July / August 2021 Volume 255 | No 4 www.electricalreview.co.uk
Informing the electrical industry for 140 years
Energy Efficiency Time for IoT?
16
27
Talking Point
Final Say
Where there is nuclear power, there is nuclear waste. So, what are we doing with ours?
The post Covid conundrum (with a side of Brexit.)
34