplanes offer. The unique interlocking screen was designed to be manipulated through out the week-long auto show, changing the layout of the space.
Client: Delta Air Lines Agency: MKG Fabrication: Scenario Custom Scenery Detroit, Michigan, 2016
28
MAKE 1
3"
2-3/4" 85-1/4"
25"
35-1/8"
25"
11-1/2"
72-1/2"
42-1/2"
84"
all birch rips painted black
96"
jack to be designed by lead carpentern
13mm white coroplast
16"
VERSION 1 HISTORY ITEM
First Issue
30
REV
–
DATE
REF
12/10 A01.1–A01.1
42"
13mm white coroplast
13mm white coroplast
13"
15-3/4" 599 BROADWAY FL 4 NY, NYC 10012 212.620.7770
1 A01.1
DELTA NAIAS 2016
COROPLAST WALL W/ SCREEN
3/4”=1’
85-1/4" 35-1/4"
19-3/4"
19-3/4"
A01.1 DRAWING BY:
NTM
9"
DRAWING DATE: December 12, 2015
73-3/4" INSTALL: January 6, 2016 DATE OF EVENT: January 11, 2016
44-1/4"
VENUE:
COBO CENTER
1 Washington Blvd. Detroit, Michigan 48226
SCALE:
1:16 perspective NTS
10"
39-1/4"
39-1/4"
10"
jack with sandbag for weight
All materials, construction and finishes must comply with the most stringent applicable federal and local safety codes. This drawing and all the ideas, arrangements, designs and plans contained herein or represented thereby are owned and remain the property of MKG, and have been created and developed for use on, and in connection with, the project specified. Neither this drawing, nor any of such ideas, arrangements, designs or plans shall be appropriated by or disclosed to any person, firm or corporation for any use whatsoever, except by specific and written permission of MKG. Written dimensions on drawings shall have authority over scaled. Contractors and manufacturers shall verify and be responsible for all dimensions and conditions on the job, and shall inform this office of all variations from drawings prior to performing the work. This office shall first see and approve the contractor’s full-size details before any fabrication is begun. These drawings represent visual concepts and construction suggestions only. The designer and his/her employees and assistants are not qualified to determine the structural appropriateness of these designs, and will not assume responsibility for improper engineering, construction and/ or handling of the scenery/structures represented herein.
MAKE 1
53-1/2"
48"
16"
17'-3"
frame & jacks painted black
graphic applied on site
96"
typical jack designed by Scenario
13mm white coroplast
55" 2 A01.2
SIDE ELEVATION 1/2”=1’
VERSION 1 HISTORY ITEM
First Issue
32
REV
–
DATE
REF
12/10 A01.2–A01.2
3 A01.2
FRONT ELEVATION 1/2”=1’
13mm white coroplast
48"
599 BROADWAY FL 4 NY, NYC 10012 212.620.7770
48"
DELTA NAIAS 2016
53-1/2" back of frame painted black
A01.2 DRAWING BY:
1 A01.2
NTM DRAWING DATE:
PLAN
1/2”=1’
December 12, 2015
INSTALL: January 6, 2016 DATE OF EVENT: January 11, 2016
VENUE:
COBO CENTER
48" 3D graphics installed on site
13mm white coroplast
1 Washington Blvd. Detroit, Michigan 48226
SCALE:
seamless edge applied with vhb and concealed screws
13mm white coroplast
1/2”=1”; perspective NTS
48" 24"
48"
55" A A01.2
SECTION A 1/2”=1’
All materials, construction and finishes must comply with the most stringent applicable federal and local safety codes. This drawing and all the ideas, arrangements, designs and plans contained herein or represented thereby are owned and remain the property of MKG, and have been created and developed for use on, and in connection with, the project specified. Neither this drawing, nor any of such ideas, arrangements, designs or plans shall be appropriated by or disclosed to any person, firm or corporation for any use whatsoever, except by specific and written permission of MKG. Written dimensions on drawings shall have authority over scaled. Contractors and manufacturers shall verify and be responsible for all dimensions and conditions on the job, and shall inform this office of all variations from drawings prior to performing the work. This office shall first see and approve the contractor’s full-size details before any fabrication is begun. These drawings represent visual concepts and construction suggestions only. The designer and his/her employees and assistants are not qualified to determine the structural appropriateness of these designs, and will not assume responsibility for improper engineering, construction and/ or handling of the scenery/structures represented herein.
REFURBISH 1 48"
7" 45-1/8"
135°
A A01.5
SECTION A 3/4”=1’
5"
connection remains the same; into Delta signage
1"
refurbished connection
2" same finish as exisiting
7"
VERSION 1 HISTORY ITEM
First Issue
34
REV
–
DATE
REF
12/10 A01.5–A01.5
24"
225° 599 BROADWAY FL 4 NY, NYC 10012 212.620.7770
refurbished connection DELTA NAIAS 2016
A01.5
48"
DRAWING BY:
NTM DRAWING DATE:
45-1/8"
December 12, 2015
INSTALL: January 6, 2016
clean, finished edge
DATE OF EVENT: January 11, 2016
VENUE:
2 A01.5
COBO CENTER
REFURBISHED WALL SECTION 1
1 Washington Blvd. Detroit, Michigan 48226
3/4”=1’
SCALE:
1:16 perspective NTS
clean, finished edge
same finish as exisiting
All materials, construction and finishes must comply with the most stringent applicable federal and local safety codes. This drawing and all the ideas, arrangements, designs and plans contained herein or represented thereby are owned and remain the property of MKG, and have been created and developed for use on, and in connection with, the project specified. Neither this drawing, nor any of such ideas, arrangements, designs or plans shall be appropriated by or disclosed to any person, firm or corporation for any use whatsoever, except by specific and written permission of MKG. Written dimensions on drawings shall have authority over scaled. Contractors and manufacturers shall verify and be responsible for all dimensions and conditions on the job, and shall inform this office of all variations from drawings prior to performing the work. This office shall first see and approve the contractor’s full-size details before any fabrication is begun. These drawings represent visual concepts and construction suggestions only. The designer and his/her employees and assistants are not qualified to determine the structural appropriateness of these designs, and will not assume responsibility for improper engineering, construction and/ or handling of the scenery/structures represented herein.
REFURBISH 1 clean, finished edge 7"
45-1/8"
135° 48"
refurbished connection
225° 1 A01.6
SECTIONAL AXON OF WALL 3/4”=1’
5"
same finish as exisiting
1"
clean, finished edge
2"
7"
VERSION 1 HISTORY ITEM
First Issue
36
REV
–
DATE
REF
12/10 A01.6–A01.6
refurbished connection
599 BROADWAY FL 4 NY, NYC 10012 212.620.7770
DELTA NAIAS 2016
45-1/8"
connection remains the same; into existing wall units
A01.6 DRAWING BY:
NTM DRAWING DATE:
48"
December 12, 2015
INSTALL: January 6, 2016 DATE OF EVENT: January 11, 2016
VENUE:
2 A01.6
COBO CENTER
REFURBISHED WALL SECTION 2
1 Washington Blvd. Detroit, Michigan 48226
3/4”=1’
SCALE:
1:16 perspective NTS
connection remains the same; into existing wall units
24"
same finish as exisiting
All materials, construction and finishes must comply with the most stringent applicable federal and local safety codes. This drawing and all the ideas, arrangements, designs and plans contained herein or represented thereby are owned and remain the property of MKG, and have been created and developed for use on, and in connection with, the project specified. Neither this drawing, nor any of such ideas, arrangements, designs or plans shall be appropriated by or disclosed to any person, firm or corporation for any use whatsoever, except by specific and written permission of MKG. Written dimensions on drawings shall have authority over scaled. Contractors and manufacturers shall verify and be responsible for all dimensions and conditions on the job, and shall inform this office of all variations from drawings prior to performing the work. This office shall first see and approve the contractor’s full-size details before any fabrication is begun. These drawings represent visual concepts and construction suggestions only. The designer and his/her employees and assistants are not qualified to determine the structural appropriateness of these designs, and will not assume responsibility for improper engineering, construction and/ or handling of the scenery/structures represented herein.
MAKE 20 CUT 1O SHEETS – 16mm white coroplast CUT 1O SHEETS – 16mm clear coroplast
flute direction
1 A01.7
FLUTE DIRECTION DIAGRAM
NTS
23-3/4" margin around whole sheet
1/2"
23-1/2"
96"
VERSION 1 HISTORY ITEM
First Issue
38
REV
–
DATE
REF
12/17 A01.7–A01.7
599 BROADWAY FL 4 NY, NYC 10012 212.620.7770
DELTA NAIAS 2016
A01.7 DRAWING BY:
NTM DRAWING DATE: December 17, 2015
2 A01.7
INSTALL: January 6, 2016
CNC SHEET
1”=1’
DATE OF EVENT: January 11, 2016
VENUE:
COBO CENTER
1 Washington Blvd. Detroit, Michigan 48226
SCALE:
1”=1’ perspective NTS
48"
All materials, construction and finishes must comply with the most stringent applicable federal and local safety codes. This drawing and all the ideas, arrangements, designs and plans contained herein or represented thereby are owned and remain the property of MKG, and have been created and developed for use on, and in connection with, the project specified. Neither this drawing, nor any of such ideas, arrangements, designs or plans shall be appropriated by or disclosed to any person, firm or corporation for any use whatsoever, except by specific and written permission of MKG. Written dimensions on drawings shall have authority over scaled. Contractors and manufacturers shall verify and be responsible for all dimensions and conditions on the job, and shall inform this office of all variations from drawings prior to performing the work. This office shall first see and approve the contractor’s full-size details before any fabrication is begun. These drawings represent visual concepts and construction suggestions only. The designer and his/her employees and assistants are not qualified to determine the structural appropriateness of these designs, and will not assume responsibility for improper engineering, construction and/ or handling of the scenery/structures represented herein.
OUTER LOUNGE WITH MODIFIED WALL
Delta Takeoff YouTube video playing
Interlocking wall screen installation
NAIAS • JANUARY 11-24, 2016 • COBO CENTER • DETROIT, MI • LEAD DESIGNER: NTM
large widget graphic PRIVACY SCREENS FOR CHARITY PREVIEW
visual connection to bar and coroplast wall
Glossy black wall with 6”-8” grass feature along top face to prevent people from sitting
8
Gradient in opacity to emphasize screen. Possibly lit with up-lights
40
Interlocking wall screen installation
Guests must walk behind screen, creating silhouettes as guests pass
9
to action– Play • DETROIT, MI • LEAD DESIGNER: NTM NAIAS • JANUARY 11-24, 2016 •callCOBO CENTER coat check & Enter To Win
FULL LOUNGE VIEW
10
20
Chase US Open As a main sponsor of the US Open, Chase has two pavilions at the Billie Jean King National Tennis Center located just outside of Arthur Ashe Stadium. In addition to the pavilions on the main grounds, Chase also sponsors the Chase Lounge, a large indoor mezzanine on the grounds. One of the outdoor pavilions served as a registration booth for the Chase Lounge. The other pavilion contains a large LED wall with a cellphone locker and charger located behind each LED unit. Upon entering simple security questions on an iPad in the pavilion, a locker with the corresponding color will illuminate signifying to the user which locker is assigned. Each locker is complete with a fully secure locking mechanism allowing for customers to leave their phones while charging. Upon returning and entering the same security questions, the LED illuminated with the corresponding color to unlock and reset the locker
Client: Chase Agency: MKG Fabrication: Pink Sparrow, Brooklyn Research Flushing, Queens, NY. 2015
42
4 1/2"
145 1/2"
5 3/4"
4 5/8" 8 1/2"
51 1/4"
97 3/8"
18"
97 3/8" 24 1/2" 10"
17"
51 1/4"
48 3/4"
44
48 3/4"
599 BROADWAY FL 4 NY, NYC 10012 212.620.7770
CHASE US OPEN 2015
door opens inward
CHASE LOUNGE LOGO
DRAWING BY: 51 1/4"
NTM
93 1/8"
DRAWING DATE: August 3, 2015
INSTALL: August 17-28rd, 2015 DATE OF EVENT: August 31 - Sept 13
VENUE:
Billie Jean King Flushing Meadows Flushing, NY 11368
painted Chase blue PMS 300
SCALE:
1/2” = 1’
52 1/4"
All materials, construction and finishes must comply with the most stringent applicable federal and local safety codes. This drawing and all the ideas, arrangements, designs and plans contained herein or represented thereby are owned and remain the property of MKG, and have been created and developed for use on, and in connection with, the project specified. Neither this drawing, nor any of such ideas, arrangements, designs or plans shall be appropriated by or disclosed to any person, firm or corporation for any use whatsoever, except by specific and written permission of MKG. Written dimensions on drawings shall have authority over scaled. Contractors and manufacturers shall verify and be responsible for all dimensions and conditions on the job, and shall inform this office of all variations from drawings prior to performing the work. This office shall first see and approve the contractor’s full-size details before any fabrication is begun. These drawings represent visual concepts and construction suggestions only. The designer and his/her employees and assistants are not qualified to determine the structural appropriateness of these designs, and will not assume responsibility for improper engineering, construction and/ or handling of the scenery/structures represented herein.
9"
2x width iPad charger cubbie
97 3/8" 5"
*exception: not slotted
69 1/4"
5"
69 1/4"
*exception: both sides slotted
48 3/4"
46
48 3/4"
599 BROADWAY FL 4 NY, NYC 10012 212.620.7770
CHASE US OPEN 2015
CHASE LOUNGE LOGO
door opens inward
DRAWING BY:
NTM DRAWING DATE:
top piece pg. 4 main cubbie #1 pg. 5
August 3, 2015
slot for emergency phone recovery
back on pg. 7 INSTALL: August 17-28rd, 2015 DATE OF EVENT:
main cubbie inverted
August 31 - Sept 13
VENUE:
Billie Jean King Flushing Meadows Flushing, NY 11368
SCALE:
1/2” = 1’ All materials, construction and finishes must comply with the most stringent applicable federal and local safety codes. This drawing and all the ideas, arrangements, designs and plans contained herein or represented thereby are owned and remain the property of MKG, and have been created and developed for use on, and in connection with, the project specified. Neither this drawing, nor any of such ideas, arrangements, designs or plans shall be appropriated by or disclosed to any person, firm or corporation for any use whatsoever, except by specific and written permission of MKG. Written dimensions on drawings shall have authority over scaled. Contractors and manufacturers shall verify and be responsible for all dimensions and conditions on the job, and shall inform this office of all variations from drawings prior to performing the work. This office shall first see and approve the contractor’s full-size details before any fabrication is begun. These drawings represent visual concepts and construction suggestions only. The designer and his/her employees and assistants are not qualified to determine the structural appropriateness of these designs, and will not assume responsibility for improper engineering, construction and/ or handling of the scenery/structures represented herein.
8 1/2"
8 1/2"
3/4"
10 5/8"
detailed on page 9
5"
TYP
TYP
TYP
TYP
TYP
on bottom only
5
3/4" ~ 0.50" 0.75" ~ 0.12" ~ 0.16"
0.34"
scale: 1:1
48
scale: 1:1
1.10"
599 BROADWAY FL 4 NY, NYC 10012 212.620.7770
CHASE US OPEN 2015
96"
CHASE LOUNGE LOGO
DRAWING BY:
NTM DRAWING DATE: August 3, 2015
INSTALL: 96"
August 17-28rd, 2015 DATE OF EVENT: August 31 - Sept 13
TYP
TYP
TYP
TYP
TYP
TYP
TYP
TYP
VENUE:
TYP
Billie Jean King Flushing Meadows Flushing, NY 11368
SCALE:
1” = 1’ front
5"
front
All materials, construction and finishes must comply with the most stringent applicable federal and local safety codes. This drawing and all the ideas, arrangements, designs and plans contained herein or represented thereby are owned and remain the property of MKG, and have been created and developed for use on, and in connection with, the project specified. Neither this drawing, nor any of such ideas, arrangements, designs or plans shall be appropriated by or disclosed to any person, firm or corporation for any use whatsoever, except by specific and written permission of MKG. Written dimensions on drawings shall have authority over scaled. Contractors and manufacturers shall verify and be responsible for all dimensions and conditions on the job, and shall inform this office of all variations from drawings prior to performing the work. This office shall first see and approve the contractor’s full-size details before any fabrication is begun. These drawings represent visual concepts and construction suggestions only. The designer and his/her employees and assistants are not qualified to determine the structural appropriateness of these designs, and will not assume responsibility for improper engineering, construction and/ or handling of the scenery/structures represented herein.
24"
18"
22"
20 1/2"
1/8" frosted acrylic
50
painted matte bla
145 1/2"
599 BROADWAY FL 4 NY, NYC 10012 212.620.7770
13 1/2" 17"
CHASE US OPEN 2015
hinges on this side
3 1/2"
5"
51 1/4" 97 1/4"
93"
CHASE LOUNGE LOGO
DRAWING BY:
NTM DRAWING DATE: August 3, 2015
INSTALL: August 17-28rd, 2015 DATE OF EVENT:
door for back of house door swings into wall
August 31 - Sept 13
VENUE:
Billie Jean King Flushing Meadows Flushing, NY 11368
SCALE:
1/2” = 1’ 24 1/2" 4 1/2"
4 1/2"
ack
24 1/2"
21"
21"
All materials, construction and finishes must comply with the most stringent applicable federal and local safety codes. This drawing and all the ideas, arrangements, designs and plans contained herein or represented thereby are owned and remain the property of MKG, and have been created and developed for use on, and in connection with, the project specified. Neither this drawing, nor any of such ideas, arrangements, designs or plans shall be appropriated by or disclosed to any person, firm or corporation for any use whatsoever, except by specific and written permission of MKG. Written dimensions on drawings shall have authority over scaled. Contractors and manufacturers shall verify and be responsible for all dimensions and conditions on the job, and shall inform this office of all variations from drawings prior to performing the work. This office shall first see and approve the contractor’s full-size details before any fabrication is begun. These drawings represent visual concepts and construction suggestions only. The designer and his/her employees and assistants are not qualified to determine the structural appropriateness of these designs, and will not assume responsibility for improper engineering, construction and/ or handling of the scenery/structures represented herein.
Wilson US Open Branded tennis balls 385 quantity
mounted tennis ball elevation 1"=1'
dowel detail 3"=1'
Pattern to be released
tennis ball mounted detail 3"=1'
tennis ball 1'=1' // ful
52
l mounted detail ll scale
599 BROADWAY FL 4 NY, NYC 10012 212.620.7770
CHASE US OPEN 2015
TENNIS BALL INSTALLATION
DRAWING BY:
NTM DRAWING DATE: JUNE 23th, 2015
INSTALL: August 17-28rd, 2015 DATE OF EVENT: cut in back for mounting
August 31 - Sept 13
VENUE:
Billie Jean King Flushing Meadows Flushing, NY 11368
SCALE:
NOTED
5/8" x 1-1/2" Alloy Steel Standard Dowel Pin
All materials, construction and finishes must comply with the most stringent applicable federal and local safety codes. This drawing and all the ideas, arrangements, designs and plans contained herein or represented thereby are owned and remain the property of MKG, and have been created and developed for use on, and in connection with, the project specified. Neither this drawing, nor any of such ideas, arrangements, designs or plans shall be appropriated by or disclosed to any person, firm or corporation for any use whatsoever, except by specific and written permission of MKG. Written dimensions on drawings shall have authority over scaled. Contractors and manufacturers shall verify and be responsible for all dimensions and conditions on the job, and shall inform this office of all variations from drawings prior to performing the work. This office shall first see and approve the contractor’s full-size details before any fabrication is begun. These drawings represent visual concepts and construction suggestions only. The designer and his/her employees and assistants are not qualified to determine the structural appropriateness of these designs, and will not assume responsibility for improper engineering, construction and/ or handling of the scenery/structures represented herein.
3/4" Birch Board pg. 2
CNC 3/4" Birch Board pg. 2
3/4" Birch Board pg. 2
3/4" Birch Board pg. 2 kerfcore
54
kerfcore 599 BROADWAY FL 4 NY, NYC 10012 212.620.7770
CHASE US OPEN 2015
EXPLODED AXON
outlet box
DRAWING BY:
CNC 3/4" Birch Board pg. 2
NTM DRAWING DATE: JUNE 16th, 2015
INSTALL: August 17-28rd, 2015 DATE OF EVENT: August 31 - Sept 13
VENUE:
Billie Jean King Flushing Meadows Flushing, NY 11368
CNC 3/4" Birch Board pg. 2
3/4" Birch Board pg. 2 3/4" Birch Board pg. 2
CNC 3/4" Birch Board pg. 2 [4] Non-Marking Rubber Caster 2in. Threaded Stem w/ brake
SCALE:
NTS All materials, construction and finishes must comply with the most stringent applicable federal and local safety codes. This drawing and all the ideas, arrangements, designs and plans contained herein or represented thereby are owned and remain the property of MKG, and have been created and developed for use on, and in connection with, the project specified. Neither this drawing, nor any of such ideas, arrangements, designs or plans shall be appropriated by or disclosed to any person, firm or corporation for any use whatsoever, except by specific and written permission of MKG. Written dimensions on drawings shall have authority over scaled. Contractors and manufacturers shall verify and be responsible for all dimensions and conditions on the job, and shall inform this office of all variations from drawings prior to performing the work. This office shall first see and approve the contractor’s full-size details before any fabrication is begun. These drawings represent visual concepts and construction suggestions only. The designer and his/her employees and assistants are not qualified to determine the structural appropriateness of these designs, and will not assume responsibility for improper engineering, construction and/ or handling of the scenery/structures represented herein.
SHELVES 18-1/2"
12-3/4" 21" 18-1/2"
20"
12-3/4"
13"
13"
20" 10" 2-1/2" 4-1/4" 14-1/2" 5"
40"
96째
23"
2-1/2"
84째
13"
2-1/2"
10-1/12"
[4] N 2in. T
56
DETAIL
1-1/2"
599 BROADWAY FL 4 NY, NYC 10012 212.620.7770
1"
CHASE US OPEN 2015
DRAWINGS
1"
DRAWING BY:
NTM DRAWING DATE: JUNE 16th, 2015
18-1/2" 2-1/2"
INSTALL: August 17-28rd, 2015 DATE OF EVENT: August 31 - Sept 13
VENUE:
18-1/2" 1-1/4" UNDERSIDE PARAPET
Billie Jean King Flushing Meadows Flushing, NY 11368
SCALE:
1”=1’ 18-1/2"
18-1/2" 2-1/2"
14-1/4"
Non-Marking Rubber Caster Threaded Stem w/ brake
2X
All materials, construction and finishes must comply with the most stringent applicable federal and local safety codes. This drawing and all the ideas, arrangements, designs and plans contained herein or represented thereby are owned and remain the property of MKG, and have been created and developed for use on, and in connection with, the project specified. Neither this drawing, nor any of such ideas, arrangements, designs or plans shall be appropriated by or disclosed to any person, firm or corporation for any use whatsoever, except by specific and written permission of MKG. Written dimensions on drawings shall have authority over scaled. Contractors and manufacturers shall verify and be responsible for all dimensions and conditions on the job, and shall inform this office of all variations from drawings prior to performing the work. This office shall first see and approve the contractor’s full-size details before any fabrication is begun. These drawings represent visual concepts and construction suggestions only. The designer and his/her employees and assistants are not qualified to determine the structural appropriateness of these designs, and will not assume responsibility for improper engineering, construction and/ or handling of the scenery/structures represented herein.
CHASE // US OPEN // AUG 25—SEPT 8, 2014 // BJK NAT'L TENNIS CENTER // QUEENS, NY
CHASE LOUNGE WELCOME BOOTH AERIAL
existing monitor bracket with new HD monitor
food village
tennis ball installation // resembling the Chase Lounge
"Chase Lounge Information" signage
Atlas charging station
main entrance for queue
corner signage standing height desk with three [3] computers for BA check in
24
CHASE // US OPEN // AUG 25—SEPT 8, 2014 // BJK NAT'L TENNIS CENTER // QUEENS, NY
WELCOME BOOTH ELEVATION
25
58
CHASE // US OPEN // AUG 25—SEPT 8, 2014 // BJK NAT'L TENNIS CENTER // QUEENS, NY
WELCOME BOOTH PERSPECTIVE
26
CHASE // US OPEN // AUG 25—SEPT 8, 2014 // BJK NAT'L TENNIS CENTER // QUEENS, NY
WELCOME BOOTH PERSPECTIVE
27
CHASE // US OPEN // AUG 25—SEPT 8, 2014 // BJK NAT'L TENNIS CENTER // QUEENS, NY
CHASE LOUNGE CHARGING BOOTH AERIAL
existing wall finishes and alcove lighting to be covered tech BOH
food village
"Power Up" messenging
"Power Up" messenging
check out check in
LED Charging Wall
two [2] stationary iPads for registration,
BOH access door
29
CHASE // US OPEN // AUG 25—SEPT 8, 2014 // BJK NAT'L TENNIS CENTER // QUEENS, NY
CHARGING BOOTH ELEVATION
instructional and waiver text
velcro signage – can be swapped durning rushes
31
60
CHASE // US OPEN // AUG 25—SEPT 8, 2014 // BJK NAT'L TENNIS CENTER // QUEENS, NY
CHARGING BOOTH PERSPECTIVE
32
CHASE // US OPEN // AUG 25—SEPT 8, 2014 // BJK NAT'L TENNIS CENTER // QUEENS, NY
CHARGING BOOTH PERSPECTIVE
33
Mobile Locker Room The Chase Locker Room invited guests to win prizes and VIP experiences in two locations within a mobile truck unit positioned outside of MetLife Stadium and at a second footprint located in the center of the Chase Club inside the stadium. At both locations, Jets & Giants fans had the opportunity to open locker doors, which acted as a delivery mechanism to inform guests which prizes they won. To utilize the mobile locker room for both team activations, alternate team branding was designed to be interchangeable using channels to slide into position. In 2015, the Chase Locker Room was executed at a total of 16 games and reached nearly 20,000 fans in attendance to New York Jets and New York Giants games in East Rutherford, New Jersey.
Client: Chase Agency: MKG Fabrication: Pink Sparrow New Jersey, 2015
62
team branded carpet
wo
Team colored chalkboard prize list
Chase branded Podium
19'-0" 3'-7"
93-3/4"
8'-1 1/2"
5'-9"
12"
3'-7"
64
ood bench
wood bench
599 BROADWAY FL 4 NY, NYC 10012 212.620.7770
CHASE JETS GIANTS TRUCK
INTERIOR PLAN
DRAWING BY: ADA lockers
NTM DRAWING DATE: August 19, 2015
INSTALL:
natural maple vinyl flooring
DATE OF EVENT: SEPT 2015 JAN 2016
VENUE:
MetLife Stadium
One MetLife Stadium Drive East Rutherford, NJ 07073
SCALE:
1/2” = 1’
5'-7"
centered in truck 4'-2"
All materials, construction and finishes must comply with the most stringent applicable federal and local safety codes. This drawing and all the ideas, arrangements, designs and plans contained herein or represented thereby are owned and remain the property of MKG, and have been created and developed for use on, and in connection with, the project specified. Neither this drawing, nor any of such ideas, arrangements, designs or plans shall be appropriated by or disclosed to any person, firm or corporation for any use whatsoever, except by specific and written permission of MKG. Written dimensions on drawings shall have authority over scaled. Contractors and manufacturers shall verify and be responsible for all dimensions and conditions on the job, and shall inform this office of all variations from drawings prior to performing the work. This office shall first see and approve the contractor’s full-size details before any fabrication is begun. These drawings represent visual concepts and construction suggestions only. The designer and his/her employees and assistants are not qualified to determine the structural appropriateness of these designs, and will not assume responsibility for improper engineering, construction and/ or handling of the scenery/structures represented herein.
backs of l removed for gi appl
steel lockers set back from wooden build 25"
14-3/4"
11-1/2"
12"
9-1/2"
le overlap for tent to adjoin to steel lockers
one [1] row will be cov wood disp
1/2" frame on surface
detailed on next page
25"
7-3/4"
2-3/8" on center
5-1/8" 2-1/4" 7"
6"
19-1/4"
on center
backs of lockers removed for gi application
20-1/4" on center 12-1/2"
2"
78"
78"
on center
12"
11" 19-1/4"
9-1/2" 12-3/4"
20-1/4" 2-1/4"
25"
2-1/4"
opening for helmet and merchandise
66
lockers lication
25"
9-1/2"
599 BROADWAY FL 4 NY, NYC 10012 212.620.7770
JETS/GIANTS CHASE CLUB
72" 121-3/4"
LOCKER WALL
w of lockers vered up by play
*ALL MAPLE FINISHED WOOD TO MATCH FLOORING CHOSEN BY PS.
same as locker mock up on opposite side DRAWING BY:
122" 20-1/4"
72" 15-3/4"
20-1/4"
25"
7-3/4"
NTM DRAWING DATE: August 19, 2015
12"
INSTALL: DATE OF EVENT: SEPT 2015 JAN 2016 detailed on next page VENUE:
MetLife Stadium
One MetLife Stadium Drive East Rutherford, NJ 07073
SCALE:
1” = 1’
36"
36"
[2] Paramount Locker // 6-tier 12x18x12 door assembled // gray item #: WB269693GY // globalindustries.com
All materials, construction and finishes must comply with the most stringent applicable federal and local safety codes. This drawing and all the ideas, arrangements, designs and plans contained herein or represented thereby are owned and remain the property of MKG, and have been created and developed for use on, and in connection with, the project specified. Neither this drawing, nor any of such ideas, arrangements, designs or plans shall be appropriated by or disclosed to any person, firm or corporation for any use whatsoever, except by specific and written permission of MKG. Written dimensions on drawings shall have authority over scaled. Contractors and manufacturers shall verify and be responsible for all dimensions and conditions on the job, and shall inform this office of all variations from drawings prior to performing the work. This office shall first see and approve the contractor’s full-size details before any fabrication is begun. These drawings represent visual concepts and construction suggestions only. The designer and his/her employees and assistants are not qualified to determine the structural appropriateness of these designs, and will not assume responsibility for improper engineering, construction and/ or handling of the scenery/structures represented herein.
31-1/4"
12"
29-1/4"
10"
8
12"
3"
detail on next page
29-1/4" 78" 37-7/8"
14-1/4"
15-1/4"
1-1/2"
68
fastened to truck *must be concealed
14-1/4"
cut hole for bose mini soundstick * middle only
599 BROADWAY FL 4 NY, NYC 10012 212.620.7770
93-3/4" 31-1/4"
31-1/4"
CHASE JETS GIANTS TRUCK
LOCKERS
8-1/8" DRAWING BY:
NTM DRAWING DATE: August 19, 2015
INSTALL: DATE OF EVENT: SEPT 2015 JAN 2016
VENUE:
MetLife Stadium
One MetLife Stadium Drive East Rutherford, NJ 07073
SCALE:
1” = 1’ All materials, construction and finishes must comply with the most stringent applicable federal and local safety codes. This drawing and all the ideas, arrangements, designs and plans contained herein or represented thereby are owned and remain the property of MKG, and have been created and developed for use on, and in connection with, the project specified. Neither this drawing, nor any of such ideas, arrangements, designs or plans shall be appropriated by or disclosed to any person, firm or corporation for any use whatsoever, except by specific and written permission of MKG. Written dimensions on drawings shall have authority over scaled. Contractors and manufacturers shall verify and be responsible for all dimensions and conditions on the job, and shall inform this office of all variations from drawings prior to performing the work. This office shall first see and approve the contractor’s full-size details before any fabrication is begun. These drawings represent visual concepts and construction suggestions only. The designer and his/her employees and assistants are not qualified to determine the structural appropriateness of these designs, and will not assume responsibility for improper engineering, construction and/ or handling of the scenery/structures represented herein.
1/2"
12" 10-1/2"
8-1/8" 7-1/2"
1" dowel or the like
11-1/8" 1"
kerf for hanger placement 1-1/2" 2" 1"
11-1/8"
70
middle unit will have hole for bose mini soundstick
599 BROADWAY FL 4 NY, NYC 10012 212.620.7770
CHASE JETS GIANTS TRUCK 10"
10"
8-1/8"
LOCKER DETAILS
DRAWING BY:
NTM DRAWING DATE:
1"
August 19, 2015
INSTALL: DATE OF EVENT: SEPT 2015 JAN 2016
VENUE:
MetLife Stadium
One MetLife Stadium Drive East Rutherford, NJ 07073
SCALE:
3” = 1’
2" 1"
1"
All materials, construction and finishes must comply with the most stringent applicable federal and local safety codes. This drawing and all the ideas, arrangements, designs and plans contained herein or represented thereby are owned and remain the property of MKG, and have been created and developed for use on, and in connection with, the project specified. Neither this drawing, nor any of such ideas, arrangements, designs or plans shall be appropriated by or disclosed to any person, firm or corporation for any use whatsoever, except by specific and written permission of MKG. Written dimensions on drawings shall have authority over scaled. Contractors and manufacturers shall verify and be responsible for all dimensions and conditions on the job, and shall inform this office of all variations from drawings prior to performing the work. This office shall first see and approve the contractor’s full-size details before any fabrication is begun. These drawings represent visual concepts and construction suggestions only. The designer and his/her employees and assistants are not qualified to determine the structural appropriateness of these designs, and will not assume responsibility for improper engineering, construction and/ or handling of the scenery/structures represented herein.
36"
outside dimension 3/4"
31"
31"
8-5/8" 12"
78-1/8"
72
4-1/2"
78-1/8"
78"
72"
599 BROADWAY FL 4 NY, NYC 10012 212.620.7770
CHASE JETS GIANTS TRUCK 97-1/4" ADA LOCKERS
DRAWING BY:
NTM DRAWING DATE:
72"
August 19, 2015
INSTALL: DATE OF EVENT: SEPT 2015 JAN 2016 wood in front of lockers lockers recessed 3/4"
VENUE:
MetLife Stadium
One MetLife Stadium Drive East Rutherford, NJ 07073
109-1/8"
72"
SCALE:
1” = 1’ All materials, construction and finishes must comply with the most stringent applicable federal and local safety codes. This drawing and all the ideas, arrangements, designs and plans contained herein or represented thereby are owned and remain the property of MKG, and have been created and developed for use on, and in connection with, the project specified. Neither this drawing, nor any of such ideas, arrangements, designs or plans shall be appropriated by or disclosed to any person, firm or corporation for any use whatsoever, except by specific and written permission of MKG. Written dimensions on drawings shall have authority over scaled. Contractors and manufacturers shall verify and be responsible for all dimensions and conditions on the job, and shall inform this office of all variations from drawings prior to performing the work. This office shall first see and approve the contractor’s full-size details before any fabrication is begun. These drawings represent visual concepts and construction suggestions only. The designer and his/her employees and assistants are not qualified to determine the structural appropriateness of these designs, and will not assume responsibility for improper engineering, construction and/ or handling of the scenery/structures represented herein.
CHASE // JETS/GIANTS TRUCK // SEPT 2015 JAN 2016 // METLIFE STADIUM // LEAD DESIGNER: NICHOLAS TER MEER
locker build to interchangable RENDERING: MOBILE LOCKER ROOM GIANTS ACTIVATION resemble locker signage to resemble from truck activation
Giants jerseys in preapproved numbers.
74
truck activation
Removable fabric skirt for concealing merchandise under truck
#CHASELOCKERROOM signage
Field markings graphic [not shown in rendering]
Welcome and call-to-action sign
CHASE // JETS/GIANTS TRUCK“ Lockers // SEPT 2015 JAN 2016 // METLIFE STADIUM // LEAD DESIGNER: NICHOLAS TER MEER Blue “Chase Preferred Giants jerseys
in preapproved INTERIOR SIGNAGE DETAIL: GIANTS ACTIVATION numbers.
Sliding “scoreboard” style signage allows team logos and numbers to be changed quickly.
Chase Sound Check Chase Sound Check is an outreach for Chase at the Forum in Los Angeles, California. The activation allowed users to approach the van, play music which was amplified through speakers mounted on the van, with a coinsiding lightshow of LED backlit custom mounted drums. Few of the drums were lockers where customers would retrieve a prize.
Client: Chase Agency: MKG with Steve Caruso Fabrication: Pink Sparrow Los Angeles, California, 2015
76
8” (7)
14” (2)
2
20” (3)
18” (2)
10” (5) 16” (3) 12” (7)
masking panel with CNC cut drum holes 1/4” black acrylic
8
8 16
20
12
10
10
8
12
10
1
ITEM
First Issue Second Issue Third Issue
78
REV
– 1 2
DATE
REF
10/2 10/10 10/11
Z01 Z01 Z01
8
20
16
Z01.1
14
1
24
VERSION 1 HISTORY
12
18
8 12
10
16
18
12
VAN PASSENGER SIDE KEY 1:25 scale
input panel w/ [2] 1/4” audio jacks
24” (1)
(10) PRIZE DRUMS WITH HINGE
599 BROADWAY FL 4 NY, NYC 10012 212.620.7770
cut from top of existing indented shape in van exterior sheet metal
CHASE SOUND CHECK VAN
weld sliding door shut and fill door handle
Z01.1 DRAWING BY:
NTM DRAWING DATE: October 10, 2015
8
14 INSTALL: October 5, 2015
12
DATE OF EVENT: December 4, 2015
8
10
12
VENUE:
20
THE FORUM
3900 W Manchester Blvd Inglewood, CA 90305
SCALE:
1:25
1” chrome trim around cut (5) 3.5” outdoor in-wall speakers spec by technical contractor
All materials, construction and finishes must comply with the most stringent applicable federal and local safety codes. This drawing and all the ideas, arrangements, designs and plans contained herein or represented thereby are owned and remain the property of MKG, and have been created and developed for use on, and in connection with, the project specified. Neither this drawing, nor any of such ideas, arrangements, designs or plans shall be appropriated by or disclosed to any person, firm or corporation for any use whatsoever, except by specific and written permission of MKG. Written dimensions on drawings shall have authority over scaled. Contractors and manufacturers shall verify and be responsible for all dimensions and conditions on the job, and shall inform this office of all variations from drawings prior to performing the work. This office shall first see and approve the contractor’s full-size details before any fabrication is begun. These drawings represent visual concepts and construction suggestions only. The designer and his/her employees and assistants are not qualified to determine the structural appropriateness of these designs, and will not assume responsibility for improper engineering, construction and/ or handling of the scenery/structures represented herein.
INTERNAL ASSEMBLY isometric 1/2”= 1’2
Z01.3-2 BILL OF MATERIALS ITEM
80
QTY
REF
chrome trim
1
Z01.3
backing panel
1
Z01.4
drums
30
Z01.1
grid and shelves
1
Z01.5
1 Z01.2
1” wide chrome trim around cut
599 BROADWAY FL 4 NY, NYC 10012 212.620.7770
CHASE SOUND CHECK VAN
Z01.2 DRAWING BY:
NTM DRAWING DATE: October 10, 2015
INSTALL: October 5, 2015 DATE OF EVENT: December 4, 2015
VENUE:
THE FORUM
drum shells, various size 6” depth, mfg. by other
3900 W Manchester Blvd Inglewood, CA 90305
SCALE:
1/2” = 1’
backing panel 1/4” plexiglas 2” overlap with weather seal
1” steel or aluminum grid structure van side wall reinforcement
All materials, construction and finishes must comply with the most stringent applicable federal and local safety codes. This drawing and all the ideas, arrangements, designs and plans contained herein or represented thereby are owned and remain the property of MKG, and have been created and developed for use on, and in connection with, the project specified. Neither this drawing, nor any of such ideas, arrangements, designs or plans shall be appropriated by or disclosed to any person, firm or corporation for any use whatsoever, except by specific and written permission of MKG. Written dimensions on drawings shall have authority over scaled. Contractors and manufacturers shall verify and be responsible for all dimensions and conditions on the job, and shall inform this office of all variations from drawings prior to performing the work. This office shall first see and approve the contractor’s full-size details before any fabrication is begun. These drawings represent visual concepts and construction suggestions only. The designer and his/her employees and assistants are not qualified to determine the structural appropriateness of these designs, and will not assume responsibility for improper engineering, construction and/ or handling of the scenery/structures represented herein.
1/2” curtain rod with black drape
1 Z01.3
INTERIOR PERSPECTIVE
8"
rear doors
1/2” birch plywood or MD painted black
NTS
6'-0"
van floor
to cab
relative pitch approximated
bolt backing panel to framing & weld to inner grid
8"
6"
42"
6'-2"
7°
16-1/4"
82
6-1/2"
15-1/2"
drums with doors and backing
37-1/4"
35-3/4"
DF shelving
gap between shelf and drums for wiring 599 BROADWAY FL 4 NY, NYC 10012 212.620.7770
12'-0"
CHASE SOUND CHECK VAN
Z01.3 DRAWING BY:
NTM
2 Z01.3
DRAWING DATE:
DRUM WALL INTERNAL ASSEMBLY
October 10, 2015
1/2” = 1”
bolt or weld to ceiling & floor
9"
INSTALL: October 5, 2015
2-1/4"
DATE OF EVENT: December 4, 2015
VENUE:
THE FORUM
3900 W Manchester Blvd Inglewood, CA 90305
SCALE:
1/2” = 1’
rear of van
27" (5) outdoor speakers, spec by tech contractor shown at ideal spacing locate between existing wall framing
All materials, construction and finishes must comply with the most stringent applicable federal and local safety codes. This drawing and all the ideas, arrangements, designs and plans contained herein or represented thereby are owned and remain the property of MKG, and have been created and developed for use on, and in connection with, the project specified. Neither this drawing, nor any of such ideas, arrangements, designs or plans shall be appropriated by or disclosed to any person, firm or corporation for any use whatsoever, except by specific and written permission of MKG. Written dimensions on drawings shall have authority over scaled. Contractors and manufacturers shall verify and be responsible for all dimensions and conditions on the job, and shall inform this office of all variations from drawings prior to performing the work. This office shall first see and approve the contractor’s full-size details before any fabrication is begun. These drawings represent visual concepts and construction suggestions only. The designer and his/her employees and assistants are not qualified to determine the structural appropriateness of these designs, and will not assume responsibility for improper engineering, construction and/ or handling of the scenery/structures represented herein.
1� square
STRUCTURAL GRID NTS
1 Z01.5
L-bracket secured to ceiling and floor
12-5/8"
cross beams screwed to backing panel
17-1/4"
84
74"
43"
cross beams screwed to backing panel, top will be angled
tube, welded at joints 599 BROADWAY FL 4 NY, NYC 10012 212.620.7770
shelf made from MDF or plywood painted black
CHASE SOUND CHECK VAN
Z01.5 DRAWING BY:
NTM
12'-0"
DRAWING DATE: October 10, 2015
2 Z01.5
STRUCTURAL GRID 1/2” = 1’
2'-11 3/4"
INSTALL: October 5, 2015 DATE OF EVENT: December 4, 2015
VENUE:
THE FORUM
3900 W Manchester Blvd Inglewood, CA 90305
SCALE:
1/2” = 1’ All materials, construction and finishes must comply with the most stringent applicable federal and local safety codes. This drawing and all the ideas, arrangements, designs and plans contained herein or represented thereby are owned and remain the property of MKG, and have been created and developed for use on, and in connection with, the project specified. Neither this drawing, nor any of such ideas, arrangements, designs or plans shall be appropriated by or disclosed to any person, firm or corporation for any use whatsoever, except by specific and written permission of MKG. Written dimensions on drawings shall have authority over scaled. Contractors and manufacturers shall verify and be responsible for all dimensions and conditions on the job, and shall inform this office of all variations from drawings prior to performing the work. This office shall first see and approve the contractor’s full-size details before any fabrication is begun. These drawings represent visual concepts and construction suggestions only. The designer and his/her employees and assistants are not qualified to determine the structural appropriateness of these designs, and will not assume responsibility for improper engineering, construction and/ or handling of the scenery/structures represented herein.
86
by Steve Caruso
For references, please contact hi@andtermeer.co
268 Monroe Street // Brooklyn, NY 11216 // 310.463.5216 // andtermeer.co
© 2016