
1 minute read
Design Development
The first visual depicts how the site is currently used. It contains a modest study room with seats and tables.
The second image is showing the view that people would see when the first enter the space from the TB building.
Advertisement


At the opposite end of the location, it shows how long the corridor is and what the view looks like while looking down into the TB Building.


This is showing how the above floor is slightly disconnected from the south part of the tunnel. This allows more light to enter within the bottom floor.
During the site inspection, an attempt was made to determine the length of the corridor. This would show the size of the installation and how far it may spread across the site.
The width was measured to show how large the installation may be. This would also help in modelling and understanding the final design’s evolution.
