MCT
Landing Points • Sihanoukville (Cambodia) • Cherating (Malaysia)
MALAYSIA-CAMBODIA-THAILAND • Rayoung (Thailand)
RFS Year EOS Year System Cost (USD) Length (km) Initial Capacity (Tbps) Design Capacity (Tbps) Fiber Pairs Wavelengths per Fiber Pair Capacity per Wavelength (Gbps) Owners
System Supplier System Installer Region
2017 2041 $60,000,000 1,425 1.5 30 6 50 100 Symphony Communication Public Company Limited, Telcotech Limited, Telekom Malaysia Berhad Huawei Marine Global Marine Systems Limited AustralAsia
Page 195 of 297 pages