Work sample_Qi Shan_2014

Page 1

QI SHAN Work Sample: Compact selection of Architecture Columbia University University of Colorado Denver China Central Academy of Fine Arts

M.S. Advanced Architectural Design Master of Architecture Bachelor of Architecture


COMPETITION FOR WHO NEW BUILDING IN GENEVA OFFICE BUILDING Teammate: Pablo Castro, Samuel Zumsteg, Catherine, Lee OBRA Architects, Oct 09 2014 New York, United States


CO N C OU RS D E PRO J ET PO UR L’ EXT E NS ION DU S IEGE DE L’OMS A GENEVE 2

4

We feel that, to respect the existing WHO building, the new intervention should not mimic its architectural approach, but complement it. The new office building, mostly a long and low bar suspended above the land over small structures containing meeting functions, possesses the appearance and relationship to the site of the existing building, while at the same time it articulates and organizes the project’s landscape component which is at the moment vague and undefined. Its two long facades are in effect two vierendeel beams that allow its bridgelike structural behavior.

5 1

11

9

The new building connects to the existing one in four points, on the East end of it at level +0m so the new Restaurant and Reception Hall can easily be accessed from the original building, also on the East side at level +3m so the existing offices can connect to the new offices and at level +26.6m to allow easy access from the Director’s Office to the SHOC suite. Besides a parking connection, one last link on the West side of the site connects the existing building to the new Modular Conference Room, located in our proposal underground near the existing Assembly Hall to preserve the gravitational arrangement of the original functional scheme. The other two suites of Meeting Rooms proposed in the program are distributed along the office bar, supporting it and separating it from the landscape that runs under the new building without interruption. The Meeting Room suites, largely glazed to bring in the atmosphere of the surrounding nature, are one surrounded by park and one surrounded by water. A large reflecting pool is introduced following on the intentions of the original design, and also to provide a large horizontal mirror that can bring the sky into the rooms of the building while preserving the emptiness of the space around them. The new underground parking is located below the reflecting pool. The more public spaces of the proposal are located on a low-lying two-story building to the east of the site. It can be entered near the existing main entry under a steel tower supporting the suite of SHOC spaces up in the air near the seventh floor of the existing building to give the director easy access to it. Designed this way the SHOC functions not only as a Health Emergency Management Center but also as a canopy and billboard.

7 6 8

10

LEG END 1 2 3 4 5 6 7 8 9 10 11

SITE PLAN MAIN BUILDIN G MAIN ENTRAN C E RAMP TO NEW BU ILD IN G ENTRANCE TO N EW BU ILD IN G SHO C RO O M O FFICE RESTAURAN T & R EC EPTION TERRACE MEETING ROOM MO DULAR MEETIN G R OOM O UTDO O R PAR KIN G

Both the new Restaurant and the Reception Hall are doublelevel spaces that, entered from the second floor, are accessed through a choice of stairs, elevators, or ramps, means that can, when desired, potentially dramatize an entry for the sake of protocol and pomp. Both spaces are located at the level of the reflecting pond seven meters below entry level; this dramatizes the views from these spaces (of nature, the existing building and the sky). The Reception Hall is equipped with a platform that extends onto the water and the Restaurant, a roofed terrace for dining al fresco. Abundant natural light is emitted into the building by a long ETFE skylight that extends through its entire length. A running track surrounding the skylight contributes to the fitness and health of the employees of the WHO, while historically relating the building to the work of other Swiss architects of note.

9

N

SITE PLAN

PRO POPULO

Our proposal for the new building of the World Health Organization contemplates a building as a body, one made of well-designed organs with clear and distinct individual roles that are organically related to each other, to the existing building, and to the site. These organs are deliberately disposed on the landscape to embody precise ways of occupying the land and also to give it a form that is recognizable.

3

0

10

20

1) underground sphere with cenital light; 2) open to a courtyard with a hill; and 3) island. Arranged as interconnected floors, the office bar has the plan scale of an office building and the sections the scale of a house. It is organized into 17 modules containing a mix of the proposed functions for the project allowing great flexibility of team organization. The section of the building, interconnecting floors in the manner of Frank Lloyd Wright’s Larkin Building, will propitiate teamwork and human interaction. Because of its low height, the new building would have little impact on the views from the existing structure, whose workers would be able to look past over and below it at the landscape and new reflecting pool.

The office building bar, similar to the original project, serves to articulate the site, in this case into three different areas: a large flooded triangular canal, a dining terrace for the restaurant and a rectangular planted courtyard with a small hill containing the modular meeting rooms as if the earth was pregnant or the seed of a giant tree were just about to sprout. Divided into three groups evenly localized throughout the project, the Conference Room suites are distinguished from each other by their relationship to the landscape:

50M

1:1000

The narrow section of all parts of the building combined with sufficient operable windows will provide abundant natural light and ventilation, making it inexpensive to operate and increasing work efficiency through quality of life. The heating and cooling systems could be powered by geothermal pumps and all skylight glass could be photovoltaic fret glass to both reduce glare and heat gain by radiation and to generate electricity. Except for the exposed steel tower supporting the SHOC pavilion over the entry, the entire building will be built in exposed cast-in-place reinforced white concrete.

SITE SEC T I ON W - E 1:1000

LE GE N D S H OC S U I TE P LA N S MA I N C R I S I S R OOM R E S TI N G A R E A C A FE ME E TI N G R OOM B A TH R OOM C OFFE E A R E A P R I N T / S TOR A GE OFFI C E

1 2 3 4 5 6 7 8

18

1

ME ZZA N I N E ME E TI N G R OOM S H OW E R S C ON TR OL R OOM TE C H N I C A L R OOM D A TA P R OC E S S I N G R OOM C LOA K R OOM OP E N TO B E LOW LI N E OF TR U S S B E LOW

9 10 11 12 13 14 15 16

15

2 3

15 13

12

4

14

4

11

15

5 6 8 8 8 8

10

4

1

5 6 8 8 8

9

5 6

3

15

16

7 8 8

2

5 6 -6.00

SHOC SUITE PLANS 1: 500

+0.00

7

8

12

-1.00

12 12

4 12

1

2

9

11

16

-6.00

23

0

5

10

25M

STR EET L EVEL P L AN 1:500

1 19

19 2 21

21

6

20

19

12

5

19

6

12 12

21

13

12

1 5

9

7

2

8

6

9 10

11

1 7

4

7

8

1 2 3 4 5 6 7 8

1

3

2

9

6

12 1

13

17

5

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

SECTI ON SI NGL E ROOM DI RECTOR OPEN OFFI CE TOI L ETS PRI NT ROOM STORAGE L OUNGE I T ROOM JAI NT ROOM PARKI NG ENTRANCE L OBBY TECHNI CAL ROOM KI TCHEN RECEPTI ON ROOM RUNNI NG TRACK

2

9

6

11

4

6

CONFERENCE ROOM

12

2

1

9

12

9 7

8

12

1

5

4

5

14

TOILETS

1

2

SINGLE ROOMS

1

10

MEETING / ARCH / PRINT

QUIET ROOMS

12 2

1

EAST BUILDING SECTION

JANITOR

12

TOILETS

1: 500

DIRECTOR

SINGLE ROOMS

12

6 3

15

QUIET ROOMS

OPEN OFFICE 7 8

1: 500

OFFI C E B A R S I N GLE R OOM QU I E T R OOM ME E TI N G R OOM LOU N GE D I R E C TOR OP E N OFFI C E ARCHIVE PRINT TOI LE T J A N I TOR IT OP E N TO B E LOW OPEN OFFICE

12

3 6

1

3

12

8

2

1

1 2 3 4 5 6 7 8 9 10 11 12

12 7

STREET LEVEL PLAN

LE GE N D 2

1 3

1

3

2

9 10

3 5

6 1 2

2

2 1

1:500

S TR E ET L E V E L P L A N LOU N G E V E S TIB UL E 8 TOI LE T S OP E N T O L O B B Y C LOAK RO O M OP E N T O E X HIB IT IO N A RE A A U D I O - V IS UA L OP E N T O RE S T A URA NT

6

14 23

L EGEND

3

3

MEETING / ARCH / PRINT JANITOR

4 1

4 DIRECTOR

OFFICE BAR LOWER LEVEL / MID LEVEL / UPPER LEVEL 1:500

3 5

3

4

7

9

4

4 8

9

5

4

5

7

5 11 12

6

O F F I C E B A R C R O S S & L O N G I T U D I N A L S E CT I O N S 1:500

-3.00

LE GE N D

3

1 15

4 9

-1.00

8

2

21

22

3

8

3

5 6

-6. 00

2

12

4 7

3

4 6

PO O L LEVEL PLAN STO RAG E TECHNICAL R OOM STAFF AREA TO ILETS FO YER BAR FO YER KITCHEN RECEPTIO N H ALL BAR RESTAURAN T TERRACE MEETING ROOM MO TO RIZED PAR TITION MO DULAR MEETIN G R OOM LO G G IA SERVING LO BBY CO NNECTION TO PAR KIN G INTERPRETATION R OOM MAIN CO NTROL R OOM O PEN TO BELOW CO NNECTION TO EXISTIN G BUIDLING RAMP TO CON FER EN C E RO O M

1

7

3 5 6

10

LEG END

9

6

-6.00

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

11 4

-6.00

10

13


ARCHIPELAGO AS DEVICE CONTESTS PRIVATIZATION PERFORMANCE CENTER Individual Work Columbia University, 2013 Istanbul, Turkey


The contestation is about public space privatization in Istanbul and Cairo, How to use the prototype as archipelago to injecting different artifacts in both Istanbul and Cairo in order to ask the question of contestation. In Istanbul, by identifying several events took places in Bosphorous, specially focused on the field of Galata port. Because of the force of government and municipality, the field will be closed to public. By studying how ephemeral event as cruise ships offloading in Galata port, trying to shifting the event to performance center in order to re-open the field both to residents and visitors.


DN DN

UP

DN UP

DN

UP

ARCHIPELAGO AS DEVICE CONTESTS PRIVATIZATION HOTEL/ SHOEMAKING WORKSHOP Individual Work Columbia University, 2013 Cairo, Egypt


In Cairo, we studied how the programs took places on street in order to control the space. Specifically focused on the Al Azhar Park, which was originally an outside place from Cairo now becomes a park which closes to public. By shifting the existing program on both side of park, the Darb al-Ahmar community will have a private hotel; equally the Al Azhar Park side will have a shoe-making workshop for the residents. By exchanging the program in both sides, the park will re-open to the residents in Darb al-Ahmar community.


Architecture without Content return to the center of the city and investigate the potential of these enormous buildings as data center if they would be located on Roosevelt Island; formerly the outskirts of Manhattan, today the very center of New York. Roosevelt Island has a latent potential for symbolic representation, as was recently exemplified by the posthumous execution of Kahn’s Roosevelt memorial and the numerous paper projects that preceded that monument. Architecture without content reconnects to Venturi’s concept of a difficult whole. The diffcult whole is not a group form, not a mere collection of elements, but a formal strategy that seeks for a cohesive compostion of parts through inflection.

ARCHITECTURE WITHOUT CONTENT DATA CENTER Teammate: Fernando Ceña Martínez Columbia University, 2013 New York, United States



Section

Started from the theory of Victor Shklovsky “Art as Device�, used paintings and video as heuristic device to discuss the movement and formation in architecture. Billboard architecture had contradiction between inside and outside, the sequences walking into the architecture become a narrative in alphabet city.

PANDORA, PANDORA, PANDORA FLEA MARKET Individual Work Columbia University, 2013 New York, United States


Level 1

A story about destination- I passed by a billboard architecture, a glow of light attracted me. It was a flea market. Walked into the market along the light, perceptive people’s different activities in each level, of course I wanted to see it clearly. I saw a symmetrical image like an immortal commemorate; saw people whispering under the shadow and light. Then I walked to an exterior, an ambiguous boundary between inside and outside. Along the staircase came to the third floor, a transmigration shaped plan, the invisible power guide me to the center of the building; through the pilothouse of cruise ship like glass I saw people’s activities was segmented by the geometry…Last staircase was narrow, I finally came to a small market like Barkhor Street in Tibet, they were surrounded by the wall but still could see the sky. Finally arrived the destination, the last vendor was selling the forgetful perception and sensation.


1

2

Conceptual Idea of the Residential Building

The site is on the 17th and Blake Street, Denver. The function of the building is for residential and commercial, after studied of the existing building decided to follow the traditional buildings in this area.

First, developed two masses, then avoided two courtyard in the middle of two masses, on the second floor, add balcony on the top of courtyards, make different height of each masses, thus, have three different vertical space of this building

LODO MIXED USE BUILDING RESIDENTIAL BUILDING Teammate: Jonah Rogin University of Colorado Denver, 2011 Dever, United States


This project is based on the study of traditional Chinese architecture in Jiangsu Province, used local materials such as grey brick and tile, associated with traditional Jiangsu culture.

NIYUAN VILLAGE ELEMENTARY SCHOOL SCHOOL Individual Work University of Colorado Denver, 2012 Jiangsu, China


Sturctual Analysis of Each Building in the Resort

Base on the consideration of the site, the initial idea is to create a traditional local organic architecture by minimal cost. This architecture can be part of the environment, at the same time; it can combine the local ethnologic character and contemporary technology.

QINGLONG TEMPLE AREA PLAN AND DESIGN RESORT Individual Work China Central Academy of Fine Arts, 2010 Sichuan, China


URBAN WOMEN SHELTER HOME SHELTER Individual Work University of Colorado Denver, 2010 Dever, United States

3D Analysis of Shelter

Construction Detail


The site is located in the Southwest of Guatemala. The people in Chiquirines are in extreme poverty and the town is in need of revitalization. The population doubles every 5 years. It is expected to reach 10,000 people in 2020. With the population and economic growth, proposing a healthy community design and sustainable town development strategy.For the community housing design, there is a “comminidad” housing settlement pattern with close families living adjacent to each other. The house prototype will be constructed with local materials such as bamboo, compressed earth block, and stones.

Housing Type

MULTIFAMILY HOUSING

WATER TOWER

COURTYARD COMMUNITY SPACE POWER STATION

SHOP

LAUNDRY

Proposal for Overall Community

SUSTAINABLE COMMUNITY DESIGN IN CHIQUIRINES COMMUNITY DEVELOPMENT Teammate: Kevin Xu University of Colorado Denver, 2012 Chiquirines, Guatemala

BALCONY LIVESTOCK


05-06YEAR COURTYARD OF CAFA REDESIGN

06-07YEAR BAR STREET DESIGN- CHINESE TRADITIONAL WOOD BUILDING

05-06YEAR COURTYARD OF CAFA REDESIGN

HAND MODELS China Central Academy of Fine Arts, 2005-08

07-08 CONSTRUCTION CLASS MODEL

07-08 ARTS AREA 798 REPLANNING

06-07YEAR CITY VILLA IN BEIJING


In the winter of 2011-2012, I worked as a volunteer in Long Way Home in Guatemala. For the better education of children in Guatemala, I helped local people to design and built one of the buildings in Maya Technique School, we used low cost material follow the earth bag structure to build architecture related with local culture. I also designed and finished a door of an existing building.

DESIGN BUILD IN GUATEMALA December 2011-January 2012, Help to design and build a security office of Maya Technique School, Design and made a door of an existing building in Maya Technique School in Comalapa, Guatemala


That night at Shangri-La.2011 Oil on canvas, 24 x 18”

Let Me Understand this Feeling. 2011 Oil on canvas, 12 x 16”

At This Moment. 2012 Oil on canvas, 30 x 24”


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.