Spring 2018 Excellence By Design Newsletter

Page 10

PROJECT PROFILES VENTILATION MODIFICATIONS ON-SITE CONSTRUCTION ASSISTANCE Technical and design services to support the construction of a paint and coatings manufacturer’s Building Basement HVAC renovation project following previous design engineering services for the renovation.

GRAFTON CORRECTIONAL INSTITUTION HOT WATER BOILER UPGRADE Piping and electrical drawings and specifications to update and upgrade the boilers for the Ohio Department of Rehabilitation and Corrections’ Grafton facility.

ACRYLO STORAGE TANKS UNLOADING PUMPING SYSTEM REPLACEMENT Detailed engineering and specifications for purchase and installation of a pump, piping, instruments, and other equipment as necessary to provide increased capacity and a general upgrade in

10 | SPRING 2018


Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.