REVISION & DATE

COLUMN FOOTING SCHEDULE 7

1

2

A-1

---

3' - 6"

B 2' - 0"

22' - 0"

28' - 6"

1' - 4" B

25' - 0"

B 1' - 4"

8"x 1' - 4" FTG. EL. 96'-6"

25' - 0"

8"x 1' - 4" FTG. EL. 96'-6"

SEE DOCK DETAIL 33' - 10"

B

26' - 0"

DRIP EDGE

-

1' - 4"

18' - 0"

1' - 4"

38' - 6"

3' - 4"

55' - 0"

10' - 10"

73' - 4"

FOUNDATION PLAN 1/8" = 1'-0"

6 A-1

4' - 0"

2"

3/4" D x 8" L ANCHOR BOLT w/ WASHERS

DOCK STAIR DETAIL 1/4" = 1'-0"

11' - 0"

99'-11" 99'-2"

97'-0"

5 A-1

96'-0"

3' - 6"

95'-0" 94'-0"

BUMPER DETAIL 1 1/2" = 1'-0"

1' - 10"

TYPE T RUBBER DOCK BUMPER

8 A-1

96'-0"

93'-0" 92'-6"

1/4" = 1'-0"

3"

10' - 0"

99'-11"

ENLARGED DOCK PLAN

3" x 3"x1/4" STEEL ANGLE w/ WELDED 1/4"x1"x8"

4" SLEEVE/ 3" FROM EDGE

3"

A-1

3 A-1

27' - 0"

3' - 0"

8' - 0"

2

-

3' - 6"

5"

3' - 0"

5' - 6"

5' - 6"

3'-0"x3"x1/4" NOSE GUARD w/ 1/4"x2" ANCHORS

20' - 0"

21' - 6"

2" STEEL GUARD RAIL

WIRE MESH

1' - 1"

3' - 6"

99'-11"

6T@ 11"

7' - 0"

13' - 11"

29' - 4"

3' - 6"

1 A-1

3' - 4"

1' - 2"

THICKENED SLAB DETAILS 3/4" = 1'-0"

---

---

--16' - 0"

119

21' - 5" -

-

1/2" ISO. JOINT

3- #4 REBAR CONT.

6' - 0"

B

2' - 0"

D #4 REBAR @24"OC #4 REBAR @24"OC

16' - 0"

B B

2- #4 REBAR CONT.

5' - 8"

1' - 4" 6' - 4"

11' - 2"

1' - 4"

3' - 6"

8"

B

C

7R@ 6 7/8"

1' - 4"

1' - 0"

5"

4"

EL. 96'-6"

120

A

8"

EL. 95'-6"

1' - 4"

---

1' - 4"

RETAINING WALL SECTION 1/2" = 1'-0"

27' - 6"

14' - 4"

8"

8"

-

A

6' - 8"

1' - 0"

5' - 10" 1' - 4" 4' - 8" 1' - 4"

4"

17' - 10"

EL. 99'-10"

4' - 6"

2 A-1

4 A-1

6' - 2" 2' - 8"

1' - 8" 5' - 11" 1' - 4"

25' - 0"

EL. 95'-6"

25' - 0"

8"

6"

EL. 96'-6" 1' - 4"

#3 REBAR @12"OC #4 REBAR @25"OC #6 REBAR @24"OC

C

C

1' - 0"

4"

#4 REBAR @24"OC

1' - 4" 5" CONC. SLAB

2' - 8"

2- #4 REBAR CONT.

4"

2' - 0"

25' - 0"

4" DRAIN TILE

6" 1/2" ISO. JOINT

78' - 4"

8" 8"

8"

24' - 10"

---

4"

8"

1' - 4"

6' - 4"

15' - 4"

3' - 9"

1' - 4"

C

4"

27' - 6"

1' - 4"

TRENCH DRAIN DETAIL 1 1/2" = 1'-0"

A

---

8' - 7"

2' - 0"

8' - 0"

5 A-1

A

15' - 0"

C

BRICK DESIGNS 653 JONESVILLE RD. COLUMBUS, INDIANA 47201 NORMAN LACH

1' - 0"

1'-0"x 2' - 0" FTG. EL. 96'-6"

---

NL

18' - 0"

TJS

2' - 0"

8"

21' - 6"

JOB NO.

D

1' - 0" 94'-10"

3' - 6"

SCHOOL OF ARCHITECTURE SOUTHERN ILLINOIS UNIVERSITY BUILDING TECHNOLOGY II ARC 341 SECTION 001

8"

3' - 6"

2" GUARD RAIL w/ 4" SPACING

1' - 4" 5' - 10"

A

#4 REBAR CONT.

28' - 1"

SET NO.

40' - 3"

CHECKED BY:

1' - 3" 3' - 4"

DRAWN BY:

3" 3' - 4"

27' - 0"

7/12/2011

10' - 9"

29' - 4"

2' - 0"

8' - 4"

44' - 4"

FIRST FLOOR PLAN - DOOR AND ROOM FINISH SCHEDULES - DOOR DETAILS

26' - 10"

25' - 0"

TYLER SCHEPERS MR. NORM LACH

8"

32' - 0"

IN.

70' - 0"

1/2"x2" STEEL "L" BRACE 95'-6"

4

128' - 2"

4' - 0" 2' - 10"

1' - 1"

3

DATE

GENERAL NOTES: 1. TOP OF CONC. FOUNDATION WALL SHOWN AT 100'-0". 2. DOOR POCKET ELEVATION AT 99'-4". 3. GRADE ELEVATION AT 99'-6". 4. FIRST FLOOR SLAB ELEVATION AT 100'-0", EXCEPT WHERE NOTED. 5. ALL EXTERIOR FOUNDATION WALLS HAVE 2" RIGID INSULATION. 6. 6mm VAPOR BARRIER UNDER CONC. FLOOR SLABS.

SHEET TITLE

REINFORCEMENT 5- #4 REBAR BOTH WAYS 4- #4 REBAR BOTH WAYS 4- #4 REBAR BOTH WAYS 4- #4 REBAR BOTH WAYS

3' - 6"

ELEVATION 96'-6" 96'-6" 96'-6" 92'-6"

21' - 5"

DEPTH 3'-0" 2'-6" 2'-9" 2'-6"

3' - 9"

LENGTH 4'-0"x4'-0" 3'-6x3'-6" 3'-9"x3'-9" 3'-6x3'-6"

10"x 1' - 8" FTG. EL. 96'-6"

TYPE A B C D

118

7 A-1

TRUCK RAMP SECTION 1/4" = 1'-0"

SHEET NO.

A-1 OF 6 SHEET


LOBBY

111

107

---

107

4' - 8"

108

14' - 8"

18' - 4"

3' - 4" 2' - 8"

OFFICE

4' - 4"

UP 21R

OFFICE

CAR.

--

WD

P

GYP

P

CONC

P

10'-0"

104

OFFICE

CAR.

--

WD

P

GYP

P

CONC

P

10'-0"

105

CONFERENCE RM

CAR.

--

WD

P

GYP

P

CONC

P

10'-0"

106

STORAGE RM

CAR.

--

WD

P

GYP

P

CONC

P

10'-0"

107

LOUNGE

WD

S&V

WD

P

BR

--

AC T

--

9'-0"

108

JANITOR'S CLOSET

CONC.

--

V

--

BR

--

CONC

--

10'-0"

109

MEN'S TOILET

CER T

W

--

--

GIWT

--

AC T

--

9'-0"

110

WOMEN'S TOILET

CER T

W

--

--

GIWT

--

AC T

--

9'-0"

111

SHOP AREA

CONC

--

V

--

CONC

P

CONC

--

10'-0"

112

OFFICE

CAR

--

WD

P

CONC

P

CONC

--

10'-0"

113

MECH. RM

CONC

--

V

--

CONC

--

CONC

--

10'-0"

115

TOOL RM

CONC

--

V

--

CONC

P

CONC

--

10'-0"

116

MACH. RM

CONC

--

V

--

CONC

--

CONC

--

10'-0"

201

DEMONSTRATION RM

CAR

--

WD

P

GYP

P

AC T

--

103

OFFICE 11' - 1 3/4"

103

11' - 1 3/4"

14' - 1 3/4"

---

3' - 4"

7' - 8"

11' - 4"

3' - 0"

2' - 4"

3' - 4"

2' - 0"

3' - 4"

4' - 0"

4' - 8"

3' - 4"

5' - 0"

3' - 4"

5' - 4"

DOOR

DOOR FRAME

GENERAL NOTES: 1. 4" CONC. ON GRADE EXCEPT WHERE NOTED. 2. ALL OPENINGS ARE M.O. 3. FINISHED GRADE SLOPES AWAY AT 1/4" PER 1'-0". 4. ALL DOORS ARE HMF EXCEPT STOREFRONT.

7 1_" 8

W

HT.

T

CON.

MATL

FIN.

MATL

FIN.

DET NO.

101

A

2 3'-0"

7'-2"

0'-1 3/4"

HM

GL

--

AL

--

A-4

--

--

102

A

2 3'-0"

7'-2"

0'-1 3/4"

HM

GL

--

ST

P

2/ A-2 J3

L2

--

103

B

3'-0"

7'-2"

0'-1 3/4"

SC

WD

S&V

ST

P

2/ A-2 J3

L1

3/ A-2 T1

104

B

3'-0"

7'-2"

0'-1 3/4"

SC

WD

S&V

ST

P

2/ A-2 J3

L1

3/ A-2 T1

105

B

3'-0"

7'-2"

0'-1 3/4"

SC

WD

S&V

ST

P

2/ A-2 J3

L1

3/ A-2 T1

106

B

3'-0"

7'-2"

0'-1 3/4"

SC

WD

S&V

ST

P

2/ A-2 J3

L1

3/ A-2 T1

107

C

2 3'-0"

7'-2"

0'-1 3/4"

MC

WD

S&V

ST

P

2/ A-2 J4

L3

--

108

D

3'-0"

7'-2"

0'-1 3/4"

SC

WD

S&V

ST

P

2/ A-2 J7

L3

3/ A-2 T2

109

D

3'-0"

7'-2"

0'-1 3/4"

SC

WD

S&V

ST

P

2/ A-2 J

L3

3/ A-2 T3

110

D

3'-0"

7'-2"

0'-1 3/4"

SC

WD

S&V

ST

P

2/ A-2 J

L3

3/ A-2 T3

111

C

2 3'-0"

7'-2"

0'-1 3/4"

HM

MET

P

ST

P

2/ A-2 J6

L4

3/ A-2 T2

112

B

3'-0"

7'-2"

0'-1 3/4"

SC

GL

P

ST

P

2/ A-2 J5

L5

3/ A-2 T4

113

C

2 3'-0"

7'-2"

0'-1 3/4"

HM

MET

P

ST

P

2/ A-2 J5

L5

--

114

C

2 3'-0"

7'-2"

0'-1 3/4"

HM

MET

P

ST

P

2/ A-2 J5

L5

--

115

D

3'-0"

7'-2"

0'-1 3/4"

SC

WD

S&V

ST

P

2/ A-2 J5

L5

--

116

A

3'-0"

7'-2"

0'-1 3/4"

HM

MET

P

ST

P

2/ A-2 J2

L6

--

117

C

3'-0"

7'-2"

0'-1 3/4"

HM

MET

P

ST

P

2/ A-2 J1

--

--

118

C

3'-0"

7'-2"

0'-1 3/4"

HM

MET

P

ST

P

2/ A-2 J1

--

--

119

C

3'-0"

7'-2"

0'-1 3/4"

HM

MET

P

ST

P

2/ A-2 J1

--

--

120

E

8'-0"

9'-4"

0'-1"

HM

MET

--

ST

P

A-4

--

--

3' - 4" 2' - 0"

5 8 _" 8

WD

CAR

1 1 _" 2

3"

5 3_" 8

L5

CMU

L6

BR

SCALE: 1 1/2" = 1'-0"

6'-0" / 3'-4"

0'-8"

2- #3 REBAR IN CMU 1 L 2 1_4 x 3 x 1/8

6'-0"

0'-8"

FILL LINTELS w/ CONC

2- #3 REBAR IN N CC MU

3'-4"

0'-8"

FILL LINTELS w/ CO

3'-4"

0'-8"

1L

1 _ 4

2

J6

T2 WD

2L 2

1" 7 _ 1 " 8

3 4 _" 4

1 _ 4

x 3 x 1/8

CER T

T3 5 3_ " 8

x 3 x 1/8

REMARKS

CONC

J7 2' - 6" 0' - 3"

CAR

T4

3 6_" 4

3 A-2

2' - 2" 0' - 4"

CONC

A

DOOR JAMB DETAILS

0'-1 1/2"

THRESHOLD DETAILS SCALE: 3" = 1'-0"

4 A-2

B

C

DOOR ELEVATIONS SCALE: 1/4" = 1'-0"

0' - 4"

0' - 4"

3 5 _" 4

STEEL "T" ANCHOR 7 1_ " 8

CMU / ST

6'-0"

4' - 9 1/4"

7 1_ " 8

1 _" 2

WD 5 8 _" 8

STEEL "T" ANCHOR

7 1_ " 8

L4

2- 2x6 w/ 1_2" PLYWD SPACER

5 3_ " 8

WOOD STUD ANCHOR

1 3_" 2

ST

0'-1 1/2"

0' - 8"

5 3_" 8

1 11 _ " 4

L3

3'-4"

0' - 8"

2"

3 5 _" 4

7 4 _" 8

WD

2- 2x4 w/ 1_2" PLYWD SPACER

3' - 0"

5 3_" 8

7 1_" 8 5 7_ " 8

L2

BEARING AT EACH END

T1

STEEL WIRE ANCHOR

7 1_ " 8 2" 7 _ 1 " 8

WD

J5

8"

STEEL WIRE ANCHOR

L1

ROUGH OPENING

SECTION

0' - 6"

3 7_ " 4

7 4 _" 8

MATL

3' - 6"

1'

5 7_ " 8

MARK

3' - 7"

7 1_ " 8 4"

LINTEL THRESH. REMARKS

TYPE

NO.

LOOSE LINTEL SCHEDULE

SCALE: 1/8" = 1'-0"

2"

9'-0"

SET NO.

103

6/28/2011

10'-0"

FIRST FLOOR PLAN

2"

2 A-2

P

104

17' - 1 3/4"

3' - 4" 3' - 4"

112

7' - 4"

14' - 8"

OFFICE

BOLT ANCHOR

5 5 _" 8

CONC

104

STEEL WIRE ANCHOR

J4

P

2" GAP FOR RIGID INSUL

SCHOOL OF ARCHITECTURE SOUTHERN ILLINOIS UNIVERSITY BUILDING TECHNOLOGY II ARC 341 SECTION 001

4' - 8" 6' - 8"

14' - 1"

12' - 0"

3' - 0"

25' - 0"

D

11' - 7"

2

J3

101

2x4 STUD @16 OC w/ 1/2" GYP

A-2

1 4 _" 2

GYP

---

---

117

J2

P

-

-

112

1 9_" 4

WD

22' - 0"

8' - 8"

J1

S&V

102

116

1 A-2

WD

REF.

JANITOR CLOSET

C

102

-

17' - 8"

108

46' - 4"

LOBBY

DOOR SCHEDULE

101

109

LOUNGE

3' - 0"

102

77' - 0"

6' - 0"

111

13' - 0"

10'-0"

VESTIBULE 14' - 9 3/4"

11' - 4"

9' - 0" 110

SHOP AREA

115

P

19' - 0"

14' - 8"

25' - 0"

78' - 0"

113

-

115

CONC

NL

B

7' - 4"

---

MACH. RM

P

TJS

109

-

5" CONC SLAB ON GRADE

GYP

4' - 0" 3' - 4"

110

---

105

---

P

5' - 4"

14' - 1 3/4"

26' - 11 3/4"

26' - 8"

25' - 0"

34' - 8"

MEN'S TOILET

25' - 8"

2' - 8"

WD

JOB NO.

105

WOMEN'S TOILET

---

8' - 10"

S&V

CHECKED BY:

106

106

-

1' - 10" 6' - 0"

WD

101

DRAWN BY:

CONFERENCE RM

-

114

VESTIBULE

3' - 4" 3' - 4" 3' - 4" 3' - 4"

11' - 1 3/4"

TOOL RM

16' - 0"

FIN.

NAME

FIRST FLOOR PLAN - DOOR AND ROOM FINISH SCHEDULES - DOOR DETAILS

4' - 8"

113

28' - 4"

MATL

NO.

REMARKS

TYLER SCHEPERS MR. NORM LACH

3' - 4"

STORAGE RM

MECH. RM

119

FIN.

3' - 4" 3' - 4"

A

UP 21R

120

MATL

3' - 4"

5' - 8"

118

114

FIN.

27' - 0"

39' - 11"

CLG DET HT SHT

5' - 4"

11' - 3"

CEILING

MATL

14' - 10"

8' - 0"

1' - 5" 3' - 0" 3' - 0"

29' - 4"

WALLS

FIN.

23' - 4"

5' - 6"

44' - 4"

BASES

MATL

3' - 4"

28' - 0"

FLOOR

25' - 0"

7' - 6"

1' - 0"

32' - 0"

BRICK DESIGNS - SCHEPERS 653 JONESVILLE RD. COLUMBUS, INDIANA 47201 OWNER

ROOM

70' - 0"

IN.

129' - 8"

REVISION & DATE

ROOM FINISH SCHEDULE

4

DATE

3

SHEET TITLE

2

1

SHEET NO. D

E

A-2 OF ___ SHEET


REVISION & DATE

B

#4 REBAR

1" METAL HANGER WIRE

1/2" BEARING PAD

1/2" BEARING PAD 1" RUNNER CHANNEL 7/8" FURRING STRIP @16"OC 5/8" GYP BOARD 1/2" EDGE TRIM

SHEET TITLE

12' - 3"

12' - 0" 4' - 0"

10' - 0"

12' - 0"

12' - 3"

5"

10"

96'-6"

5"

1' - 8"

1' - 8"

OFFICE WALL SECTION 3/4" = 1'-0"

5 A-4

TOILET WALL SECTION 3/4" = 1'-0"

LOUNGE WALL SECTION 3/4" = 1'-0" 4' - 0"

1 A-4

3" - 3 1/2" U.D.

1/4" STEEL PLATE 2- #4 REBAR @1 1/2"OC/ WELDED TO PLATE

JAMB

2" RIGID INSUL.

1" DBL GLAZED GLASS 2" SCREW 1/4" SHIM CAULK 1/2" GYP BOARD BATT. INSUL. 2" RIGID INSUL.

3' - 4"

#6 REBAR - WELDED SPLICE SLEEVE 1/2" BEARING PAD 1/2" ISO. JOINT

7 A-3 SPLICE SLEEVE 1/2" ISO. JOINT

100'-0"

3' - 6"

1/2" BEARING PAD

SILL 1" DBL GLAZED GLASS CAULK 2" SCREW 1x2 3/4" GYP BOARD GUARD 1/4" SHIM 1/2" GYP BOARD 2"x7" TAPERED CONC. BATT. INSUL. 2" RIGID INSUL.

3 A-4

OFFICE WINDOW DETAIL 3" = 1'-0"

2" RIGID INSUL.

TOP OF FOUND. WALL

SPLICE SLEEVE DETAIL 1 1/2" = 1'-0"

6"

7 A-4

SCHOOL OF ARCHITECTURE SOUTHERN ILLINOIS UNIVERSITY BUILDING TECHNOLOGY II ARC 341 SECTION 001

1/2" BEARING PAD

SHEET NO. TOP OF FOOTING 96'-6"

8 A-4

DOUBLE TEE DETAIL 1 1/2" = 1'-0"

6 A-4

1' - 0"

3' - 4" M.O.

3" - 11 1/2" U.D

2" SELF-LEVEL CONC.

4' - 0" M.O.

NL

1/2" BEARING PAD

10"

10"

10"

8 A-3

TOP OF FOOTING

96'-6"

2 A-4

112'-2"

4' - 4"

3' - 6"

2" RIGID INSUL.

TOP OF FOOTING

96'-6"

SECOND FLOOR SLAB 24' - 9"

6"

4"

100'-0"

6mm VAPOR BARRIER 1/2" ISO. JOINT

3' - 6"

3' - 6"

2" RIGID INSUL.

HEADTOP OF FOOTING

4"

6mm VAPOR BARRIER 1/2" ISO. JOINT 2" RIGID INSUL.

6mm VAPOR BARRIER 1/2" ISO. JOINT

4' - 4"

2" RIGID INSUL. BATT. INSUL. 3"x3" STEEL LINTEL 2- 2x4 w/ 1/2" SPACER 1/2" GYP BOARD CAULK 1/4" SHIM 3/4" GYP BOARD GUARD 1x2 2" SCREW

4"

4"

6"

TOP OF FOUND. WALL

4"

100'-0"

6"

TOP OF FOUND. WALL

100'-0"

4"

FIRST FLOOR SLAB

TJS

WEEP HOLES @24"OC FLASHING

#4 REBAR 1/4" STEEL PLATE 2- #4 REBAR @3"OC 2" CONC. SLAB

BRICK DESIGNS - SCHEPERS 653 JONESVILLE RD. COLUMBUS, INDIANA 47201 OWNER

1/2" GYP BOARD 2" RIGID INSUL. FLASHING WEEP HOLES @24"OC

CHECKED BY:

2" RIGID INSUL. 1/2" SHEATHING FLASHING WEEP HOLES @24"OC

4" GLAZED CMU

DRAWN BY:

LADDER COLLAR JOINT @16"OC 2" RIGID INSUL.

TYLER SCHEPERS MR. NORM LACH

3' - 4"

3' - 4"

JOB NO.

17' - 5"

10' - 0"

STAIRWAY AND STOREFRONT DETAILS BUILDING ELEVATION AND SECTION

4' - 8"

8"

1/4" STEEL PLATE

1/2"x10" ANCHOR BOLT

3 A-3

4' - 0"

GRAVEL STOP DETAIL 3" = 1'-0"

1/2" BEARING PAD 1" RUNNER CHANNEL 7/8" FURRING STRIP @16"OC 5/8" GYP BOARD 1/2" EDGE TRIM

2- #4 REBAR @3"OC

10' - 0"

4' - 10" 11' - 10"

12' - 3"

CONT. REGLET FLASHING WEDGE INSERT BOX SHIM RELIEVING ANGLE WEEL HOLES @24" OC SEALANT/ BACKUP ROD LIP BRICK 2" RIGID INSUL. INSUL. 1/2" GYP BOARD FLASHING WEEP HOLES @24"OC

8"

1' - 10"

1" METAL HANGER WIRE

124'-2"

SET NO.

TOP OF HC SLAB 111'-8"

DATE

4"

TOP OF SECOND DBL TEE

111'-8"

FLASHING GRAVEL STOP 1/2"x10" ANCHOR BOLT FELT SCREW @24"OC 3" CONC. w/ 1/4" PER 1' SLOPE PEA GRAVEL FELT

4 A-4

1' - 0"

111'-10"

4"

TOP OF HC SLAB

1' - 0"

3"

4"

TOP OF WFL SLAB

3"

4 A-3

8/5/2011

A

IN.

B

SHOP WALL SECTION 3/4" = 1'-0"

6"

1' - 0"

6"

A-3 OF 6 SHEETS


REVISION & DATE

C

B 14

A-4

A-4

10

13

A-4

A-4

16

17

18

A-4

A-4

A-4

A-4

12

9

A-4 13' - 10"

A-4

6"

DETAIL 5 3" = 1'-0"

13 A-4

DETAIL 2 3" = 1'-0"

3 A-4

STOREFRONT ELEVATION 1/4" = 1'-0"

SHEET TITLE

7"x1/4" THRESHOLD 2"SCREW 3"x1/8" SCREW 1/2" ISO JOINT

FELT PEA-SIZED GRAVEL 9"x1/2" ANCHOR BOLT FLASHING

4"

3"x1/2" BOLT 1/2" BEARING PAD

9 A-4

DETAIL 4 3" = 1'-0"

12 A-4

DETAIL 1 3" = 1'-0"

3/4" CORNER GUARD 10" WIRE ANCHOR

8-5 A-4

FIRST FLOOR SLAB 100'-0"

9T @ 11"= 8' - 3"

7 A-4

10T @ 11"= 9' - 2" 14'-7 1/2" U.D.

OFFICE TO LOUNGE ROOF DETAIL 1 1/2" = 1'-0"

14'-8" M.O. 92'-6"

15 A-4

DETAIL 7 3" = 1'-0"

16 A-4

DETAIL 8 3" = 1'-0"

17 A-4

DETAIL 9 3" = 1'-0"

18 A-4

DETAIL 10 3" = 1'-0"

6 A-4

LOUNGE TO SHOP ROOF DETAIL 1 1/2" = 1'-0"

1

4 A-4

2

3

4

STAIR SECTION 1/4" = 1'-0"

6 A-4

3" PIPE RAIL 1/2" ARM 2 1/4"x1/8" TOGGLE BOLT

4" SLEEVE

7 A-4 SECOND FLOOR SLAB 112'-2"

19 A-4

RAILING DETAIL 1" = 1'-0"

1/2" BEARING PAD 3"x2'-6" NOSING w/ 2" ANCHOR

FIRST FLOOR SLAB 100'-0"

2 A-4

4" SLEEVE

TOP OF FOOTING 96'-6"

BUILDING SECTION 1/8" = 1'-0"

1

2

3

4

6 A-3

1/2" BEARING PAD 12" BOND BEAM 10" BOND BEAM

24' - 2"

8' - 4"

5

1

A-3

A-3

2 A-3 SECOND FLOOR SLAB 112'-2"

10" 3' - 0"

6"

6" 1' - 0" 3' - 0"

STAIR DETAILS 1" = 1'-0"

12' - 6"

PRECAST CONCRETE PANELS

12' - 0"

24' - 8"

13' - 0"

8 A-4

TJS

TYLER SCHEPERS MR. NORM LACH

8-4 A-4

WEDGE INSERT BOX

BRICK DESIGNS - SCHEPERS 653 JONESVILLE RD. COLUMBUS, INDIANA 47201 OWNER

10"

NL

6"x6"x1/2" ST ANGLE 1/2" ISO JOINT 1/4" BEARING PAD

1 A-4

SOUTH ELEVATION 1/8" = 1'-0"

FIRST FLOOR SLAB 100'-0" TOP OF FOOTING 96'-6"

SCHOOL OF ARCHITECTURE SOUTHERN ILLINOIS UNIVERSITY BUILDING TECHNOLOGY II ARC 341 SECTION 001

8-3 A-4

10R @ 6 7/8"= 5' - 10"

12' - 2"

8-2 A-4

11R @ 6 7/8"= 6' - 4"

SECOND FLOOR SLAB 112'-2" 5"

SET NO. JOB NO.

REGLET CANT STOP FLASHING

CHECKED BY:

8-1 A-4

1/2" ISO. JOINT #4 REBAR

DRAWN BY:

10 A-4

8/5/2011

DATE

10"

6"

STAIRWAY AND STOREFRONT DETAILS BUILDING ELEVATION AND SECTION

15

6"

STAIRWAY PLAN 1/4" = 1'-0"

DETAIL 3 3" = 1'-0"

10' - 0"

14 A-4

3' - 0"

A-4

DETAIL 6 3" = 1'-0"

4"

5 A-4

11 A-4

10'-0" M.O.

20' - 8"

4

4' - 3"

3' - 2"

9' - 2"

3' - 4"

9'-11 1/2" U.D.

7' - 3"

3' - 2"

4"

IN.

11

SHEET NO.

A-4 OF 6 SHEETS


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.