List of Illustrations (Figures) Continued Figure # and Description
Page #
Figure 18. Open-Jointed Paver System
45
Figure 19. Porous Concrete
48
Figure 20. Porous Asphalt
50
Figure 21. Cations & Anions in a Soil Profile
62
Figure 22. Trapezoidal Swale
68
Figure 23. Wet Bioswale
73
Figure 24. Compost Blanket and Compost Berm/Sock
75
Figure 25. Constructed Wetland
80
Figure 26. Four Constructed Wetland Sections
82
Figure 27. Bump-Out
83
Figure 28. Bump-Out
83
Figure 29. Flow-Through Planter Being Installed
85
Figure 30. Flow-Through Planter Installed
85
Figure 31. Flow-Through Planter Overflow Pipes
86