TÂNIA POSADA ELYSEU WORK SAMPLES
C A R G O C O L L E C T I V E . C O M / T E L Y S E U | T A N I A . EL Y S E U @ M E . C O M | 7 1 8 2 0 0 6 8 2 2
#interior space planning #graphics/ drawing production #project management
Project overview Level 2 8' - 0"
Level 1 0' - 0"
longitudinal section 1 A102
Bath 104 14
Kitchen
Bedroom
3
105
3
101
2
18
17
Living 24
102
2
Dinning
23
103
1
1 A103
1
FLOOR PLAN + FURNITURE LAYOUT
2 A102
1
#interior space planning #graphics/ drawing production #project management
SELECTED SECTIONS Level 2 8' - 0"
BEDROOM SECTION
Level 1 0' - 0"
Level 2 8' - 0"
Level 1 0' - 0"
TRANSVERSE SECTION
2
#interior space planning #graphics/ drawing production #project management
PersPective Views
View from living area
3d view of kitchen
View from Dinning area
3
#interior space planning #graphics/ drawing production #project management
Finished Rendering
4
#exhibition space planning #graphics/artwork production #project management
Conceptual Renderings
2 1”MDF build-out To be painted Black #2132-10
16”
overhead Light (To be Spec’d) 6 display towers (To be placed as shown in El. 2) Entrance area with Logo 3 Large display Cases (To be placed as shown in El. 4) 1”MDF Panel with cut-out for tv custom shelf for Tv/equip. (To be spec’d.) Area restricted from exhibit
3
5”
8” 25-1/2”
10-1/2”
32”
62-1/4” 81-1/2” 23’-6”
1 8-1/2”
12’
23-3/4” 84-1/2” 17’-3”
17-1/2” 8-1/2”
48-1/2” 14” 16”
FLOOR PLAN
79”
7”
4
5
#exhibition space planning #graphics/artwork production #project management
elevationS Plane change 10’
79”
4-1/2” 12” 2.” 4”
4” 2”
17’-9”
4-1/2” 4-3/4”
26”
20”
48”
9”
B.O. Ceiling 8’-6”
15” 12”
12”
20”
12”
20”
12”
12”
12”
20”
5” 24”
12”
8.50
24-1/2”
27”
24-1/2”
23”
43-1/4”
7’
48”
77” 40” 10” 9-1/4”
48-3/4”
2”
35”
30”
20” 20”
4-3/4”
1
20”
t.o. floor 0’-0”
2
Plane change
Plane change
84”
62”
10’
39”
31”
32”
28”
28”
10’
B.O. Ceiling 8’-6”
15”
20”
Plane change
26”
14”
14”
21-1/2”
32-1/2”
44-
22”
1/2
”
12”
1-1/2”
14”
14”
26”
Officine Panerai’s watches are a natural blend of italian design, swiss technology and passion for the sea.
7”
22”
28”
28”
14”
14”
31”
2”
5” Panerai was born in 1860 in Florence, cradle of the Renaissance, the art and the science which have made Italy famous throughout the world for its creativity and genius. Values that Officine Panerai expresses through its watches, which it reinterprets over time with passion, technical excellence and exclusive design.
7”
34”
P. 9 0 0 0
P. 9 9 9
P. 9 0 0 1
14-3/4”
A watch-making laboratory, highly specialized since the nineteenth century, supplier of measurement and precision instruments to the Italian Navy in the nineteen hundreds, fine watchmaker and international brand in the twenty-first century. The deep-rooted links with the world of the sea, the true heritage of the Brand, bestow on each watch a sporting character that is unique and authentic, like the history of Panerai.
P. 2 0 0 3
P. 2 0 0 4
P. 2 0 0 5
8o”
43-1/2” 8”
3
30-1/4”
42”
40” 42”
10”
29-3/4”
4
40”
33” 25-1/2”
25-1/2”
12-3/4”
12-3/4”
25-1/2”
25-1/2”
29-3/4”
t.o. floor 0’-0”
6
#concept design #drawing production
POWER CORD METAL CANOPY
25.5” SUPPORT CABLE
(5X) BULB LAMPS BX55
LAMP FIXTURE HOUSING ON SUPPORT RING
METAL SUSPENSION RING METAL FIN SUPPORT
9”
35” 35”
1/16" TRANSLUCENT WHITE PLEXI-GLASS FINS (72X)
7
#drawing set production #conceptual renderings #project management
8
I
Retail 3
Aluminum transition
Existing Buildout
STORAGE 114 18’-4”
H
Retail 2
5 A402
office 113 10’-0”
8 A402
Hall 1 102 8’-0”
g
Fitting hc 112 10’-0”
retail 2 103 18’-4”
f
6 A402
hall 3 111 10’-0”
7 A402
5 A402
retail 1 101 18’-4”
e 6 A402
fitting rm 110 10’-0”
d Cosmetics 104 10’-0”
backroom
wc 2 109 10’-0”
6 A402
c retail 3 105 18’-4”
Retail 1
hall 2 106 10’-0”
5 A402
b wc 1 107 10’-0”
utility 108 10’-0”
a
Custom Cashier
finish floor symbol list
1
1
floor finish Plan -1st floor NOT TO SCALE
wood flooring
carpet
tile
existing concrete slab
2
#drawing set production #conceptual renderings #project management
oblique
oblique
oblique
oblique
oblique
oblique
oblique
oblique
b.0. finish ceiling 18’-4”
P1
P1
P1
P1
P1
P1 t.0. sheet rock 12’-0”
P1
P1
P1
P1
P1
P1
P1
P1
P1
P1
P1
b.o. dropped ceiling 10’-0”
P1
b.o. soffit 8’-0” open to hall 2
open to retail 1
w1
b1
b1
open to cosmetics
b1
w1
b1 t.0. finish floor 0’-0”
12 Retail 3 [ 105 ]: west oblique
11 Retail 3 [ 105 ]: south
10 Retail 3 [ 105 ]: east
oblique
oblique
9
Retail 3 [ 105 ]: north
oblique
b.0. finish ceiling 18’-4”
P1
P1
P1 t.0. sheet rock 12’-0”
P1
P1
b.o. dropped ceiling 10’-0” b.o. soffit 8’-0”
P1
P1
P1
MI
open to retail 2
P1
mi
P1
open to retail 2
P1
3 A503
b1 t.0. finish floor 0’-0”
8 cosmetics [ 104 ]: west
7 cosmetics [ 104 ]: south
oblique
oblique
6 cosmetics [ 104 ]: east
oblique
oblique
oblique
5 cosmetics [ 104 ]: north oblique
oblique
oblique
b.0. finish ceiling 18’-4”
P1
P1
P1
plane change
P1
t.0. sheet rock 12’-0”
P1
P1
P1
P1
P1
P1
P1
P1
P1
b.o. dropped ceiling 10’-0”
P1
b.o. soffit 8’-0” open to hall 3
w1
b1
open to hall 1
open to retail 1
open to cosmetics
b1
b1
w1
b1 t.0. finish floor 0’-0”
4 Retail 2 [ 103 ]: west
3 Retail 2 [ 103 ]: south
2 Retail 2 [ 103 ]: east
1 Retail 2 [ 103 ]: north
9
THANK YOU C A R G O C O L L E C T I V E . C O M / T E L Y S E U | T A N I A . EL Y S E U @ M E . C O M | 7 1 8 2 0 0 6 8 2 2