1 minute read

PHYSICAL MODEL

Process diagramms of Rammed earth

To make the rammed earth, First mould of correct measurements was made.

Advertisement

Mixture of different colors of sand grout and white cement was rammed properly with dripping of water enough to make it stable.

As for the finishing part the mould is carefully torn out from the rammed earth which was kept for 5 to 7 hours.It takes the Rammed earth mostly 5 to 7 hours to dry.

The type of roof is folded roof, which is arranged by alternative direction.Its an inclined roof.

The one side of wall is constructed with curtain wall system, in an angular direction.

Rammed earth

This article is from: