Samuel Chen - Portfolio 2018

Page 21

PROPOSED SECTION C-C SCALE 1:20

1. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH ALL RELEVANT ARCHITECTS AND ENGINEERS DRAWINGS DETAILS AND SPECIFICATION. 2. SETTING OUT TO BE THE RESPONSIBILITY OF THE CONTRACTOR, ALL DIMENSIONS TO BE CHECKED ON SITE PRIOR TO COMMENCEMENT OF WORK AND ANY DISCREPANCIES TO BE NOTIFIED TO THE ARCHITECT.

PROPOSED METAL MESH SCREEN TO BE POWDER COATED BLACK

PROPOSED NOC CLAMP LAMP

PROPOSED RAISED PLATFORM

PROPOSED TRELLIS ROOF TIMBER PAINTED ROOF

3. 4. 5.

ALL VARIATIONS IN ASSUMED STRUCTURE TO BE NOTIFIED TO THE ENGINEER. ALL DIMENSIONS TO BE CHECKED ON SITE. ALL DIMENSIONS TO BE CHECKED AND CONFIRMED ON SITE.

6. ALL DISCREPANCIES ARE TO BE REPORTED TO ARCHITECTS BEFORE WORKS ARE COMMENCED. 7.

EXISTING COLUMN G05 DG01

D

PROPOSED VINYL STICKERS TO WINDOWS

UPHOLSTERED FIXED SEATING

AND RESOLVED BY THE

THIS DRAWING IS NOT TO BE SCALED.

8. ALL WORK AND MATERIALS TO BE IN ACCORDANCE WITH THE BUILDING REGULATION DEPARTMENT AND TO COMPLY WITH ALL RELEVANT CODES OF PRACTICE AND BRITISH STANDARD.

G03 G04

DG02

G02

OUNTER BASIN UNDERC WASH

DG04

G01

D

PROPOSED

FEASIBILITY

EXISTING GLASS TO BE RETAINED ADM3817 - CREAMS - West Quay Southampton

DG03

ADMERLIN DESIGN STUDIO

PROPOSED SECTION D-D

REV A- 22-08-17 REV B- 23-08-17 counter, logo altered REV C- 06-09-17 Trellis Roof added

1:20

Section / Elevation D - D

19-09-17

-

A D M 3 8 1 7 P 2 0 3

C o m m ercial S p ace

21

C


Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.