Doing Business in Sri Lanka 2014

Page 32

Doing Business 2014 No.

32

Sri Lanka

Procedure

Time to complete

Cost to complete

Apply for water connection 12

1 day

no charge

1 day

no charge

Receive on-site inspection by inspector from National Water Supply and Drainage Board 13

* Obtain water connection

14

To obtain the water connection, BuildCo must submit an application to the National Water Supply and Drainage Board, Assessment Notice, title deed and ownership certificate. After that, receive an on-site inspection, pay water installation costs, and sign an agreement with the 32 days board. The company must also obtain a road permit if there is damage to the road in installing the water connection. This permit is issued by the Municipal Council of Colombo. It takes 7 days to obtain, and the costs depend on the damage to the road.

LKR 31,000

Apply for phone connection

15

Documents to be presented: • Company certificate of incorporation • Billing proof at current location

1 day

no charge

1 day

no charge

Receive on-site inspection for telephone connection 16

Obtain phone connection

17

To obtain telephone connection, the company must submit an application to Sri Lanka Telecom along with water/sewage billing proof, 7 days receive an on-site inspection, and pay telephone installation costs.

* Takes place simultaneously with another procedure. Note: Online procedures account for 0.5 days in the total time calculation. Source: Doing Business database.

LKR 13,773


Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.