06
INTERSECTIONS Key Enhancements 1
2
• Southbound Meredith St reduced to one lane at signals • Two right turn lanes from Meredith St to Rickard Rd eastbound provided (Town Centre Ring Road route) • Signal phasing updated to support Ring Road • Southbound Chapel Rd (north of Rickard Rd) reduced to one lane at signals • Two right turn lanes from Chapel Rd southbound to Rickard Rd westbound provided (Town Centre Ring Road route) • Mixed pedestrian and cycle crossing provided at signals • Signal phasing updated to support Ring Road
3
• Minor changes to line marking • Mixed pedestrian and cycle crossing to south side of Rickard Rd provided at signals • Signal phasing updated to support bus access to Ring Road and Bus Terminal via Jacobs St
4
• Subject to potential redevelopment of centre – carpark access to be removed • Signal phasing updated to support Ring Road
5
• Intersection maintained generally in current arrangement • Signal phasing updated to support Ring Road
6
• Verge footways widened through crossing with traffic reduced to two lanes (one way each way)
7
• Intersection maintained generally in current arrangement • Signal phasing updated to support potential future pedestrian overpass of railway line
8
• Intersection maintained generally in current arrangement • Signal phasing updated to support Ring Road
130 Bankstown Complete Streets
9
• Fetherstone St closed to traffic at North Tce • Signals reconfigured as signalised pedestrian crossing
10
• Verge footways widened through crossing with traffic reduced to two bus lanes (one way each way) • Signals reconfigured at upgraded pedestrian crossing
11
• Bus terminus relocated and verge footways widened • Signalised pedestrian crossings reconfigured • Mixed pedestrian and cycle crossing to east side of Restwell St provided at signals • Signal phasing updated to support new configuration and bus only lanes
19
• New signalised intersection to manage new Jacobs St bus road extension at proposed interchange • Signalised pedestrian crossing of North Tce to west side • Signalised pedestrian crossing of The Appian Way extension to north side of North Tce
20
• Traffic island reconfigured for reduced traffic lanes to South Tce • Signals reconfigured to provide fully signalised and direct pedestrian movement (that is not via traffic island)
21
• Olympic Pde closed to traffic at Greenwood Ave • Mixed pedestrian and cycle crossing connecting Olympic Pde cycle path to existing routes north of the railway line • Signal phasing updated to support Ring Road
22
• Traffic island removed • Signalised crossings reconfigured to provide signalised and direct pedestrian movement (that is not via traffic island) • Southbound lane to Restwell St to be bus only • Signalised mixed pedestrian and cycle crossing of Raymond St to east side of Restwell St
12
• Northbound Chapel Rd reduced to one lane • Signal phasing updated
13
• Mixed pedestrian and cycle crossing to north side of Brandon Ave provided at signals • Signal phasing updated to support Ring Road
14
• Signal phasing updated to support Ring Road
15
• Road closure to Kitchener Pde removed to provide secondary exit to town centre precinct • Signal phasing updated to support Ring Road
23
• Existing roundabout replaced with signalised intersection to support Ring Road and provide for safe pedestrian crossing
16
• RMS Upgrade project
24
17
• New signalised intersection to replace existing raised pedestrian crossing and manage bus access • East west pedestrian arm added in signalised intersection • Signal phasing to support bus interchange access to Jacobs Street extension and pedestrian movements
• New signalised intersection provided to support Ring Road and provide access to Council carpark
25
18
• New signalised intersection to replace existing pedestrian crossings and divert vehicular traffic (excluding buses) to Appian Way shared zone
• New signalised intersection provided to provide safer pedestrian access to schools and Memorial Park, and to link separated cycle paths and shared paths • Separated cycle path to Restwell St also links to shared path to north side of Stanley St
26
• RMS Upgrade project
27
• RMS Upgrade project