Soft Strip Out & General Demolition

Page 1

Things to Comprehend about Interior Strip Out There are several methods that are involved during the demolition of a structure or building. One such phase is the interior strip out process, which is essential to ensure that the building is prepared for the ultimate demolition method. However, this cannot be done by self and one must rent the best interior strip out companies in London or in any place where a building wants redesigning or renovation.

What is the interior strip out? Interior strip out companies deals with the removal of walls, ceilings, floor coverings, and temporary floors, non-load bearing partitions, mechanical and electrical structures that includes cables, lighting, cable trays, heating, ventilation, and air conditioning systems, and the elimination of utilities such as gas, electricity, water and telecommunications. Usually, such a dismantling occurs in a building which is already operating or continues to operate. In such a case, the best interior strip out companies London work closely with their UK clients to ensure maximum safety to the already existing structure in operation and to make sure that the entire demolition process will run smoothly from the beginning up to the end. How is interior strip out done? The first step while going for an interior strip out company is to have a plan so that the required result is accomplished. Once, the strategy is discussed and agreed, the strip out company will provide an estimated time for the work.


Firstly, all the required items are removed and stored in a safe place. If something is left, it's taken care by the employed interior strip out company. Once, all the movable things are removed, stripping of the internal structure begins. It starts by eliminating all non-supporting arrangements inside the structure. This means complete removal of walls, ceiling, and flooring, leaving only the supporting constructions behind, which are generally pillars that hold the building strong and in one place. On completion of work all debris are placed into dumpsters. They are then removed from the premises. Once the interior strip out process is complete, the area is cleaned and prepared for the new wall, ceiling, and flooring to be put into place. Why select interior strip out companies? 1. Knowledgeable & Budget-Friendly: Interior strip out companies London can offer a cost-effective, efficient and safe way for carrying out internal strip out work of the structure. They can help you get your job done in a budget. 2. Provide Clearance Services: Strip out process also includes site clearance services. Once the work is completed, waste is removed and the site is cleaned before the premise is handed over to you. 3. Removal of Asbestos: Exposure to contaminants and other site problems are their primary concern. To ensure that projects are completed on time and with safety, these companies take care of removing of asbestos. 4. Risk Assessment: The best interior strip out companies are not just confined to the dismantlement method. They additionally provide risk management services. 5. Removal of Hazardous Material: Law states that it is illegal to dispose of hazardous materials like general waste. It is necessary to remove hazardous materials in the right manner as they are harmful for the environment as well as for the human health. Hiring a strip out contractor does that work for you.


6. Safety & Incident-Free: Even before the strip out method, main utilities that include electricity, gas, water and mechanical services such as HVAC systems within the demolition areas are isolated to ensure safety of all concerned. To run your interior strip out project in a safer and faster way, get in touch with some of the best interior strip out companies in London.


Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.