EAST CAMPUS Figure 170. East Campus Existing Aerial, 2016
East Campus Key Map
10-YEAR CONCEPTUAL PLAN VISION East Campus currently accommodates athletics and recreational activities with parking to support sporting events and campus commuters, along with the Union Bay Natural Area. Much of East Campus is built on a methane-producing landfill and seismic liquefaction zone, making building construction more expensive. The 10-year conceptual plan for East Campus is designed to: ••
Focus potential new development in the south portion of East Campus.
••
Preserve and expand intramural and intercollegiate athletic uses in East Campus.
••
Balance public realm and open space along the waterfront with dense development maximizing productive land use.
••
Improve connections to Central Campus.
••
Transform a former brownfield site into a vibrant, productive and desirable campus sector. Figure 171. EAST CAMPUS 10-YEAR CONCEPTUAL PLAN. Graphics are for Illustrative Purposes Only
210 Project Review and Design Guidance - July 2017 Final Plan