Bankstown Complete Streets

Page 130

06

INTERSECTIONS Key Enhancements 1

2

• Southbound Meredith St reduced to one lane at signals • Two right turn lanes from Meredith St to Rickard Rd eastbound provided (Town Centre Ring Road route) • Signal phasing updated to support Ring Road • Southbound Chapel Rd (north of Rickard Rd) reduced to one lane at signals • Two right turn lanes from Chapel Rd southbound to Rickard Rd westbound provided (Town Centre Ring Road route) • Mixed pedestrian and cycle crossing provided at signals • Signal phasing updated to support Ring Road

3

• Minor changes to line marking • Mixed pedestrian and cycle crossing to south side of Rickard Rd provided at signals • Signal phasing updated to support bus access to Ring Road and Bus Terminal via Jacobs St

4

• Subject to potential redevelopment of centre – carpark access to be removed • Signal phasing updated to support Ring Road

5

• Intersection maintained generally in current arrangement • Signal phasing updated to support Ring Road

6

• Verge footways widened through crossing with traffic reduced to two lanes (one way each way)

7

• Intersection maintained generally in current arrangement • Signal phasing updated to support potential future pedestrian overpass of railway line

8

• Intersection maintained generally in current arrangement • Signal phasing updated to support Ring Road

130 Bankstown Complete Streets

9

• Fetherstone St closed to traffic at North Tce • Signals reconfigured as signalised pedestrian crossing

10

• Verge footways widened through crossing with traffic reduced to two bus lanes (one way each way) • Signals reconfigured at upgraded pedestrian crossing

11

• Bus terminus relocated and verge footways widened • Signalised pedestrian crossings reconfigured • Mixed pedestrian and cycle crossing to east side of Restwell St provided at signals • Signal phasing updated to support new configuration and bus only lanes

19

• New signalised intersection to manage new Jacobs St bus road extension at proposed interchange • Signalised pedestrian crossing of North Tce to west side • Signalised pedestrian crossing of The Appian Way extension to north side of North Tce

20

• Traffic island reconfigured for reduced traffic lanes to South Tce • Signals reconfigured to provide fully signalised and direct pedestrian movement (that is not via traffic island)

21

• Olympic Pde closed to traffic at Greenwood Ave • Mixed pedestrian and cycle crossing connecting Olympic Pde cycle path to existing routes north of the railway line • Signal phasing updated to support Ring Road

22

• Traffic island removed • Signalised crossings reconfigured to provide signalised and direct pedestrian movement (that is not via traffic island) • Southbound lane to Restwell St to be bus only • Signalised mixed pedestrian and cycle crossing of Raymond St to east side of Restwell St

12

• Northbound Chapel Rd reduced to one lane • Signal phasing updated

13

• Mixed pedestrian and cycle crossing to north side of Brandon Ave provided at signals • Signal phasing updated to support Ring Road

14

• Signal phasing updated to support Ring Road

15

• Road closure to Kitchener Pde removed to provide secondary exit to town centre precinct • Signal phasing updated to support Ring Road

23

• Existing roundabout replaced with signalised intersection to support Ring Road and provide for safe pedestrian crossing

16

• RMS Upgrade project

24

17

• New signalised intersection to replace existing raised pedestrian crossing and manage bus access • East west pedestrian arm added in signalised intersection • Signal phasing to support bus interchange access to Jacobs Street extension and pedestrian movements

• New signalised intersection provided to support Ring Road and provide access to Council carpark

25

18

• New signalised intersection to replace existing pedestrian crossings and divert vehicular traffic (excluding buses) to Appian Way shared zone

• New signalised intersection provided to provide safer pedestrian access to schools and Memorial Park, and to link separated cycle paths and shared paths • Separated cycle path to Restwell St also links to shared path to north side of Stanley St

26

• RMS Upgrade project

27

• RMS Upgrade project


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.
Bankstown Complete Streets by Hatch RobertsDay - Great Places - Issuu