FBS Hub&Terrace - Programming Requirements

9.1 Programming of PIR & PC sensor

A. The PIR1 sensors should work together to decide all the recessed down light in the double height area if they should be on or off. As long as only one of the get the signal of people occupancy, they should turn on the light. But the output of each group should be controlled separately. The same logic applies to PIR3.

Advertisement

B. The PIR 4 sensors should work rogether and keep all the WW2 lights in the same condition.

C.The PIR2 signal should be able to be overrided by Local Switch.

D. The PIR5 sensors are all working along with EnOcean one light system.

9.2 Programming of Control Panels

A. The P2 lights will have localized remote touch dim panel to set a target illuminance of that table area.

B. The RGB light on four vaiours wall should be able to be controlled separately by RGB remote 4 channel panels.

C. The SP1 and SP2 groups on a same track should be controlled by two different dimmable switches, which may need more acceessoies which are not mentioned.

9.3 Programming of Exterior Views

A. The Exterior view are created by EX1/EX2, which should be controlled with the overall building facades control channel, and to intergrated into DALI system, the conversion between DMX to DALI is required.