DESIGN PORTFOLIO

Page 16

NATURAL DAYLIGHTING STRATEGY WITH THE HELP OF SKYLIGHTS AND THE SUNSCREEN SYSTEM THERE WILL BE SEVERAL LIGHTING CONDITIONS PROVIDED IN THE BUILDING: A: LIGHT REFRACTED AFTER PASSING THE SKYLIGHT C: THE SUNSCREEN SYSTEM BLOCKS DIRECT SUNLIGHT B: LIGHT DAPPLED AFTER PASSING THE LATTICE CEILING D: DAYLIGHT WILL REACHES THIS POINT WHEN THE SUN SCREEN IS OPEN C: LIGHT DIFFUSED AFTER PASSING THE LATTICE CEILING

Reinf. CMU Parapet Wall W/Liquid Applied Membrane 7/8” Vert Hat Channel Furring Strips @ 16” O.C and Weathered Copper Panels Mech. Fastened @ 16” O.C.

A

C

HSS Tube Framing W/ Vert. H.S.S Tube Framing @ 13’ 0” O.C. Structural Track Support Housing Assembly Bolted to Struct. H.S.S. Outriggers ¾” Laminated, Operable Glass Sunscreen System W/ Decorative Frit Pattern Applied to Panels. Panel System to be Mech. Operable Using Sun Tracking Sensors to Automatically Operate Shades in Conjunction W/ The South & Western Sun Throughout the Day

B

HSS 6*8*3/8” Outriggers @ 8’ 0” O.C. Glazed Sunscreen Wall Support – Anchor 3/8” STL. Base PL. Into Edge of Conc. Slab W/ Drilled and Epoxide Anchor Bolts C.I.P Concrete Column W/ Flared Mushroom Pedestal Cap 1” Clear Tempered Glazing System W/Alum. Frame @ Head & Sill Recessed into Conc. Slab & Butt Glazed Condition at Jambs W/ Silicone Infill ¾” Clear Tempered Glass Guardrails W/ Alum. Cap and S.S. Anchor Bolts W/ Standoffs Fastening Panels into Conc. Slab Edge. Drill and Epoxy S.S. Guardrail Anchors into Slab Edge

D 3” Decorative Conc. Topping W/Polished Surface and Fragments of Glass for Aggregate – Slope DN. 2%From Envelope to Slab Edge Reinf. CMU Wall W/ 3 5/8” Mtl. Studs @ 24” O.C. and Interior Wall Finish Decorative Linear Wood Slat Suspended Clng. W/ Alum. Runner Grid Suspension System – Provide Radiused Profile at Column Caps Weathered Copper Rain Screen Wall Panels Mech. Fastened @ 16” O.C. Each Way. W/ S.S. Fastens Into 7/8” Mtl. Hat Furring Strips Located @ 16” O.C. Vert. Over Waterproof Membrane Over 3 5/8” Mtl. ‘2’ Furring Channels @ 16” O.C. Waterproof Membrane W/ Drainage Mat over 3” Rigid Insulation W/ Cover Board over Reinf. CMU Wall over 3 5/8” Mtl Wall Furring for Int. Wall Finish Crushed Stone Drainage Fill Raised Floor System for Underfloor Air Distribution over 6” Reinf. Conc. Slab over 20 ml. Vapor Barrier over 3” Rigid Slab Insulation over Crushed Stone Base over Compacted Earth Dashed Lines Indicate Pier Cap Beyond Conc. Grade Beam Btwn. Pier Caps Reinf. Conc. Drilled Foundation Piers

16


Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.