APPENDIX B: BIKEWAY PROJECT DESCRIPTIONS
Project 22: Bradburn Boulevard Segment: Between 72nd Avenue and 80th Avenue Class/Type: Class III – Signed Bike Route with Sharrows Countermeasure(s): Peg-a-tracking may be considered through each intersection. Notes: Already known as a good north-south cycling route, this planned connection will more formally provide a north-south connection between the Little Dry Creek Trail and existing sidepath along Turnpike Drive. It will also connect to two planned bikeways along 72nd Avenue (Project 3), 76th Avenue (Project 23), as well as England Park and Firemen’s Park. Project 23: 76th Avenue Segment: Between Federal Boulevard and Ingalls Street Class/Type: Class III – Signed Bike Route with Sharrows Countermeasure(s): Peg-a-tracking may be considered through each intersection. Notes: This segment provides an excellent, more calm east-west connection through south Westminster. It also connects the Municipal Court and the Swim and Fitness Center on the east end with Torrii Square Park, Wolff Run Park, Little Dry Creek Trail, and an existing bicycle lane in Arvada on the west end. Project 24: Stuart Street/Stuart Place/Tennyson Street/Turnpike Drive Segment: Between 76th Avenue and Turnpike Drive Class/Type: Class III – Signed Bike Route Countermeasure(s): n/a Notes: Provides a north-south connection through multiple neighborhoods. It passes by Sunset Park and connects to proposed bikeways along 76th Avenue (Project 23) and 80th Avenue (Project 8). Project 25: Turnpike Drive Segment: Between Tennyson Street and Sheridan Boulevard. Class/Type: Class II – Curbside Bicycle Lane Countermeasure(s): Peg-a-tracking may be considered through each intersection. Notes: This segment continues the trajectory of project 24. An existing connection between the two cul-de-sacs of Turnpike Drive, just west of Tennyson Street, should be improved so the connection between the proposed bicycle lanes and signed bike route is clear. Project 26: Oakwood Drive Segment: Between 80th Avenue and Wagner Drive Class/Type: Class III – Signed Bike Route with Sharrows Countermeasure(s): Peg-a-tracking may be considered through each intersection. Notes: This segment connects planned bikeways along 80th Avenue (Project 8) and 84th Avenue/ Wagner Drive (Project 27) with Oakwood Park. Project 27: Wagner Drive Segment: Between 84th Avenue and 88th Avenue Class/Type: Class III – Signed Bike Route with Sharrows Countermeasure(s): Peg-a-tracking may be considered through each intersection. Notes: This segment extends the continuity of project 26 and project 28, clearly extending a northsouth connection on the eastern side of the Highway 36 corridor. Project 28: 84th Avenue Segment: Between Zuni Street and Wagner Drive at Oakwood Drive Class/Type: Class III – Signed Bike Route, Class II – Curbside Bicycle Lanes Countermeasure(s): Peg-a-tracking may be considered through each intersection. Notes: At the eastern limit of this project, at Zuni Street, this project connects with a proposed bikeway. Between Zuni Street and Federal Boulevard, the reducing the travel lanes and turn 108