Ghana Highlights 2020

Page 1

GHANA HIGHLIGHTS 2020


1


10 YEARS


QGMI GROUP: TRANSFORMING LIVES FOR 10 YEARS

QGMI completes 10 years of operations in Ghana. In just

one decade, it has played an important role in the country’s infrastructure sector. It has become one of the largest partners of Ghana’s population in the improvement of transport and connectivity. More than that: it attains its role of transforming the lives of thousands of people.

We aim to maintain a very close relationship with the

population of Ghana and we want to reiterate how fundamental they are, being our main users, in the achievement of such excellent results and in the solidification of our brand in the region.

QGMI is also based on a human resources structure with

a high average of permanence. There is a significant number of employees and partners who started and maintained their professional career with us since our arrival, always focusing on the local workforce.

Thus, we are ready to implement all kinds of basic

infrastructure in urban areas, as well as the rehabilitation of the more remote areas throughout the country. QGMI executes in a significant part of the Ghanaian infrastructure network with regard to roads, airports, urban Interchanges as well as the drainage of rainwater and flow of domestic effluents.


IN ITS OPERATIONS, THE QGMI GROUP HAS REAPED GOOD RESULTS. THE MAIN MILESTONES DURING THESE 10 YEARS: 4

3

2 More than eight projects

More than ten financial institutions including

We have received 12 awards, including

successfully delivered on time and with accurate performances.

banks, ECAs and development institutions have participated in the financing of the

‘Business Excellence’ (2019) and ‘Outstanding Infrastructure Company of the Year’ (2020).

QGMI Group’s projects in Ghana.

5

6

8

We have created more than

We have brought new technologies

We have established more than 100

2,000 direct job positions for Ghanaians in our projects.

to projects delivered in the country, including the use of metallic structured

partnerships with local companies from the most diverse sectors (from catering providers

bridges in major flyover projects.

to subcontractor partners), stimulating the local business environment of Ghana.

There are plenty of reasons to celebrate these 10 years and in order to commemorate the performance of a decade of

operations and to, once again, honor the population of Ghana, we inaugurated phase 1 of the Obtesebi Lamptey flyover last November.

Also in this year, we were assigned three new mobility projects and one sanitation project to further strengthen our enduring

partnership.

2020 was a year of greater importance in the growth and development of the QGMI group in the region. We have substantially

increased our production and expanded into the important Ivory Coast market to serve and participate in the development and autonomy of West Africa.

With the full conviction that this is only the beginning of this lasting partnership and with the ambition to do more and better,

QGMI's management is proud of their first decade of praise.


8


1 2 3 4 5

GHANA BACKGROUND AND TRACK RECORD IN THE COUNTRY

ONGOING PROJECTS

6

SUSTAINABILITY

7

SOCIAL RESPONSIBILITY

8

PARTNERSHIP

9

IVORY COAST

AWARDED PROJECTS

PROJECTS IN PIPELINE

AWARDS


BACKGROUND

THE REPUBLIC OF GHANA HAS BEEN PUTTING ITS BEST EFFORTS INTO BOOSTING INFRASTRUCTURE INVESTMENT AND THE OVERALL DEVELOPMENT OF THE COUNTRY OVER THE LAST FEW YEARS. AS ONE OF THE GROWING ECONOMIES OF SUBSAHARAN AFRICA, GHANA HAS FOCUSED ON THE CONTINUING IMPROVEMENT OF ITS MAIN INFRASTRUCTURE WATER,

GAPS: POWER,

INFORMATION

AND

TRANSPORT,

TECHNOLOGY.

IN

ADDITION, OTHER KEY DRIVERS HAVE SUPPORTED THE COUNTRY’S DEVELOPMENTAL AGENDA, SUCH AS THE ATTENTION TO OIL PRODUCTION, REFORM PROGRAMMES

AND POLITICAL STABILITY. THE

COUNTRY HAS BEEN ABLE TO SUCCESSFULLY SHOWCASE POLITICAL

ITS AND

POTENTIAL

POPULAR

INFRASTRUCTURE NEEDS.

10

AND

WILL

TO

HAS

THE

ADDRESS


Over the last few years, the QGMI group has faced the privileged position of being among the top quality contractors identified by the country for strategic works. Consequently, clients have benefited from our Group’s resources, track record and expertise on the development of optimised solutions in road networks, bridges and vital connections, airport development, drainage and sewage works. This partnership has resulted in different EPFC* contracts that involved all different phases from design, planning, equipment procurement, financing through to the construction of projects. The QGMI Group arrived in Ghana in 2010, after five years’

presence

in

Angola,

completing

successful

motorways, buildings and urbanisation projects in five different provinces of the country. With the commitment to planning, designing, supervising and constructing all different kinds of infrastructure needed by Ghana and, after demonstrating its technical capability, experience and safeguarding financial stability, the Group signed its first Memorandum of Understanding (MOU) with the Ministry of Roads & Highways, which contained relevant projects for the improvement and development of the country’s road network and transportation facilities. EPFC* - Engineering, Procurement, Financing and Construction

11


This collaboration has allowed the QGMI Group to provide effective custom-fit solutions to meet the country’s needs. Since its arrival in Ghana, more than eight contracts have been awarded and successfully studied, implemented and finally delivered to the Ministry of Roads & Highways and the Ministry of Transport (now the Ministry of Aviation), including the iconic project ‘Kwame Nkrumah Interchange and Ring Road Flyover’. The contracts for these projects have respected applicable public procurement procedures and laws and were validated by compliance assessments from the international financial agents that supported each project. Other recent projects undertaken by the QGMI Group in partnership with Ghana include contracts awarded for periodic maintenance works on selected streets, drainage networks and the also the construction of an airport in the northern of Ghana, a large-scale project that has recently begun. The QGMI Group has a special interest and dedication in contributing to the development of Ghana, in line with its motto of being a partner for the future, which is undeniable. In addition, the ground knowledge, creation of networks and experience obtained with years of a fruitful relationship in the country place the Group in a competitive position and allow new challenges and responsibilities to be taken on, with the same commitment to quality and trust.

12


BUSINESS MODEL

IN ITS HISTORY IN GHANA, THE QGMI GROUP HAS SUCCESSFULLY DELIVERED COMPLEX

PROJECTS

IN

GHANA

ON

TIME, A RESULT OF EXPERIENCE AND EFFICIENCY IN THE IMPLEMENTATION OF ITS BUSINESS MODEL. OUR COMPANY IS DEDICATED TO DELIVERING PROJECTS TO MEET CLIENTS’ EXPECTATIONS AND HAS

THE

CAPACITY

TO

IMPLEMENT

HIGHLY COMPLEX EPFC PROJECTS, BEING RESPONSIBLE FOR ALL ACTIVITIES FROM DESIGN, PROCUREMENT, CONSTRUCTION, TO COMMISSIONING AND HANDOVER OF PROJECTS TO END-USERS OR OWNERS, OFFERING

HIGH-QUALITY

STANDARDS

COMPLIANT WITH THE MOST STRINGENT HEALTH, SAFETY AND ENVIRONMENTAL REQUIREMENTS.

13


14


BUSINESS MODEL

Having

dedicated

engineering,

design

and

procurement teams, together with our track record of completed projects, has allowed us to develop close relationships with several major players in all project areas and industries, including top class designers, subcontractors and state-of-the-art technology suppliers. In addition, we are specialised in mobilising/ arranging financing and cost-effective project funding from different sources (commercial banks, export credit agencies, multilateral institutions and debt capital markets), even for projects of a complex nature, due to our risk management capability,

business

intelligence

and

reliable

partners. We have supported the Government of Ghana to raise attractive and competitive mediumto long-term funding for eight different projects using different financial structures.

It is the QGMI Group´s intention to harness all the tools and resources available to us to ensure that we deliver our projects with even greater reliability and efficiency, taking client satisfaction to the next level. We will continue to work on construction and infrastructure development along with financing, guided by a policy of (i) enforcing the acquisition of local goods and services, (ii) hiring local labour forces, (ii) transferring knowledge and technology throughout training and career programmes, (iv) complying with local laws and regulations, environmental concerns, (v) committing to sustainable development, and (vi) honouring contractual terms and conditions. The QGMI Group has been given a privileged position of being among the top contractors in the country and will work hard to keep growing roots that will lead this partnership with the Republic of Ghana to be maintained and developed.

15


MEMORABLE HIGHLIGHTS

First Memorandum of Understanding for the development of flyovers to contribute to the road network system.

2010

2011

QGMI Group arrived in Ghana after 5 years in Angola. This move was part of an important decision to expand African business.

OCTOBER 2012 Kwame Nkrumah Circle contract signed.

Ring Road, Tamale Airport runway and Streets of Tamale opening, thus solidifying our commitment to Ghana. The first two projects received important prizes for construction projects.

SEPTEMBER 2016

AUG-NOV 2016

Streets of Tamale contract signed.

Bolgatanga Road contract signed.

Tamale Airport Terminal contract signed.

Streets of Accra and Kasoa Interchange opening.

MAR-JUN 2016

OCTOBER 2016 Obetsebi Lamptey Interchange contract signed.

16

MARCH 2016

OCTOBER 2018


Ring Road, Tamale Airport runway and Streets of Tamale opening solidified our commitment to Ghana. The first two projects received important prizes for construction.

MARCH 2013

Kasoa Flyover, Ring Road Flyover and Streets of Accra contracts signed.

AUGUST 2014

OCTOBER 2014

Development of projects in energy sector.

After delivery, Kwame Nkrumah Project was awarded the award ‘Iconic Project of the Year’ at the Ghana Construction Award.

AUGUST 2015

Streets of Tema contract signed.

JULY 2015

FEBRUARY 2015

Nima Drain contract signed.

Obetsebi II, Streets of Tamale II, Streets of Accra II, Nima Drain II contracts signed.

JUL-AUG 2019 Beginning of works in Obetsebi Lamptey and Tamale Airport.

APRIL 2020

QGMI Group’s arrival in Ivory Coast.

NOVEMBER 2020

CURRENTLY

Obetsebi Lamptey Phase I opening.

17


KWAME NKRUMAH CIRCLE AND RING ROAD FLYOVER 18


TRACK RECORD RATIONALE

PROJECTS OVERVIEW

The Kwame Nkrumah and Ring Road Flyover projects sought a solution for the chaotic traffic conditions at this local point of Accra´s urban network. It is located in the heart of the city of Accra next to Obetsebi Lamptey Circle, following Ring Road West. It is a key intersection in the arterial road network of the capital, the busiest and most congested city in the country.

KEY FEATURES • The Kwame Nkrumah Flyover consists of the construction of a main flyover of 339 m long and 9 m wide, widening bridges and renovating the surrounding roads; • The Ring Road Flyover project includes construction of a flyover of 927 m long and 24 m wide that crosses above the Kwame Nkrumah Flyover and the Odawa River, connecting the eastern and western parts of the Greater Accra Region.

TRANSACTION STRUCTURE

PROJECT IMPACT

• • • •

• Integration of urban infrastructure by connecting the Western Corridor System; • Mitigation of existing perennial flooding that affects the population, improving health and traffic.

Source of Funds: Private Banks; Financing: Commercial Loan; Other: yield enhancement; Progress to date: 100% (November 2016).

ACCRA 19


TAMALE INTERNATIONAL AIRPORT RUNWAY 20


TRACK RECORD

PROJECTS OVERVIEW

RATIONALE Tamale Airport serves the northern region of Ghana. It is the third-largest airport in the country but has not been adapted for international flights. The government of Ghana (GoG) and Ghana Airports have decided to upgrade Tamale Airport to develop Tamale as an alternative to the country’s primary airport, Kotoka International Airport in Accra, as a base for hajj (pilgrimage) traffic to Mecca and as a regional hub in West Africa.

KEY FEATURES • • • • • •

A runway extension by 962 m x 60 m to Code 4E, extending the full-strength operational pavement to 3,400 m in total; Rehabilitation of the existing runway pavement; A new link taxiway; A new single apron on the western side of the runway; A new positive drainage system to the runway; New AGL and associated equipment.

TRANSACTION STRUCTURE

PROJECT IMPACT

• Source of Funds: Private Banks / Government of Ghana; • Financing: Commercial Loan; • Other: yield enhancement; • Progress to date: 100% (August 2016).

• The GoG wanted to use this project to support the programme of the Savannah Accelerated Development Authority (SADA) and employ Tamale Airport as a base for the seasonal hajj (pilgrimage) flights between Ghana and Mecca in Saudi Arabia. • Tamale will be used as a sub-Saharan hub airport for flights to neighbouring and West African countries.

TAMALE 21


KASOA FLYOVER 22


TRACK RECORD

PROJECTS OVERVIEW

RATIONALE Within the city of Kasoa, in the central region of Ghana, the heart of the project includes 3 interchanges spanning a section of the national route N1 and its associated road networks. The N1 is part of the trans-African motorway system linking Lagos (Nigeria) to Coutonou (Benin), Lomé (Togo), Accra (Ghana) and Abidjan (Ivory Coast). The project aims to reduce travel time on the N1 and to provide adequate linkages on the northern and southern sides of the motorway, addressing traffic congestion issues and guaranteeing safety.

KEY FEATURES • Three interchanges and associated roads focused over a 6.5 km stretch of the N1 motorway; • Ancillary works component includes the construction of 20 km of related road networks, 30 km of the Kasoa-Amasaman Road.

TRANSACTION STRUCTURE

PROJECT IMPACT

• • • •

• Contribution to creating a new corridor that will channel traffic movements of the Accra south-eastern sectors; • Improvement of the capacity of the road system at the junction and minimises the effects of traffic congestion; • Social contribution to the community.

Source of Funds: Private Banks; Financing: ECA Backed Facility + Commercial Loan; Other: yield enhancement; Progress to date: 100% (June 2017).

KASOA 23


GHANA RESURFACE PROGRAMME 24


TRACK RECORD RATIONALE

PROJECTS OVERVIEW

Due to traffic flow, some of the main streets of three important cities (Accra, Tema and Tamale) have been degraded and the Ministry of Roads & Highways, acting through the Department of Urban Roads, has developed a solution to resurface the main areas, allowing the city road network to function properly.

KEY FEATURES • STREETS OF ACCRA: around 40 km of roads have been updated in Kanda (north and south), Adabraka, Madina, Adenta and Mamprobi; • STREETS OF TEMA: around 90 km of roads rehabilitated in: Ningo – Prampram, LA areas and Thesie Nungua; • STREETS OF TAMALE: around 24 km of roads rehabilitated in Kamina Barracks (military zone), Barwah Barracks (military zone – Tamale Airport) and Teysec (main hospital road).

TRANSACTION STRUCTURE

PROJECT IMPACT

• Source of Funds: Private Banks / Government of Ghana (Public Budget); • Financing: Commercial Loan; • Progress to date: Streets of Accra: 100% (March 2017) Streets of Tamale: 100% (December 2016) / Streets of Tema: 100% (March 2018).

• Enhancement of traffic flow efficiency in the three cities; • Improvement of safety by offering drivers skid resistance and better visibility; • Environmental contribution (since asphalt is a recyclable material and helps to reduce waste).

TAMALE ACCRA TEMA 25


NIMA DRAIN

26


TRACK RECORD

PROJECTS OVERVIEW

RATIONALE Mamobi, a low-income and heavily populated community, has for many years experienced regular floods, mostly resulting in the loss of lives and properties and the disruption of economic activities. The Nima drain takes its source from the western part of the city and runs through the airport city, Mamobi, Nima and Assylum, then finally channels into the Odaw stream at Circle, near Hawkers’ Market. The remaining stretch through Mamobi remains unimproved. Poor management of storm runoff and waste in the community has destroyed a significant part of its ecosystem in addition to slowing development.

KEY FEATURES • Stormwater management in the community involved the construction of a 1.2 km rectangular box drain measuring 5 m wide by 2.5 m deep and stretches from Obassanjo Highway, close to Kaokudi Junction, to the culvert on Mamobi Highway. It is one of the largest drains in Accra.

TRANSACTION STRUCTURE

PROJECT IMPACT

• Source of Funds: Government of Ghana (Public budget); • Progress to date: 100% (October 2017).

• Mitigation of perennial flooding improves environmental and sanitary conditions and alleviates property damage and health risks in the Nima-Mamobi community; • Enhancement of solid waste collection; • Social and health improvements with no open areas, while the area above the drain can be used for social activities.

ACCRA 27


OBETSEBI LAMPTEY INTERCHANGE PHASE I 28


TRACK RECORD

PROJECTS OVERVIEW

RATIONALE Obetsebi Lamptey Circle is a key intersection in the arterial road network at the heart of Accra. It is part of the Ring Road system and is located at the intersection of 4 major arterials: Ring Road; Mortuary Road, linking the Korle-bu Teaching Hospital, which is Ghana’s main referral hospital; Graphic Road towards the Accra Central Business District; and Winneba-Cape Coast-Takoradi Road. The location where the proposed interchange was constructed was one of the major bottlenecks in the Ring Road network. Its upgrade will enhance city connections by linking radial arteries with Ring Road and the N1.

KEY FEATURES • • • •

Construction of an approximately 170 m flyover from Ring Road East to Ring Road West above Obetsebi Lamptey Interchange; Access ramps (MSE walls); Ground level improvement; Landscaping.

TRANSACTION STRUCTURE

PROJECT IMPACT

• Source of Funds: Private Banks; • Financing: ECA Backed Facility + Commercial Loan; • Progress to date: 100% (November 2020).

• Direct improvement access from east to west and vice versa around Obetsebi Lamptey and facilitated north-to-south movements; • Amelioration of west-side access to Kaneshie Market; • Traffic relief at the roundabout, improving ground level movements; • Support for storm drainage systems around the construction catchment area.

ACCRA 29



1 2 3 4 5

GHANA BACKGROUND AND TRACK RECORD IN THE COUNTRY

ONGOING PROJECTS

6

SUSTAINABILITY

7

SOCIAL RESPONSIBILITY

8

PARTNERSHIP

9

IVORY COAST

AWARDED PROJECTS

PROJECTS IN PIPELINE

AWARDS


TAMALE INTERNATIONAL AIRPORT TERMINAL 32


ONGOING PROJECTS RATIONALE

PROJECTS OVERVIEW

After upgrading Tamale Airport to the international level with the extension of the runway, as a second phase of the overall initiative to invest in the airport, QGMI was appointed to build a new terminal and all ancillary facilities for airport operation.

KEY FEATURES • • • • • • •

Terminal building with approximately 5000 m2 and able to be expanded; Airport management system and equipment for integrated passenger and baggage processing; Multi-purpose hajj facility; Car parking; Access and local roads; Landside and airside infrastructure adapted to the terminal size; Necessary water, power and sewerage infrastructure operations.

TRANSACTION STRUCTURE

PROJECT IMPACT

• Source of Funds: Private Banks; • Financing: ECA Backed Facility + Commercial Loan; • Progress to date: 48% (December 2020).

• Development promotion in the north will contribute to the integration of a country that is divided in terms of income equality; • The construction of a new completely international airport is not only economically strategic but also aims to enable an equitable distribution.

TAMALE 33


BOLGATANGAPULIMAKON ROAD 34


ONGOING PROJECTS RATIONALE

PROJECTS OVERVIEW

This road runs through 7 districts and a total of 9 constituencies and is a primary way to link Ghana to Togo and Burkina Faso. The road will connect the capital town of the Upper East Region, Bolgatanga, to other towns in the region, as well as to the neighbouring countries. It will consequently ease the movement of commuters long the stretch of the road.

KEY FEATURES • Total length of 110 km of dual-carriage roads in Bolgatanga; • Three main bridges: one over the Kola River, one over the Red Volta and another over the White Volta; • A bypass connecting Azoka Senior High School to the Pusiga Road and to another bypass in Bawku (the main town after Bolgatanga).

TRANSACTION STRUCTURE

PROJECT IMPACT

• Source of Funds: Government of Ghana (Public Budget); • Progress to date: 33% (December 2020).

• Road rehabilitation to international standards will reduce travel duration by least half, significantly improving trade among the border countries due to faster, cheaper transportation.

BOLGATANGA 35



1 2 3 4 5

GHANA BACKGROUND AND TRACK RECORD IN THE COUNTRY

ONGOING PROJECTS

6

SUSTAINABILITY

7

SOCIAL RESPONSIBILITY

8

PARTNERSHIP

9

IVORY COAST

AWARDED PROJECTS

PROJECTS IN PIPELINE

AWARDS


AWARDED PROJECTS

STREETS OF ACCRA – PHASE II

OBETSEBI LAMPTEY INTERCHANGE – PHASE II

SPONSOR: Ministry of Roads and Highways (Department of Urban Roads)

SPONSOR: Ministry of Roads and Highways (Department of

SCOPE OF WORKS

Urban Roads)

Rehabilitation of 120 km of selected streets in Accra.

SCOPE OF WORKS Second-Tier Interchange of approximately 400 m length (north-south), access road and drainage works. 38


NIMA DRAIN – PHASE II

STREETS OF TAMALE – PHASE II

SPONSOR: Ministry of Works and Housing (Department of Hidrology)

SPONSOR: Ministry of Roads and Highways

SCOPE OF WORKS • Rehabilitation of final Nima Drain Phase II (3000 m) extending to the Odaw River;

SCOPE OF WORKS Rehabilitation of 100 km of selected streets :

• Landscaping and creation of public spaces throughout the section of the channel with areas for outdoor activity;

• 40 km in Tamale • 10 km in Wale/Wale; • 10 km in Nalerigu; • 10 km in Gambaga; • 15 km in Damongo; • 15 km in Yendi. 39



1 2 3 4 5

GHANA BACKGROUND AND TRACK RECORD IN THE COUNTRY

ONGOING PROJECTS

6

SUSTAINABILITY

7

SOCIAL RESPONSIBILITY

8

PARTNERSHIP

9

IVORY COAST

AWARDED PROJECTS

PROJECTS IN PIPELINE

AWARDS


PROJECTS IN PIPELINE

GHANA

SCENIC ROUTE – MAMFE-KOFORIDUA • Sponsor: Ministry of Roads and Highways

STREETS OF SUNYANI • Sponsor: Department of Urban Roads • Ministry of Roads and Highways GHANA

42


SENEGAL

ZIGUINCHOR BRIDGE • Sponsor: Ministry of Infrastructure, Land Transport and Connectivity

NORTHERN BRIDGES • Sponsor: Ghana Highways Authority • Ministry of Roads and Highways GHANA

43



1 2 3 4 5

GHANA BACKGROUND AND TRACK RECORD IN THE COUNTRY

ONGOING PROJECTS

6

SUSTAINABILITY

7

SOCIAL RESPONSIBILITY

8

PARTNERSHIP

9

IVORY COAST

AWARDED PROJECTS

PROJECTS IN PIPELINE

AWARDS


AWARDS

2014

2015

2016

2018

2019

2020

THE BEST INFRASTRUCTURE COMPANY FOR THE KWAME NKRUMAH CIRCLE INTERCHANGE DESIGN

FOREIGN CONSTRUCTION COMPANY

INFRASTRUCTURE COMPANY OF THE YEAR

CONSTRUCTION COMPANY OF THE YEAR FOR WEST AFRICA

WEST AFRICA BUSINESS EXCELLENCE AWARDS - OUTSTANDING INFRASTRUCTURE COMPANY

OUTSTANDING INFRASTRUCTURE COMPANY OF THE YEAR

Ghana Constructions Awards

Ghana Constructions Awards

Business Executive Magazine

West Africa Business Excellence Awards

West Africa Business Excellence Awards

Ghana Business Standard Awards

CIVIL PROJECT FOR THE TAMALE AIRPORT EXPANSION

CIVIL ENGINEERING PROJECT FOR KWAME NKRUMAH CIRCLE AND RING ROAD FLYOVER

ACCOUNTING AND FINANCE TEAM OF THE YEAR CONSTRUCTION

Ghana Constructions Awards

Ghana Constructions Awards

Ghana Accountancy & Finance Awards

THE ICONIC PROJECT FOR KWAME NKRUMAH CIRCLE

OUTSTANDING PROJECT FOR KWAME NKRUMAH CIRCLE AND RING ROAD FLYOVER

Ghana Properties Awards

Ghana Constructions Awards

CONSTRUCTION COMPANY OF THE YEAR

Ghana Constructions Awards

46


IN

THE

ANALYSIS

OF

THOSE

AWARDS,

CRITERIA SUCH AS IMAGE AND REPUTATION, CONTRIBUTION TO THE COUNTRY’S ECONOMIC DEVELOPMENT AND THE POTENTIAL FOR EXPANSION OF THE COMPANY’S CAPACITY WERE CONSIDERED, AMONG OTHER FACTORS. THE QGMI GROUP MET AND STILL MEETS ALL THE REQUIREMENTS, REFLECTED IN ITS KNOW-HOW, COMMITMENT AND DEDICATION TO EACH WORK PROJECT CARRIED OUT IN THE COUNTRY, CONTRIBUTING TO THE DEVELOPMENT AND QUALITY OF LIFE OF THE POPULATION OF GHANA. WITH ALL THESE ACHIEVEMENTS, THE QGMI GROUP REMAINS ON TRACK, LEAVING ITS IMPRINT IN A COUNTRY THAT DEALS WITH EMBLEMATIC

PROJECTS,

WORKING

TO

ACHIEVE GREATNESS.

47



1 2 3 4 5

GHANA BACKGROUND AND TRACK RECORD IN THE COUNTRY

ONGOING PROJECTS

6

SUSTAINABILITY

7

SOCIAL RESPONSIBILITY

8

PARTNERSHIP

9

IVORY COAST

AWARDED PROJECTS

PROJECTS IN PIPELINE

AWARDS


SUSTAINABILITY

SUSTAINABLE BUSINESS APPROACH SUSTAINABILITY IS CONSIDERED THE FOUNDATION OF OUR BUSINESS AND IS REFLECTED IN OUR MISSION TO PROMOTE THE DEVELOPMENT AND FINANCING OF SUSTAINABLE INFRASTRUCTURE AND SERVICES IN GHANA. THUS, IT IS INGRAINED IN OUR OPERATIONS. THE INTEGRATION OF ENVIRONMENTAL, SOCIAL, AND GOVERNANCE ASPECTS INTO OUR POLICIES, BUSINESS MODEL AND DECISION-MAKING PROCESSES ADDS LONG-TERM VALUE TO THE COMPANY’S SHAREHOLDERS AS WELL AS ITS STAKEHOLDERS. QGMI GROUP APPLIES A HOLISTIC APPROACH, INTEGRATING THE CONCEPT INTO OUR CORE BUSINESS STRATEGY SO WE CAN BETTER IDENTIFY NEW GROWTH OPPORTUNITIES WHILE REDUCING OUR EXPOSURE TO LEGAL, RESOURCERELATED, AND SOCIO-POLITICAL RISKS.

50

RISK MANAGEMENT Sustainability limits financial and reputational risks

OPPORTUNITY Sustainability creates business opportunities

Economic Aspects Business perpetuation by delivering cost effective projects and optimised solutions

Environmental Aspects Conservation of natural resources, efficient use of resources, implementation of actions to minimise environmental impact and working with transparency Social Aspects Social responsibility, protect, respect and remedy to human rights and combating poverty

TRANSPARENCY Sustainability strengthens credibility and reputation

Reputational Aspects And Compliance Indetification of reputational risks, Compliance, continuous improvement of corporate governance, ethics and transparency.


LONG-TERM ENGAGEMENT WITH OUR STAKEHOLDERS GENERATING LONG-TERM VALUE.

Sustainability is not a new concept for QGMI Group; our company has long embraced a sustainable approach to doing business. What is new is our enhanced focus, new strategy, dedication of resources to manage assets, and commitment, both internally and externally, to operating sustainably. We recognise that we are on a journey to further integrate environmental, social, governance, and economic factors into our decision-making process.

51


INTERNATIONAL BEST PRACTICES GUIDELINES

52


SUSTAINABILITY

We follow the recommendations of the Organisation for Economic Cooperation and Development (OECD) in export financing on socio-environmental issues.

We apply the World Bank Group’s environment, health and safety guidelines (EHS Guidelines).

We recognise the sustainability structure of the IFC (International Finance Corporation) by demonstrating our commitment to sustainable development.

In the projects, we adopted socio-environmental criteria disseminated worldwide by financial institutions. These are referenced in the IFC’s Social and Environmental Sustainability Performance Standards.

53



1 2 3 4 5

GHANA BACKGROUND AND TRACK RECORD IN THE COUNTRY

ONGOING PROJECTS

6

SUSTAINABILITY

7

SOCIAL RESPONSIBILITY

8

PARTNERSHIP

9

IVORY COAST

AWARDED PROJECTS

PROJECTS IN PIPELINE

AWARDS


SOCIAL RESPONSIBILITY

SOCIALLY SUSTAINABLE PERFORMANCES In our endeavours, we promote the development of the areas where we work by training and recruiting local labour, valuing and developing suppliers and their potential, and thereby creating new opportunities. We aim to create value for our stakeholders through establishing participation and developing strategies to create opportunities for local people, mitigating impacts to community health and safety, and building two-way communication channels. Further, QGMI Group is committed to respectful interaction and positive contribution to the communities in Ghana by actively engaging with them. Each year, we carefully select a relevant cause to which we dedicate our attention and efforts. In 2020, our social sustainability journey began with our commitment to women’s health. We believe our actions can help improve women’s lives and generate a positive overall impact on people and communities. We have centred our social initiatives on activities of health promotion through breast cancer awareness in Ghana. Throughout 2020, we implemented a project in Tamale that reflected the purpose of going the extra mile to further women’s well-being. 56


OUR JOINT EFFORTS AGAINST THE COVID-19 PANDEMIC

Worldwide lives in an unprecedented period of time due

to the crisis, spread, and restrictions caused by the Covid-19 pandemic. During these uncertain times, the vital priority of QGMI is to ensure the safety and health of all our employees, partners, and society. While continuing our activity during this crisis with our usual high level of commitment, we comply strictly with the instructions put into force by the public authorities of Ghana and the World Health Organisation.

While conducting our operations, we make sure that

on-site teams operate safely and the spread of the Covid-19 pandemic is under control. In order to do so, the high measures in a working environment that we take to protect our teams are as follows: hourly cleaning, disinfection, availability of personal protective equipment, temperature checking, screening, signage, and testing of our employees, and many more. Furthermore, we have rescheduled internal and external events for virtual attendance and when necessary and possibly postponed or canceled the same.

Despite such restrictions caused by the pandemic,

QGMI has made its best efforts to continue contributing to the society and the economy owing to our distinctive strengths and to our employees who involve their work dedicatedly. Therefore, we take this opportunity to thank our employees and all the key workers across the country. 57



1 2 3 4 5

GHANA BACKGROUND AND TRACK RECORD IN THE COUNTRY

ONGOING PROJECTS

6

SUSTAINABILITY

7

SOCIAL RESPONSIBILITY

8

PARTNERSHIP

9

IVORY COAST

AWARDED PROJECTS

PROJECTS IN PIPELINE

AWARDS


PARTNERSHIP

60


QGMI AND GHANA 10 YEARS OF PARTERNSHIP

1

2

3

4

5

Projects with a strong

Approximately 2,000

Engagement to bring

Commitment to principles

Approximately 100

positive impact on the

job opportunities

the top technologies

of social responsibility

partnership agreements

social and economic

were created for the

available to our projects,

and environmental

with local companies

conditions of the country,

local labour force,

with best-practice

sustainability and

from most diverse sector

such as improvement

contributing to income

application and a spirit

projects strictly obeying

from catering providers

of infrastructure and

distribution and

of cooperation to share

Environmental Protection

to subcontractor partners

transportation;

poverty reduction;

knowledge and

Agency rules and

stimulating to the business

know-how;

international assessment

environment of Ghana.

regulations;

61



1 2 3 4 5

GHANA BACKGROUND AND TRACK RECORD IN THE COUNTRY

ONGOING PROJECTS

6

SUSTAINABILITY

7

SOCIAL RESPONSIBILITY

8

PARTNERSHIP

9

IVORY COAST

AWARDED PROJECTS

PROJECTS IN PIPELINE

AWARDS


IVORY COAST

AS ONE OF THE WORLD’S FASTEST-GROWING

QGMI Group is aware that better access

ECONOMIES AND THE GLOBE’S LEADING

to clean water, sanitation services and

PRODUCER

water management creates tremendous

AND

EXPORTER

OF

CACAO

BEANS AND CASHEW NUTS, THE IVOIRIAN GOVERNMENT HAS BEEN PUTTING ITS BEST EFFORTS INTO RAISING INFRASTRUCTURE INVESTMENT AND DEVELOPMENT IN THE COUNTRY OVER THE LAST FEW YEARS. THE

FRANCOPHONE

WEST

opportunity

for

the

population,

such

as improved access to basic water and sanitation services leading to improved health, averted health care costs and time saved. Good management of water resources

brings

more

certainty

and

AFRICAN

efficiency in productivity across economic

ECONOMIC HUB HAS FOCUSED ON THE

sectors and contributes to the health of the

CONTINUING IMPROVEMENT OF THE MAIN

ecosystem.

INFRASTRUCTURE VOIDS, AND ONE OF ITS TOP PRIORITIES IS MAKING WATER A PART

Taken together, these interventions lead to

OF ITS ECONOMIC DEVELOPMENT.

immediate and long-term economic, social, and

INVESTING IN WATER MANAGEMENT AND SANITATION

64

SERVICES

IS

ABSOLUTELY

environmental

benefits

that

make

a difference in the lives of thousands of people. With this in mind, we have defined our establishment strategy in the Ivory Coast

ESSENTIAL TO ERADICATE POVERTY AND

by combining popular will, government

ENABLE SUSTAINED ECONOMIC GROWTH.

priorities and the United Nations’ Sustainable

THE GOVERNMENT WISHES TO SEE THE RATE

Development Goals (SDGs) to meet social

OF ACCESS TO DRINKING WATER INCREASE

and economic demands by having “water”

SOON BY ACHIEVING UNIVERSAL ACCESS TO

as the priority starting point for projects to

DRINKING WATER BY 2030.

be studied in the country.


GOAL

STRATEGIC CONTEXT Global Sustainable Development Goals

Accordance with local regulations and International Practices National Development Plan of Ivory Coast

Presidential Program

PRIORITY PROJECT

Stable Partnerships| Construction, Operation and Financing Economic Sustainability

• Ensure availability and sustainable management of water and sanitation for all. • SDG 6 is closely linked with all other SDGs.

Positive Socioeconomic Impacts

Attention to the needs of local communities

65


IVORY COAST

The QGMI Group arrives in Ivory Coast after a successful decade of legacy and partnership in Ghana. After demonstrating our technical capability, experience and long-term commitment, the Group recently signed its first contract with the Ministry of Construction, Housing & Urbanism to develop 5 wastewater treatment plants and a pumping station, part of an important presidential programme. Enabling the community to access a clean water supply and sanitation systems takes priority over other water-use purposes as it brings a multitude of economic and social benefits.

AWARDED CONTRACT WASTEWATER MANAGEMENT PLANT

SPONSOR : Ministry of Construction, Since the beginning, our commitment to sustainable practices has been at the core of our business. All our processes, project studies, employees and business partners are aligned with our engagement to sustainability across infrastructure development, long-term value and well-being for our stakeholders. We look forward to this next chapter.

Housing and Urbanism

SCOPE OF WORKS Construction of 5 wastewater treatment plants and a pumping station in the Abidjan district.

66


67