Construction exam documentation

Page 1

A

B

C

D

E

F

G

H

I

J

K

L NOTES

GENERAL: TO COMPLY WITH SANS 10400

725

2220

6815

ALL MATERIALS AND CONSTRUCTION MUST COMPLY WITH THE NATIONAL BUILDING REGULATIONS (ACT NO 103 OF 1977) INCLUDING ALL AMENDMENTS AS WELL AS THE BY-LAWS OF THE LOCAL AUTHORITIES.

2450

excavation face

C

P206

1

300

7760 8079

3420

ALL LEVELS, DIMENSIONS AND STEPS ARE TO BE CHECKED AND VERIFIED ON SITE BEFORE COMMENCING WITH ANY WORK.

Compacted filling in layers of 300mm

ANY INDISTINCTNESS OR INDIFFERENCES MUST IMMEDIATELY BE POINTED OUT TO THE ARCHITECT FOR RECTIFICATION OR EXPLANATION BEFORE ANY CONSTRUCTION CAN COMMENCE..

A excavation face

DRAWINGS ARE NOT TO BE SCALED

Compacted filling in layers of 300mm

FOUNDATIONS TO ALL BOUNDARY WALLS ARE NOT TO ENCROACH BOUNDARY ALL ELECTRICAL AND PLUMBING WORK IS TO BE CARRIED OUT BY A REGISTERED TRADESMAN. BRICKFORCE AND WALL TIES IS TO BE INSTALLED EVERY 5 COURSES OF BRICKWORK.

COMMUNAL KITCHEN

excavation face Compacted filling in layers of 300mm

POD 1 BEDROOM 3

DRAINAGE:

X 1385 372

1

V 1386 280

A

P203

P203

860

A

ALL PLUMBING AND DRAINAGE WORK AND INSTALLATION OF SANITARY FITTINGS TO COMPLY WITH THE RELEVANT LOCAL AUTHORITY BYE-LAWS, REGULATIONS AND REQUIREMENTS. PROVIDE I.E.'S TO ALL BENDS AND JUNCTIONS WITH SUITABLE MARKERS AT GROUND LEVEL.

shower

P202

Compacted filling in layers of 300mm

C

3

W4 0 75

STUDIO/WORKSHOP 6000

Polished Concrete 22 m2

0 25 00 19

W4

9 21

35 10

Treated Plywood 5.2 m2

750

2

whb

1

POD 2 KITCHEN Treated Plywood 5.15 m2

D5

200

D8 807

13

COMMUNAL FOYER14 Treated Plywood 8.3 m2 V 1385 880

1

15

2 3

W7

4

6

5

912

4

1800

3

1

750

wc

400

W5

2

W2

Permeable Gravel Covering

110dia uPVC discharge stub stack. Invert level at min depth of 450mm.

P202

concrete staircase as per architect's detail Main water supply

Main water supply

ce Garden 1

D4

5 P20

ie

1:60 t min ipe a p e in dra st pip arve PVC ter h 0mm a 1 w 1 New pper m co 22m

ie

B

1270

6

ALL PLYWOOD TO BE TREATED ACCORDINGLY TO SPECIFICATION TO COMPLY WITH SANS 10400-T

W6

shower

V 1386 280

800

TO COMPLY WITH SANS 10082

1765

V 1385 880

Treated Plywood 3 m2

213

12

I.E.'S TO WASTE PIPES TO BE FULLY ACCESSIBLE AT ALL TIMES.

TIMBER WALLS:

11

2

Compacted filling in layers of 300mm

570

D6

WC

POD 2 BEDROOM

V 1385 280

D3

X 1385 372

16

4

wc V 1385 880

Treated Plywood 10 m2

3400

0 64

10

17

5

Treated Plywood 1.75 m2

9

PROVIDE A.E. TO FOOT OF ALL SOIL STACKS.

de stra alu

30 15

WC

0 29

W3

W3

6

1000mm High aluminum balustrade

ce

8

eb pip inum lum

110dia uPVC discharge stub stack. Invert level at min depth of 450mm.

7

whb

70 11

ha Hig

ce

30 15

COMMUNAL LIVING

mm

5 P20

B

R 3800 19 50

P202

wc

D2

W3

Succulent Garden 1 W3

W4

4

0 100

3

PROVIDE APPROVED RESEAL TRAPS TO ALL WASTE FITTINGS.

8850

Treated Plywood 2.84 m2 whb

1.40 slope

Custom Concrete Water harvesting tank with seating

R

WC

Succulent Garden 4

P206

1629

Succulent Garden 2

MINIMUM FALL TO ALL DRAIN PIPES TO BE 1:40.

excavation face

Treated Plywood 5.8 m2

Compacted filling in layers of 300mm

240

POD 1 KITCHEN

1

excavation face

3

TO COMPLY WITH SANS 10400-P

Succulent Garden 3

Water harvesting pond

5

Treated Plywood 7.6 m2

W2

2

4000

2

PROVIDE DPC TO WALL AT SLAB LEVEL, UNDER ALL CILLS AND TO ALL CHANGES IN FLOOR LEVELS REFER TO SECTIONS.

Treated Plywood 6 m2

Succulent Garden 5

110mm uPVC drain pipe at min 1:60

110mm uPVC drain pipe at min 1:60

ie Succulent Garden 6

1512

ce Filtration system and water pump

2000

SHARED STORAGE

No

Garden 2

Polished Concrete 10 m2

7

Description

Date

A Annotation,dimensions and details

Issued by

06/10/2020

R. Symons

Phase 2 unit

Phase 2 unit

SEMI-BASEMENT FLOORPLAN 1: 50

PROPERTY

ERF R/196 PROJECT

Tram and Bronkhorst Development TITLE

SEMI-BASEMENT FLOORPLAN CLIENT

R. SYMONS 1

Timber and Concrete wall connection detail 1:5

2

Timber frame wall end articulation 1:5

3

Timber and Facebrick wall connection detail 1:5

DRAWN BY

STUDENT NUMBER

DATE

R. SYMONS

18098292

08/28/20

SCALE (@ A1)

PROJECT NUMBER

As indicated

ONT300P2

DRAWING NUMBER

REV

P202

2-13


NOTES

GENERAL:

.., K

./ L

,-

H

I'

., J

-

TO COMPLY WITH SANS 10400

,,,

G

F

/ D

,, E

C,

A.

.. B

ALL MATERIALS AND CONSTRUCTION MUST COMPLY WITH THE NATIONAL BUILDING REGULATIONS (ACT NO 103 OF 1977) INCLUDING ALL AMENDMENTS AS WELL AS THE BY-LAWS OF THE LOCAL AUTHORITIES. ALL LEVELS, DIMENSIONS AND STEPS ARE TO BE CHECKED AND VERIFIED ON SITE BEFORE COMMENCING WITH ANY WORK. ANY INDISTINCTNESS OR INDIFFERENCES MUST IMMEDIATELY BE POINTED OUT TO THE ARCHITECT FOR RECTIFICATION OR EXPLANATION BEFORE ANY CONSTRUCTION CAN COMMENCE.. DRAWINGS ARE NOT TO BE SCALED FOUNDATIONS TO ALL BOUNDARY WALLS ARE NOT TO ENCROACH BOUNDARY

T/OLevel Screen 10 14626 1400 510

ALL ELECTRICAL AND PLUMBING WORK IS TO BE CARRIED OUT BY A REGISTERED TRADESMAN. BRICKFORCE AND WALL TIES IS TO BE INSTALLED EVERY 5 COURSES OF BRICKWORK. PROVIDE DPC TO WALL AT SLAB LEVEL, UNDER ALL CILLS AND TO ALL CHANGES IN FLOOR LEVELS REFER TO SECTIONS.

DRAINAGE: TO COMPLY WITH SANS 10400-P ALL PLUMBING AND DRAINAGE WORK AND INSTALLATION OF SANITARY FITTINGS TO COMPLY WITH THE RELEVANT LOCAL AUTHORITY BYE-LAWS, REGULATIONS AND REQUIREMENTS. PROVIDE I.E.'S TO ALL BENDS AND JUNCTIONS WITH SUITABLE MARKERS AT GROUND LEVEL.

1400 540

MINIMUM FALL TO ALL DRAIN PIPES TO BE 1:40.

12275 1398 160

PROVIDE APPROVED RESEAL TRAPS TO ALL WASTE FITTINGS.

Custom roof garden gutter to architects detail.. 110mm diameter UPVC stack vent pipe.

460

260

T/O Roof9 Level

PROVIDE A.E. TO FOOT OF ALL SOIL STACKS. I.E.'S TO WASTE PIPES TO BE FULLY ACCESSIBLE AT ALL TIMES.

Treated Plywood

TIMBER WALLS: TO COMPLY WITH SANS 10082

vp

880

300

880

100

560

500

Second Floor 13959275 160 ie

FFL 1394 385

228

ie

460

1350

1180

260

off-shutter concrete

300 200 300

100

660

2665

ALL PLYWOOD TO BE TREATED ACCORDINGLY TO SPECIFICATION TO COMPLY WITH SANS 10400-T

W15

815

W13

5935

100

FFL 1391 405

First Floor Level 6

650

1000

13915450 330 Facebrick with raked joint 1056

160 374

110mm diameter UPVC discharge stack pipe.

600

3000

No

Description

Date

C Annotation,dimensions and details F Levels

Issued by

19/11/2020 24/11/2020/

R. Symons R.Symons

Off-shutter concrete

Off-shutter concrete

ie

ie

BRONKHORST ST.

FFL 1388 300

Groundfloor 13882420 300

ce

400

1400

160

4940

450

Off-shutter concrete

567

260

560

Off-shutter concrete 260

2337

1440

W14

1700

540

W12

1366

1920

Facebrick with raked joint

6500

2420

NGL

110mm diameter UPVC soil pipe laid at a minimum fall of 1:40 to municipal connection.

PROPERTY

ERF R/196

400

Semi-basement 0 1385 880

3870

PROJECT

Tram and Bronkhorst Development TITLE

1

West Elevation

West Elevation 1 : 50 CLIENT

R. SYMONS DRAWN BY

STUDENT NUMBER

DATE

R. Symons

18098292

Callout 1

SCALE (@ A1)

1 : 50

PROJECT NUMBER

ONT300P2

DRAWING NUMBER

REV

P207

4-13 F


NOTES

GENERAL: TO COMPLY WITH SANS 10400 Level 10 ALL MATERIALS AND CONSTRUCTION MUST COMPLY WITH THE NATIONAL BUILDING REGULATIONS 14626

L

K

J

I

H

G

F

E

D

C

B

(ACT NO 103 OF 1977) INCLUDING ALL AMENDMENTS AS WELL AS THE BY-LAWS OF THE LOCAL AUTHORITIES.

A

ALL LEVELS, DIMENSIONS AND STEPS ARE TO BE CHECKED AND VERIFIED ON SITE BEFORE COMMENCING WITH ANY WORK. ANY INDISTINCTNESS OR INDIFFERENCES MUST IMMEDIATELY BE POINTED OUT TO THE ARCHITECT FOR RECTIFICATION OR EXPLANATION BEFORE ANY CONSTRUCTION CAN COMMENCE.. DRAWINGS ARE NOT TO BE SCALED

330x 4860 x 50mm treated plywood Louver member fixed to planters , members @550mm c/c .

FOUNDATIONS TO ALL BOUNDARY WALLS ARE NOT TO ENCROACH BOUNDARY

250

2515

250

1400

ALL ELECTRICAL AND PLUMBING WORK IS TO BE CARRIED OUT BY A REGISTERED TRADESMAN.

Planter as per architects detail.

BRICKFORCE AND WALL TIES IS TO BE INSTALLED EVERY 5 COURSES OF BRICKWORK.

Galvanized mild steel mesh 920

PROVIDE DPC TO WALL AT SLAB LEVEL, UNDER ALL CILLS AND TO ALL CHANGES IN FLOOR LEVELS REFER TO SECTIONS.

Growing medium as per landscape architects specification.

DRAINAGE: Ø20 x 1000mm galvanized mild steel bar bended to architects specification to be cast in place at 100mm c/c, painted

TO COMPLY WITH SANS 10400-P

300x 100 x 20mm galvanized mild steel lipped channel cut and installed acc. to architect specification.

Bitumen waterproofing membrane, with 75mm side laps and 100mm end laps sealed to primed screed surface by torchfusion.Including a 150mm layer of protection of clean topsoil on 4mm HDPE drainage core above waterproofing cover with geotextile. Install to specialist instructions.

356x 171 x 45mm galvanized mild steel I-Section, column cut and installed acc. to architect specification.

WC

2600 2608

1000

vp

Min 50mm screed to fall to outlets with a 75 x 75mm shaped fillets at roof edges

ALL PLUMBING AND DRAINAGE WORK AND INSTALLATION OF SANITARY FITTINGS TO COMPLY WITH THE RELEVANT LOCAL AUTHORITY BYE-LAWS, REGULATIONS AND REQUIREMENTS.

Facebrick

PROVIDE I.E.'S TO ALL BENDS AND JUNCTIONS WITH SUITABLE MARKERS AT GROUND LEVEL. MINIMUM FALL TO ALL DRAIN PIPES TO BE 1:40.

110mm diameter UPVC stack vent pipe.

PROVIDE APPROVED RESEAL TRAPS TO ALL WASTE FITTINGS.

Second Floor 9275 1395 160

WC

ie

ie

255mm thick reinforced concrete roof slab acc. to engineer specifications. 38 x 50mm Battens @ 450 c/c. Nailed to concrete slab.

W12

Reinforced brick-on-edge lintel

TO COMPLY WITH SANS 10082

312x 8900 x 50mm treated plywood Louver member fixed to horizontal plywood member at 500 c/c. Louver system to be installed to architect specification.

2975

2

Gallery

P212

Off -shutter concrete with Stained Finish

1

Treated Plywood

ALL PLYWOOD TO BE TREATED ACCORDINGLY TO SPECIFICATION TO COMPLY WITH SANS 10400-T

240 x 50mm treated plywood Louver member bolted to wall @ 500 c/c . Louver system to be installed to architect specification.

107

Communal Laundry

I.E.'S TO WASTE PIPES TO BE FULLY ACCESSIBLE AT ALL TIMES.

TIMBER WALLS:

W2

W13

PROVIDE A.E. TO FOOT OF ALL SOIL STACKS.

FFL 1394 385 DPC

812

255mm thick reinforced concrete roof slab acc. to engineer specifications.

WC

DPC

325

250

8900

600

100mm expanded polystyrene insulation board laid onto roof slab .

6mm Aluminum glazed glass shopfront window to be installed acc. to specialist specification.

P214

3026

Ø20 x 1000mm galvanized mild steel bar bended to architects specification to be cast in place at 100mm c/c, painted

W12 DPC

250mm Reinforced concrete flat slab acc. to engineers specification. 340mm retaining wall acc. to engineers specification

945

1053

2500

110mm diameter UPVC discharge stack pipe.

WC

DPC

W2

155

2800

W9

905

1380

Reinforced concrete footing acc. to engineer specification

ie DPC

ce

UFFL 1388 225

NGL 150mm Reinforced concrete slab acc. to engineers specification. Reinforced concrete ground beam acc. to engineers specification. dpm Reinforced concrete column footing acc. to engineers specification. 110mm diameter UPVC soil pipe laid at a minimum fall of 1:40 to municipal connection. Facebrick paving laid on 25mm sand layer and laid out acc. to architects specifications No. 4 fine aggregate fill over non-woven needle punched polypropylene fabric geotextile

UFFL 1385 372

Reinforced concrete footing acc. to engineer specification

ie

75 mm screed, floated.

250 2480

POD 1 BEDROOM

32mm UPVC weephole cast in place @1500 c/c

W12

230

252 145

720

190mm precast concrete sill block

600

1440

NGL

D2

800

POD 1 KITCHEN

640

Off -shutter concrete with Stained Finish

330

COMMUNAL KITCHEN

WC

DPC

880

water harvesting fountain

WC

600

POD 1 LIVING ROOM LOFT

460

885

W10

2000mm x 2700mm drywall WC partition bolted to concrete slab. To be Installed acc. to suppliers specification.

2100

W12

W12

W12

4500

652

Facebrick

DPC

Treated plywood floor finish as per specifications [SHEET P206]

DPC

5780

797

797

849

82

150mm concrete water fountain base

Reinforced concrete dry structural leaf acc. to engineer specification, with driftwood Renocrete finish applied as per product description.

362mm Composite wall with 150mm concrete infill, outer Facebrick leaf with wire ties laid every 5 course

250 x 250mm Reinforced concrete column.

1987

4mm Torch-on fusions waterproof membrane

DPC

UFFL 1390 532

1660

255mm thick reinforced concrete roof slab acc. to engineer specifications. 8mm Thick treated plywood ceiling fixed to metal hanger system acc. to Architects detail Custom Plywood Cupboard to architects detail [SHEET P212]

1000

Bitumen waterproofing membrane, with 75mm side laps and 100mm end laps sealed to primed screed surface by torchfusion.Including a 150mm layer of protection of clean topsoil on 4mm HDPE drainage core above waterproofing cover with geotextile. Install to specialist instructions. Min 50mm screed to fall to outlets with a 75 x 75mm shaped fillets at roof edges. 100mm expanded polystyrene insulation board laid onto roof slab .

First Floor 5450 1391 330

FFL 1391 405 DPC

water harvesting fountain

Groundfloor 2420 1388 300

No

Description

Date

A Annotation,dimensions and details B Foundation,footings & ceiling

Issued by

06/10/2020 06/10/2020

R. Symons R. Symons

Semi-basement 13850880

1.0mm polyolefin waterproofing member that complies with SANS 952 type C

330

65mm Geopipe at 1:40 slope

Reinforced concrete foundation acc. to engineer specification

PROPERTY

150mm concrete wet leaf to engineer specification Compacted soil fill in layers of no more than 300mm

ERF R/196

5500

Reinforced concrete column footing acc. to engineer specification Treated timber cupboard as per architects detail

100 mm reinforced concrete base acc to engineer specification

PROJECT

Tram and Bronkhorst Development TITLE

A

SECTION A

Section A 1: 50 CLIENT

R. SYMONS DRAWN BY

STUDENT NUMBER

DATE

R. Symons

18098292

27/10/2020

SCALE (@ A1)

1 : 50

PROJECT NUMBER

ONT300P2

DRAWING NUMBER

REV

P204

13 5-B


T/O LevelRoof 9

600

vp

300

60x40x3 Galvanized mild Rectangular hollow section frame bolted to timber studs,painted

1080

12275 1398 160

screed sloped to outlet Aluminum edge strip cut to architects specifications

138

W5

wc TREATED PLYWOOD

2

W3

887

20mm diameter galvanized steel bar welded to rectangular section, spaced at 100 c/c

D3

100mm expanded polystyrene board Torch on fusion waterproofing with 100mm side and end laps 50mm glass wool fibre insulation 110mm diameter UPVC stack vent pipe.

DPC

P210

1414

2550

2750

ALL MATERIALS AND CONSTRUCTION MUST COMPLY WITH THE NATIONAL BUILDING REGULATIONS (ACT NO 103 OF 1977) INCLUDING ALL AMENDMENTS AS WELL AS THE BYLAWS OF THE LOCAL AUTHORITIES.

DRAWINGS ARE NOT TO BE SCALED

300

372 74

TO COMPLY WITH SANS 10400

ANY INDISTINCTNESS OR INDIFFERENCES MUST IMMEDIATELY BE POINTED OUT TO THE ARCHITECT FOR RECTIFICATION OR EXPLANATION BEFORE ANY CONSTRUCTION CAN COMMENCE..

wc

DPC

GENERAL:

ALL LEVELS, DIMENSIONS AND STEPS ARE TO BE CHECKED AND VERIFIED ON SITE BEFORE COMMENCING WITH ANY WORK.

whb

Second Floor 9275 1395 160

NOTES

W5

POD 2 LOFT

887

ALL ELECTRICAL AND PLUMBING WORK IS TO BE CARRIED OUT BY A REGISTERED TRADESMAN. PROVIDE DPC TO WALL AT SLAB LEVEL, UNDER ALL CILLS AND TO ALL CHANGES IN FLOOR LEVELS REFER TO SECTIONS.

TREATED PLYWOOD

DRAINAGE:

DPC

PROVIDE I.E.'S TO ALL BENDS AND JUNCTIONS WITH SUITABLE MARKERS AT GROUND LEVEL.

FFL 1392 144

3700

1181

TO COMPLY WITH SANS 10400-P

No

wc

D3

TREATED PLYWOOD

C

887

W3

W5

E

Description Annotation,dimensions and details Roof assembly

Date

Issued by

19/11/2020 R. Symons 24/11/2020 R.Symons

DPC

First Floor 5450 330 1391

1342

whb wc

DPC

PROPERTY

W5

POD 2 LOFT

21mm Plywood floor board screwed to floor joist 50x150 SA pine floor joist 20mm acoustic matt underlay

3700

1181

920

DPC

2385

TREATED PLYWOOD

D3 whb

DPC

Semi-basement 0 1385 880

SA pine header 12mm Treated Plywood ceiling board screwed to floor joist @500 c/c 38x 144mm SA pine nogging 21mm treated plywood fixed to particle board with metal panel clips 50mm diameter UPVC waste water pipe 38x114 SA pine stud @400 c/c

DPC

wc

TITLE

SECTION B

887

W5

Tram and Bronkhorst Development

FFL 1388 462

1175

W3

wc

192X38 SA pine Lintel PROJECT

TREATED PLYWOOD

Groundfloor 2420 300 1388

ERF R/196

887

1138

300

900

FFL 1390 532

75 mm screed, floated. 114x 38 SA pine timber bottom rail bolted to slap

CLIENT

R. SYMONS DRAWN BY

STUDENT NUMBER

1

Section B 1 : 50

1 P210

ONT300P2

18098292 DATE

27/10/2020 110mm diameter UPVC soil pipe laid at a minimum fall of 1:40 to municipal connection.

PROJECT NUMBER

R. Symons

SCALE (@ A3)

1 : 50 DRAWING NUMBER

P205

REV

6-13 E


1x

z 2

3l

Bitumen waterproofing membrane, with 75mm side laps and 100mm end laps sealed to primed screed surface by torchfusion.Including a 150mm layer of protection of clean topsoil on 4mm HDPE drainage core above waterproofing cover with geotextile. Install to specialist instructions.

NOTES

GENERAL:

Min 50mm screed to fall to outlets with a 75 x 75mm shaped fillets at roof edges.

TO COMPLY WITH SANS 10400

100mm expanded polystyrene insulation board laid onto roof slab .

ALL MATERIALS AND CONSTRUCTION MUST COMPLY WITH THE NATIONAL BUILDING REGULATIONS (ACT NO 103 OF 1977) INCLUDING ALL AMENDMENTS AS WELL AS THE BYLAWS OF THE LOCAL AUTHORITIES.

255mm thick reinforced concrete roof slab acc. to engineer specifications.

1 Ø20 x 1000mm galvanized mild steel bar bended to architects specification to be cast in place at 100mm c/c, painted

ANY INDISTINCTNESS OR INDIFFERENCES MUST IMMEDIATELY BE POINTED OUT TO THE ARCHITECT FOR RECTIFICATION OR EXPLANATION BEFORE ANY CONSTRUCTION CAN COMMENCE.. DRAWINGS ARE NOT TO BE SCALED

920

Second Floor 9275 160 1395

ALL LEVELS, DIMENSIONS AND STEPS ARE TO BE CHECKED AND VERIFIED ON SITE BEFORE COMMENCING WITH ANY WORK.

1000

P209

ALL ELECTRICAL AND PLUMBING WORK IS TO BE CARRIED OUT BY A REGISTERED TRADESMAN. PROVIDE DPC TO WALL AT SLAB LEVEL, UNDER ALL CILLS AND TO ALL CHANGES IN FLOOR LEVELS REFER TO SECTIONS.

300x 100 x 20mm galvanized mild steel lipped channel cut and installed acc. to architect specification.

DRAINAGE:

356x 171 x 45mm galvanized mild steel I-Section, column cut and installed acc. to architect specification.

W12 584

TO COMPLY WITH SANS 10400-P

16mm Thick plywood ceiling fixed to battens acc. to Architects detail

PROVIDE I.E.'S TO ALL BENDS AND JUNCTIONS WITH SUITABLE MARKERS AT GROUND LEVEL.

1125

DPC

Communal Laundry

No

Description

Date

Issued by

Treated Plywood

Galvanized mild steel wall ties every 6 brick course

W12

Level 6 First Floor 5450 330 1391

DPC

16mm Thick plywood floor board acc. to Architects detail PROPERTY

dpm

ERF R/196

UFFL 1390 532

weep hole 30x 6 flat Galvanized mild steel hanger bolted to slab

220 230

490

1780 1332

357

W12

Aluminum edge strip bolted to fountain wall Facebrick paving

150mm reinforced floor slab as per engineers specifications 16mm Thick plywood ceiling board acc. to Architects detail

PROJECT

Tram and Bronkhorst Development

DPC TITLE

50mm sand blinding laid on geotextile

840

1475 4490

75mm aggregate base course laid on well compacted soil

Groundfloor 2420 300 1388

SECTION C

114x38 SA pine rail

38x 114 SA pine stud @400 c/c

305x150 mm concrete barrier cerb

CLIENT

R. SYMONS

38x192 SA pine lintel 150mm concrete water fountain base 4mm Torch-on fusions waterproof membrane Reinforced concrete dry structural leaf acc. to engineer specification.

584

W12

POD 1 BEDROOM

DRAWN BY

DPC

50mm mineral fibre insulation 32mm plywood cover cut to architects specification 1093

Soil filling compacted in layers of 300mm

polyolefin waterproofing

Semi-basement 0 1385 880

STUDENT NUMBER

32mm plywood storage side panel fixed to timber frame to architects specification 114x38 SA pine bottom rail bolted to floor slab

DPC

1

1 : 50

polyolefin waterproofing Reinforced concrete base acc. to engineer specification. Reinforced concrete floor slab acc. to engineer

ONT300P2

18098292 DATE

27/10/2020 SCALE (@ A3)

Section C

PROJECT NUMBER

R. Symons

1 : 50 DRAWING NUMBER

P206

REV

7-13


,H

G

100 140

,,, F

1x

z 2

1000

1000

100

540

Ø20 x 1000mm galvanized mild steel bar bended to architects specification to be cast in place at 100mm c/c, painted

250

Second Floor 9275 1395 160

NOTES

GENERAL: TO COMPLY WITH SANS 10400

150

830

2350

100 100

ALL LEVELS, DIMENSIONS AND STEPS ARE TO BE CHECKED AND VERIFIED ON SITE BEFORE COMMENCING WITH ANY WORK.

920

200

920

300

ALL MATERIALS AND CONSTRUCTION MUST COMPLY WITH THE NATIONAL BUILDING REGULATIONS (ACT NO 103 OF 1977) INCLUDING ALL AMENDMENTS AS WELL AS THE BY-LAWS OF THE LOCAL AUTHORITIES.

ANY INDISTINCTNESS OR INDIFFERENCES MUST IMMEDIATELY BE POINTED OUT TO THE ARCHITECT FOR RECTIFICATION OR EXPLANATION BEFORE ANY CONSTRUCTION CAN COMMENCE..

260

DRAWINGS ARE NOT TO BE SCALED FOUNDATIONS TO ALL BOUNDARY WALLS ARE NOT TO ENCROACH BOUNDARY ALL ELECTRICAL AND PLUMBING WORK IS TO BE CARRIED OUT BY A REGISTERED TRADESMAN.

2

BRICKFORCE AND WALL TIES IS TO BE INSTALLED EVERY 5 COURSES OF BRICKWORK.

P209

PROVIDE DPC TO WALL AT SLAB LEVEL, UNDER ALL CILLS AND TO ALL CHANGES IN FLOOR LEVELS REFER TO SECTIONS.

DRAINAGE: 16mm Thick plywood ceiling panel fixed to battens acc. to Architects detail 300x 100 x 20mm galvanized mild steel lipped channel cut and installed acc. to architect specification.

TO COMPLY WITH SANS 10400-P ALL PLUMBING AND DRAINAGE WORK AND INSTALLATION OF SANITARY FITTINGS TO COMPLY WITH THE RELEVANT LOCAL AUTHORITY BYE-LAWS, REGULATIONS AND REQUIREMENTS. PROVIDE I.E.'S TO ALL BENDS AND JUNCTIONS WITH SUITABLE MARKERS AT GROUND LEVEL. MINIMUM FALL TO ALL DRAIN PIPES TO BE 1:40.

356x 171 x 45mm galvanized mild steel I-Section, column cut and installed acc. to architect specification.

PROVIDE APPROVED RESEAL TRAPS TO ALL WASTE FITTINGS.

2905

PROVIDE A.E. TO FOOT OF ALL SOIL STACKS.

Single leaf Facebrick wall

I.E.'S TO WASTE PIPES TO BE FULLY ACCESSIBLE AT ALL TIMES.

TIMBER WALLS:

W15

TO COMPLY WITH SANS 10082

5600

ALL PLYWOOD TO BE TREATED ACCORDINGLY TO SPECIFICATION TO COMPLY WITH SANS 10400-T

Level 8 First Floor 5460 330 1391

16mm Thick plywood floor board acc. to Architects detail 150mm reinforced floor slab as per engineers specifications dpm weep hole

UFFL 1390 532

1930

30x 6 flat Galvanized mild steel hanger bolted to slab

No

Description

Date

C Annotation,dimensions and details

Issued by

19/11/2020

R. Symons

Galvanized wall ties every 6 course

W14

230

540

220

Aluminum edge strip bolted to fountain wall Facebrick paving Aluminum edge strip bolted to fountain wall

260

50mm bedding sand laid on geotextile

75mm aggregate sub-base course laid on well compacted soil Aluminum Flashing Reinforced concrete dry structural leaf acc. to engineer specification.

ERF R/196

840

Groundfloor 2420 300 1388

PROPERTY

Off-shutter concrete

Reinforced concrete dry structural leaf acc. to engineer specification.

305x150 mm concrete barrier cerb

Base plate welded to I-section 100mm concrete base

NGL

NGL

Concrete haunching behind every kerb joint concrete base

4mm Torch-on fusions waterproof membrane with 100mm side and end laps laid on primed surface and installed acc. to suppliers 150mm concrete water fountain base Soil filling compacted in layers of 300mm

370

Plywood storage cover panel to architects specification

Semi-basement 0 1385 880

2

Portion of West Elevation 1 : 20

3

Section C -Detail Edge Section 1 : 20

PROJECT

Tram and Bronkhorst Development TITLE

Detail Edge Section & Portion of West facade CLIENT

R. SYMONS

32mm plywood storage side panel fixed to timber frame to architects specification

50mm concrete blinding

DRAWN BY

STUDENT NUMBER

DATE

R. Symons

18098292

27/10/2020

SCALE (@ A1)

1 : 20

PROJECT NUMBER

ONT300P2

reinforce concrete floor slab as per engineers specification

DRAWING NUMBER

REV

1.0mm polyolefin waterproofing

P208

8-13 C


1x NOTES

GENERAL: TO COMPLY WITH SANS 10400 ALL MATERIALS AND CONSTRUCTION MUST COMPLY WITH THE NATIONAL BUILDING REGULATIONS (ACT NO 103 OF 1977) INCLUDING ALL AMENDMENTS AS WELL AS THE BYLAWS OF THE LOCAL AUTHORITIES.

Ø20 x 1000mm galvanized mild steel bar bended to architects specification to be cast in place at 100mm c/c, painted

ALL LEVELS, DIMENSIONS AND STEPS ARE TO BE CHECKED AND VERIFIED ON SITE BEFORE COMMENCING WITH ANY WORK. ANY INDISTINCTNESS OR INDIFFERENCES MUST IMMEDIATELY BE POINTED OUT TO THE ARCHITECT FOR RECTIFICATION OR EXPLANATION BEFORE ANY CONSTRUCTION CAN COMMENCE.. DRAWINGS ARE NOT TO BE SCALED ALL ELECTRICAL AND PLUMBING WORK IS TO BE CARRIED OUT BY A REGISTERED TRADESMAN.

Ø75 galvanized steel cover plate

PROVIDE DPC TO WALL AT SLAB LEVEL, UNDER ALL CILLS AND TO ALL CHANGES IN FLOOR LEVELS REFER TO SECTIONS.

DRAINAGE: TO COMPLY WITH SANS 10400-P

250

PROVIDE I.E.'S TO ALL BENDS AND JUNCTIONS WITH SUITABLE MARKERS AT GROUND LEVEL.

Planting medium as per landscape architects specification

Second Floor 9275 160 1395

Cast in place metal reglet with counter flashing laid over waterproofing

Planting medium as per landscape architects specification non-woven continuous filament needle polyester geotextile with minimum 150mm side and end laps. 300x 50 x 20mm Galvanized mild steel plate welded to channel, painted

No C

Description Annotation,dimensions and details

Date

Issued by

19/11/2020 R. Symons

non-woven continuous filament needle polyester geotextile with minimum 150mm side and end laps. drainage layer of NO.4 fine grade aggregate 240

HDPE membrane fabric overlapped of 150mm at edge and ends, membrane to be installed as suppliers instructions

540 290

PROPERTY

ERF R/196

920

Bitumen waterproofing membrane with 75mm side an end laps sealed to primed surface by torchfusion.

100

min. 50mm screed sloped to falls

300x 100 x 20mm Galvanized mild steel lipped channel cut acc. to architect specification cast into roof slab, painted

100mm expanded polystyrene insulation board

250mm thick reinforced concrete roof slab to engineers specification

PROJECT

Tram and Bronkhorst Development TITLE

Roof garden spout detail

300x 95 x 20mm Galvanized mild steel plate welded to channel, painted CLIENT

Rain water drip

R. SYMONS

356x 171 x 45mm galvanized mild steel I-Section, column cut and installed acc. to architect specification.

DRAWN BY

PROJECT NUMBER

R. Symons STUDENT NUMBER

ONT300P2

18098292 DATE

27/10/2020

1

Section C - Callout 1- Roof garden spout 1 : 10

SCALE (@ A3)

1 : 10 DRAWING NUMBER

P209

REV

9-14 1


204

LevelRoof 9 T/O 12275 1398 160

Galvanized mild steel end strip bolted to Timber nogging

147

NOTES

65

Aggregate layer 130

TO COMPLY WITH SANS 10400

250 micron dpc with 75mm side and end laps

W5

Torch on fusion waterproofing with 100mm side and end laps

screed sloped to outlet 60x40x3 Galvanized mild Rectangular hollow section frame bolted to timber studs,painted

256 249

42

Treated plywood window sill cut to architects specification

dpc

32mm Particle board screwed to SA pine joist

490

158

20mm diameter galvanized steel bar welded to rectangular section, spaced at 100 c/c

100mm expanded polystyrene board

ALL MATERIALS AND CONSTRUCTION MUST COMPLY WITH THE NATIONAL BUILDING REGULATIONS (ACT NO 103 OF 1977) INCLUDING ALL AMENDMENTS AS WELL AS THE BYLAWS OF THE LOCAL AUTHORITIES. ALL LEVELS, DIMENSIONS AND STEPS ARE TO BE CHECKED AND VERIFIED ON SITE BEFORE COMMENCING WITH ANY WORK. ANY INDISTINCTNESS OR INDIFFERENCES MUST IMMEDIATELY BE POINTED OUT TO THE ARCHITECT FOR RECTIFICATION OR EXPLANATION BEFORE ANY CONSTRUCTION CAN COMMENCE..

38

DRAWINGS ARE NOT TO BE SCALED

50mm mineral fibre insulation blanket

DRAINAGE:

21mm treated plywood fixed to particle board with metal panel clips

50x150 SA pine joist 144x 38 SA pine nogging

530

228

ALL ELECTRICAL AND PLUMBING WORK IS TO BE CARRIED OUT BY A REGISTERED TRADESMAN. PROVIDE DPC TO WALL AT SLAB LEVEL, UNDER ALL CILLS AND TO ALL CHANGES IN FLOOR LEVELS REFER TO SECTIONS.

110mm diameter UPVC discharge stack pipe.

330

GENERAL:

38x 144mm SA pine nogging

TO COMPLY WITH SANS 10400-P PROVIDE I.E.'S TO ALL BENDS AND JUNCTIONS WITH SUITABLE MARKERS AT GROUND LEVEL.

9mm particle board screwed to timber frame 12mm Treated plywood panel fixed to particle board with metal panel clips

50 mineral fibre insulation Silicone Sealant

No C D E

Description Annotation,dimensions and details Sealant Roof assembly

228

9mm particle board screwed to SA pine 38x114 SA pine stud @400 c/c 250micron dpc with 75mm side and end laps

Issued by

19/11/2020 R. Symons 24/11/2020 R.Symons

PROPERTY

60

144

136

21

ERF R/196

110mm diameter UPVC Single Socket Access 90° Bend

2

Section B - Callout 2 1 : 10

PROJECT

Tram and Bronkhorst Development

75 mm screed, floated. 114x 38 SA pine timber bottom rail bolted to slab

38

228

330

wc

Date

19/11/2020 R. Symons

100

330

38x 38mm SA pine frame member

38

1142

228

38

38x 192 SA pine Lintel

dpm Silicone Sealant

Semi-basement 1385 8800

110mm diameter UPVC soil pipe

TITLE

Section B Callout details

CLIENT

R. SYMONS DRAWN BY

PROJECT NUMBER

R. Symons STUDENT NUMBER

ONT300P2

18098292 DATE

27/10/2020

1

Section B - Callout 1 1 : 10

SCALE (@ A3)

1 : 10 DRAWING NUMBER

P210

REV

10-E13


200x200x400mm Prefab Galvanized mild steel planter bolted to plywood member @1000mmc/c, painted

330x 4860 x 50mm treated plywood Louver member bolted to stirrup post anchor , members @550mm c/c . Stainless steel fitting clips bolted to planter

450X 800x 2mm Galvanized steel square punched mesh fixed to planter box with metal clips, painted

330x 300x 50mm hot dip galvanised mild steel stirrup post anchor cast in place, painted 362mm Composite wall with 150mm concrete infill, outer Facebrick leaf with wire ties laid every 5 course

2

Section 1 - Callout 1- Louver detail 1 : 10


240 x 50mm treated plywood Louver member bolted to wall @ 500 c/c . Ø13.5 pre-drilled holes @500c/c Ø13.5 pre-routed groove, ends to be sealed

312 x 50mm treated plywood Louver member fixed to horizontal plywood member at 1000 c/c.

14mm galvinized mld steel treaded bar cheiclly anchored to concrete slab at 500c/c

1

Sectin 1- Callout 2- Louver assembly