pantheon// 2008 - deluxe

Page 35

Arjan Geelhoed Symbioses General info: Graduation date: 2/07/2008 Tutors: Heike Lohmann, Maarten Meijs & Anne Holtrop Specialization: Architecture - Interiors, Buildings & Cities Project related info: Task/ Program: Dance Theatre Location: Amsterdam North Storeys and purpose: 9 storeys Ground Floor: 3 Stores, Bar/Disco, Storage and Main Entrance. First Floor: Outdoor Performance Space. Second Floor: Dance Theatre & Foyer. Third Floor: Offices. Fourth Floor: 3 Dance Studios. Sixth Floor: Restaurant/Canteen & Terrace. Seventh Floor: 6 Dance Studios. Eighth Floor: 5 Apartments, Dressing Rooms, Dance Studios & Installations. Ninth Floor: Fitness Centre, Indoor Swimming Pool. Tenth Floor: Outdoor Swimming Pool Faรงade material: U-Profiled Glass Short description: The program of the building can be divided in 2 groups, one for the general public [restaurant, swimming pool] and one for a very small and specific public [modern/contemporary dance]. The public of modern/contemporary dance does not live in or nearby the location of the building. To prevent the building of becoming an island in its own neighborhood the program is placed in an order that optimizes the contact/ interaction between the different users. This order will create new possibilities for inspiration, creativity and integration arises in- and outside the building. By achieving this, the building will become finally part of the social en cultural networks in the neighborhood. Maquette: Materials: MDF, Vivak and a lot of paint and glue Scale and size: 1:20, 1:100 & 1:500 Estimated Time spent: 40 hours, more than 500 hours and 160 hours. //

stylos // deluxe

33


Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.