A Study of the Export Financing System in the Philippines

Page 29

23

DOCUMENTARY

WITHOUT

AND

Table II.6 REQUIREMENTS FOR

OTHER

ESTABLISHMENT

OF

BMWs

SUBCONTRACTING

i.

Instruments evidencing covering the proposed

2.

Plant location property;

3.

Plant layout showing and describing the size and construction of the proposed warehouse together with the intended use of each room, Section or compartment as well as the surrounding premises;

4.

Flowchart processing;

5.

Certified the SEC By-Laws

6,

Certified the BTRCP of

absolute warehouse;

showing

showing

means

the

ownership

of

nature

access

of

the

true copy of Registration together with the Articles of Co-Partnership, as the truecopy and BIR;

of

to

work

Registration

8.

Certlfied the BOI;

9.

BOI Indorsement of issues the license

the application (for to operate a BMW);

10.

Copy

of

Inspection

Permit

II.

List

of

articles

12.

List

of

all

13.

Formula of Manufacture, to be exported;

14.

Building

15.

Copy

raw

project

of

manufacture/

with

equipment;

copy

of

to

be

Certificate

from

of

the

Registration

with

garments,

Electrical

GTE_

Department;

manufactured;

materials

(Mayor's)

contract

the

Certificate

List

true

lease

Certificate with of Incorporation and case may be;

7.

of

machineryand

or

to

be

patterns

Permit; feasibility

imported; or

sketches

of

articles

and study

of

BMW

operation.


Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.