FDOT Tentative Work Program 2016-2020

Page 1

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1

TENTATIVE WORK PROGRAM REPORT

DRAFT

July 1, 2015 Through June 30, 2020

POLK COUNTY

Tentative Work Program Fiscal Years 2016 - 2020 FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1

PHASE CODES

ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities

Run Date: 11/24/2014

Page: 1

SnapShot Date: 11/12/2014


FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1

TENTATIVE WORK PROGRAM REPORT

DRAFT

July 1, 2015 Through June 30, 2020

POLK COUNTY

MISSION STATEMENT The Department will provide a safe, interconnected statewide transportation system for Florida's citizens and visitors that ensures the mobility of people and goods, while enhancing economic prosperity and sustaining the quality of our environment.

Robin Stublen Communications Specialist District One Headquarters 801 North Broadway P.O. Box 1249 Bartow, FL 33831 (863) 519-2362

Debbie Tower Communications Director Southwest Area Office 10041 Daniels Parkway Fort Myers, FL 33913 (239) 461-4300

PHASE CODES

ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities

Run Date: 11/24/2014

Page: 2

SnapShot Date: 11/12/2014


FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1

TENTATIVE WORK PROGRAM REPORT

DRAFT

July 1, 2015 Through June 30, 2020 CURRENTLY REPORTED ACTIVE FUND CODES ACSU BRRP CIGP CM DDR DI DIH DITS DPTO DS DU DWS FAA FTA FTAT HSP LF LFP PKYI PKYR PL RHH SA SL SU TRIP ACBZ ACNP ACTU NHRE TALT TALU

PHASE CODES

POLK COUNTY

Advance Construction (SU) State Bridge Repair And Rehab County Incentive Grant Program Congestion Mitigation – ACQ District Dedicated Revenue State-Statewide Inter/Intrastate Highway State In-house Product Support Statewide ITS - State 100% State PTO State Primary Highways and PTO State Primary/Federal Reimbursement Weigh Stations - State 100% Federal Aviation Administration Federal Transit Administration FHWA Transfer to FTA (non-bud) Highway Safety Program Local Funds Local Fund for Participating Tpk Improvement Tpk Maintenance Reserve Metro Plan (85% FA; 15% other) Rail-Highway Xings – Hazard STP, Any Area STP, Areas < 200k STP, Urban Areas > 200k Trans Regional Incentive Prog Advance Construction BRTZ Advance Construction NHPP Advance Construction TALU NAT HWY Perform ­ Resurfacing Transportation ALTS­ ANY AREA Transportation ALTS­ >200K

ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities

Run Date: 11/14/2014

Page: 3

SnapShot Date: 11/12/2014


DRAFT

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1 TENTATIVE WORK PROGRAM REPORT July 1, 2015 Through June 30, 2020

POLK COUNTY

HIGHWAYS FPN: Desc:

4136441

Project/Location: AUBURNDALE TRAFFIC SIGNALS REIMBURSEMENT

TRAFFIC SIGNALS

Project Length:

0.820

Begin Mile Post:

10.690

End Mile Post:

11.510

Phase

Fund

OPS

DDR

2015/16

$25,536

2016/17

$26,303

2017/18

$27,092

2018/19

$27,904

2019/20

$28,741

Project Total:

$25,536

$26,303

$27,092

$27,904

$28,741

Comments: FPN:

4328091

Desc:

RAIL SAFETY PROJECT

Project Length:

Project/Location: BAKER ST FROM N VAN FLEET DR TO BRITTS LANE-XING #624503-T 0.201

Begin Mile Post:

0.000

End Mile Post:

0.201

Phase

Fund

2015/16

RRU

RHH

$270,600

Project Total:

$270,600

2016/17

2017/18

2018/19

2019/20

2016/17

2017/18

2018/19

2019/20

2018/19

2019/20

Comments: FPN: Desc:

4367951

Project/Location: BARTOW ADAPTIVE DBOM US 98 FROM MANOR DR TO US 17

ATMS - ARTERIAL TRAFFIC MGMT

Project Length:

1.111

Begin Mile Post:

1.194

End Mile Post:

1.994

Comments:

Phase

Fund

PE

DI

$75,000

DSB

DI

$793,046

DSB

DIH

$25,675

OPS

DI

Project Total: FPN:

4313521

Desc:

NEW ROAD CONSTRUCTION

Project Length:

Project/Location: BARTOW NORTHERN CONNECTOR PHASE II FROM US 17 TO SR 60 2.000

Begin Mile Post:

2.062

End Mile Post:

4.062

Comments:

FPN: Desc:

4136451

Project/Location: BARTOW TRAFFIC SIGNALS REIMBURSEMENT

TRAFFIC SIGNALS

Project Length:

1.002

Begin Mile Post:

16.896

End Mile Post:

17.898

2015/16

$893,721 2015/16

$109,334

$109,334

$109,334

$109,334

Phase

Fund

CST

CIGP

$467,864

CST

LFP

$9,819,995

CST

TRIP

$2,998,420

Project Total:

$13,286,279 2015/16

2016/17

2016/17

2017/18

Phase

Fund

OPS

DDR

$36,480

$37,575

2017/18

$38,702

2018/19

$39,863

2019/20

$41,059

Project Total:

$36,480

$37,575

$38,702

$39,863

$41,059

Comments: FPN:

4332571

Desc:

BIKE PATH/TRAIL

Project Length:

Project/Location: BELLA VISTA FROM MLK JR AVE TO LAKE PARKER DRIVE 0.000

Begin Mile Post:

0.000

End Mile Post:

0.000

Phase

Fund

2015/16

LAR

ACTU

$320,287

Project Total:

$320,287

2016/17

2017/18

2018/19

2019/20

Comments:

PHASE CODES

ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities

Run Date: 11/24/2014

Page: 4

SnapShot Date: 11/12/2014


DRAFT

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1 TENTATIVE WORK PROGRAM REPORT July 1, 2015 Through June 30, 2020 FPN: Desc:

4345081

Project/Location: BOMBER ROAD AT SPRUCE ROAD AND GERBER ROAD

INTERSECTION IMPROVEMENT

Project Length:

1.000

Begin Mile Post:

0.000

End Mile Post:

1.000

Comments:

Phase

Fund

ENV

SA

CST

HSP

CST

SA

Project Total: FPN: Desc:

4351071

Project/Location: BRUNNELL PARKWAY FROM MEMORIAL BLVD TO TENTH STREET

SIDEWALK

Project Length:

0.556

Begin Mile Post:

0.844

End Mile Post:

1.400

Phase

Fund

CST

SU

2015/16 $10,000

POLK COUNTY 2016/17

2017/18

2018/19

2019/20

2017/18

2018/19

2019/20

2017/18

2018/19

2019/20

$20,000

$661,193 $10,530 $10,000 2015/16

$691,723 2016/17 $151,090

Project Total:

$151,090

Comments: FPN:

4316411

Desc:

NEW ROAD CONSTRUCTION

Project Length:

Project/Location: CENTRAL POLK PWKY FROM POLK PWKY (SR 540) TO SR 35 (US 17) 7.103

Begin Mile Post:

0.000

End Mile Post:

7.103

Desc:

4316412

Project/Location: CENTRAL POLK PWKY FROM SR 35 (US 17) TO LOGISTICS PARKWAY

NEW ROAD CONSTRUCTION

Project Length:

5.794

Begin Mile Post:

7.103

End Mile Post:

12.897

4316418

Desc:

NEW ROAD CONSTRUCTION

Project Length:

Project/Location: CENTRAL POLK PWKY FROM US 17/US 92 TO I4 0.001

Begin Mile Post:

0.000

End Mile Post:

0.001

Desc:

1976204

Project/Location: CITY OF LAKELAND LEASE OF FIBER OPTIC NETWORK

TRAFFIC CONTROL DEVICES/SYSTEM

Project Length:

0.000

Begin Mile Post:

0.000

End Mile Post:

ROW

DDR

$1,966,740

$1,985,083

ROW

DIH

$151,944

$136,943

$2,118,684

$2,122,026

Phase

Fund

ROW

DDR

ROW

DIH

2015/16

2016/17

2016/17

2017/18

Phase

Fund

PE

DDR

PE

DIH

0.000

Phase

Fund

OPS

SL

Project Total:

2018/19

$4,611,162

2015/16

2016/17

2019/20

$3,479,790

$506,479

$456,479

$5,117,641

$3,936,269

2017/18

2018/19

2019/20

2017/18

2018/19

2019/20

$9,212,000 $110,000

Project Total:

Comments: FPN:

2015/16

Project Total:

Comments: FPN:

Fund

Project Total:

Comments: FPN:

Phase

$9,322,000 2015/16

2016/17

$20,278

$20,278

$20,278

$20,278

$20,278

$20,278

$20,278

$20,278

$20,278

$20,278

Comments: FPN:

4367891

Desc:

RAIL SAFETY PROJECT

Project Length:

Project/Location: COLEMAN RD RECKER HWY TO 26TH ST X-ING # 625397R 0.122

Begin Mile Post:

1.021

End Mile Post:

1.143

Phase

Fund

2015/16

RRU

RHH

$276,600

Project Total:

$276,600

2016/17

2017/18

2018/19

2019/20

Comments:

PHASE CODES

ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities

Run Date: 11/24/2014

Page: 5

SnapShot Date: 11/12/2014


DRAFT

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1 TENTATIVE WORK PROGRAM REPORT July 1, 2015 Through June 30, 2020 FPN: Desc:

4317721

Project/Location: COW CAMP ROAD BRIDGE NO. 160400 OVER ROSALIE/ZIPPRER CANAL

BRIDGE REPLACEMENT

Project Length:

0.001

Begin Mile Post:

0.000

End Mile Post:

0.001

2015/16

POLK COUNTY

Phase

Fund

CST

ACBZ

2016/17 $1,668,600

2017/18

2018/19

2019/20

Project Total:

$1,668,600

2016/17

2017/18

2018/19

2019/20

2016/17

2017/18

2018/19

2019/20

2016/17

2017/18

2018/19

2019/20

2016/17

2017/18

2018/19

2019/20

2016/17

2017/18

2018/19

2019/20

2017/18

2018/19

2019/20

Comments: FPN: Desc:

4367871

Project/Location: CR 542 OLD TAMPA HWY FROM GAY RD TO DOC GAY RD X-ING #624214S

RAIL SAFETY PROJECT

Project Length:

0.199

Begin Mile Post:

2.659

End Mile Post:

2.858

Phase

Fund

RRU

RHH

2015/16

$119,671

Project Total:

$119,671

Comments: FPN:

4367911

Desc:

RAIL SAFETY PROJECT

Project Length:

Project/Location: CR 542 OLD TAMPA HWY FROM GAY RD TO GAY RDX-ING #624215Y 0.034

Begin Mile Post:

2.625

End Mile Post:

2.659

Phase

Fund

2015/16

RRU

RHH

$119,671

Project Total:

$119,671

Comments: FPN: Desc:

4332721

Project/Location: CR 544 AT SR 17

INTERSECTION IMPROVEMENT

Project Length:

0.001

Begin Mile Post:

0.000

End Mile Post:

0.001

4332741

Desc:

SIDEWALK

Project Length:

Project/Location: CR 655 (RIFLE RANGEROAD) FROM 10TH STREET E TO BOMBER ROAD 0.865

Begin Mile Post:

9.645

End Mile Post:

Fund

CST

LF

$70,485

CST

SU

$1,000,182

Project Total:

Comments: FPN:

Phase

10.510

Phase

Fund

CST

SU

Project Total:

2015/16

$1,070,667 2015/16

$295,146 $295,146

Comments: FPN: Desc:

4349421

Project/Location: CREWS LAKE RD FROM LAKELAND HIGHLANDS RD TO KITTY FOX

TRAFFIC OPS IMPROVEMENT

Project Length:

2.770

Begin Mile Post:

0.000

End Mile Post:

2.770

4350691

Desc:

SIDEWALK

Project Length:

Project/Location: CRYSTAL LAKE DR FROM US 98 TO NEW JERSEY RD 0.343

Begin Mile Post:

Comments:

PHASE CODES

0.326

End Mile Post:

Fund

CST

HSP

2015/16

$1,483,046

CST

SA

$8,424

Project Total:

Comments: FPN:

Phase

0.669

Phase

Fund

CST

ACSU

CST

SU

Project Total:

$1,491,470 2015/16

2016/17

$550,159 $1,000 $551,159

ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities

Run Date: 11/24/2014

Page: 6

SnapShot Date: 11/12/2014


DRAFT

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1 TENTATIVE WORK PROGRAM REPORT July 1, 2015 Through June 30, 2020 FPN: Desc:

4350941

Project/Location: DAVENPORT COMPLETE STREET PHASE I AND PHASE II

SIDEWALK

Project Length:

0.001

Begin Mile Post:

0.000

End Mile Post:

0.001

2015/16

POLK COUNTY

Phase

Fund

PE

TALU

2016/17

2017/18

2018/19 $225,000

Project Total:

$225,000

2019/20

Comments: FPN: Desc:

4136461

Project/Location: DAVENPORT TRAFFIC SIGNALS REIMBURSEMENT

TRAFFIC SIGNALS

Project Length:

0.094

Begin Mile Post:

3.768

End Mile Post:

3.862

Phase

Fund

OPS

DDR

2015/16

$3,040

2016/17

$3,132

2017/18

$3,226

2018/19

$3,322

2019/20

$3,422

Project Total:

$3,040

$3,132

$3,226

$3,322

$3,422

Comments: FPN:

4361451

Desc:

DRAINAGE IMPROVEMENTS

Project Length:

Project/Location: DRAINAGE IMPROVEMENT CTY OF LAKE ALFRED FROM E HOFFMAN ST TO E ORANGE ST 0.199

Begin Mile Post:

15.215

End Mile Post:

15.414

Comments:

Phase

Fund

CST

DIH

$5,135

CST

DS

$374,757

CST

LF

$51,350

Project Total: FPN: Desc:

4136471

Project/Location: DUNDEE TRAFFIC SIGNALS REIMBURSEMENT

TRAFFIC SIGNALS

Project Length:

1.065

Begin Mile Post:

28.850

End Mile Post:

29.915

2015/16

2016/17

2017/18

2018/19

2019/20

2016/17

2017/18

2018/19

2019/20

$431,242

Phase

Fund

OPS

DDR

2015/16

$9,728

$10,020

$10,321

$10,631

$10,949

Project Total:

$9,728

$10,020

$10,321

$10,631

$10,949

Comments: FPN:

4136481

Desc:

TRAFFIC SIGNALS

Project Length:

Project/Location: EAGLE LAKE TRAFFIC SIGNALS REIMBURSEMENT 0.440

Begin Mile Post:

25.390

End Mile Post:

25.830

Phase

Fund

2015/16

2016/17

2017/18

2018/19

2019/20

OPS

DDR

$9,120

$9,394

$9,676

$9,966

$10,265

Project Total:

$9,120

$9,394

$9,676

$9,966

$10,265

Comments: FPN: Desc:

4332291

Project/Location: EAST LAKE HOWARD TRAIL

BIKE PATH/TRAIL

Project Length:

0.000

Begin Mile Post:

0.000

End Mile Post:

0.000

Comments: FPN:

4309181

Desc:

SIDEWALK

Project Length:

Project/Location: EASTSIDE ELEMENTARY SCHOOL SAFETY SIDEWALKS 0.000

Begin Mile Post:

0.000

End Mile Post:

0.000

Phase

Fund

CST

TALT

2015/16

$342,360

CST

TALU

$256,475

Project Total:

$598,835

Phase

Fund

2015/16

CST

TALT

$174,758

Project Total:

$174,758

2016/17

2017/18

2018/19

2019/20

2016/17

2017/18

2018/19

2019/20

Comments:

PHASE CODES

ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities

Run Date: 11/24/2014

Page: 7

SnapShot Date: 11/12/2014


DRAFT

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1 TENTATIVE WORK PROGRAM REPORT July 1, 2015 Through June 30, 2020 FPN: Desc:

4345021

Project/Location: EWELL ROAD AT LUNN RD

SKID HAZARD OVERLAY

Project Length:

5.000

Begin Mile Post:

0.000

End Mile Post:

5.000

Comments:

Phase

Fund

PE

HSP

CST

HSP

CST

SA

Project Total: FPN: Desc:

4136491

Project/Location: FROSTPROOF TRAFFIC SIGNALS REIMBURSEMENT

TRAFFIC SIGNALS

Project Length:

1.443

Begin Mile Post:

4.750

End Mile Post:

6.193

2015/16

POLK COUNTY 2016/17

2017/18

2018/19

2019/20

2017/18

2018/19

2019/20

$96,293

$463,342 $10,530 $96,293 2015/16

$473,872

Phase

Fund

OPS

DDR

$7,752

2016/17 $7,985

$8,225

$8,471

$8,725

Project Total:

$7,752

$7,985

$8,225

$8,471

$8,725

Comments: FPN:

4136501

Desc:

TRAFFIC SIGNALS

Project Length:

Project/Location: FT MEADE TRAFFIC SIGNALS REIMBURSEMENT 0.700

Begin Mile Post:

7.000

End Mile Post:

7.700

Phase

Fund

2015/16

2016/17

2017/18

2018/19

2019/20

OPS

DDR

$8,360

$8,611

$8,870

$9,136

$9,410

Project Total:

$8,360

$8,611

$8,870

$9,136

$9,410

Comments: FPN: Desc:

4136511

Project/Location: HAINES CITY TRAFFIC SIGNALS REIMBURSEMENT

TRAFFIC SIGNALS

Project Length:

1.270

Begin Mile Post:

21.500

End Mile Post:

22.770

Phase

Fund

OPS

DDR

2015/16

$38,912

2016/17

$40,080

2017/18

$41,282

2018/19

$42,521

2019/20

$43,796

Project Total:

$38,912

$40,080

$41,282

$42,521

$43,796

Comments: FPN:

4301853

Desc:

INTERCHANGE IMPROVEMENT

Project Length:

Project/Location: I-4 @ SR 33 INTERCHANGE MODIFICATION 0.650

Begin Mile Post:

12.032

End Mile Post:

Phase

12.682

Comments:

Fund

2015/16

2016/17

Desc:

2012178

Project/Location: I-4 AT CSX RAILROAD

REPLACE RAILROAD BRIDGE

Project Length:

0.004

Begin Mile Post:

4.887

End Mile Post:

4.891

2018/19

ENV

SA

ROW

DIH

$271,270

ROW

DS

$33,489

ROW

SA

2019/20

$1,300,000

$2,483,295

Project Total: FPN:

2017/18

$1,300,000

Phase

Fund

PE

ACNP

2015/16

$1,690,000

Project Total:

$1,690,000

2016/17

2017/18

$2,788,054 2018/19

2019/20

Comments:

PHASE CODES

ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities

Run Date: 11/24/2014

Page: 8

SnapShot Date: 11/12/2014


DRAFT

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1 TENTATIVE WORK PROGRAM REPORT July 1, 2015 Through June 30, 2020 FPN: Desc:

2012153

Project/Location: I-4 AT SR 557

INTERCHANGE IMPROVEMENT

Project Length:

1.610

Begin Mile Post:

21.767

End Mile Post:

22.878

Comments:

2015/16

POLK COUNTY

Phase

Fund

ENV

DI

2016/17

4273152

Desc:

ITS FREEWAY MANAGEMENT

Project Length:

Project/Location: I-4 FROM EAST OF POLK PARKWAY TO OSCEOLA COUNTY LINE

RRU

ACNP

$4,500,000

CST

ACNP

$54,664,218

CST

DIH

16.235

Begin Mile Post:

15.787

End Mile Post:

32.022

Comments:

Phase

Fund

FPN: Desc:

4328041

Project/Location: INTERLACHEN PKWY FROM FERN RD TO E GARY RD-XING# 624155-S

RAIL SAFETY PROJECT

Project Length:

0.091

Begin Mile Post:

0.168

End Mile Post:

0.259

2019/20

$508,099 $100,000 2015/16

PE

HSP

DSB

DIH

$23,621

DSB

HSP

$3,635,366

Project Total:

2018/19

$100,000

Project Total: FPN:

2017/18

$59,672,317

2016/17

2017/18

2018/19

2019/20

2016/17

2017/18

2018/19

2019/20

2016/17

2017/18

2018/19

2019/20

$75,000

$3,733,987

Phase

Fund

RRU

RHH

2015/16 $281,300

Project Total:

$281,300

Comments: FPN:

4136521

Desc:

TRAFFIC SIGNALS

Project Length:

Project/Location: LAKE ALFRED TRAFFIC SIGNALS REIMBURSEMENT 0.010

Begin Mile Post:

15.590

End Mile Post:

15.600

Phase

Fund

2015/16

OPS

DDR

$10,336

$10,647

$10,966

$11,294

$11,634

Project Total:

$10,336

$10,647

$10,966

$11,294

$11,634

Comments: FPN: Desc:

4351091

Project/Location: LAKE HOWARD DR FROM AVE D SW TO 15TH ST SW

BIKE PATH/TRAIL

Project Length:

0.001

Begin Mile Post:

0.000

End Mile Post:

0.001

Comments:

Phase

Fund

PE

LF

CST

TALT

CST

TALU

2015/16

4136531

Desc:

TRAFFIC SIGNALS

Project Length:

Project/Location: LAKE WALES TRAFFIC SIGNALS REIMBURSEMENT 1.017

Begin Mile Post:

18.968

End Mile Post:

19.985

2017/18

2018/19

2019/20

$155,000 $83,773 $344,752

Project Total: FPN:

2016/17

$155,000 2015/16

2016/17

$428,525

Phase

Fund

2017/18

2018/19

2019/20

OPS

DDR

$33,440

$34,444

$35,477

$36,541

$37,638

Project Total:

$33,440

$34,444

$35,477

$36,541

$37,638

Comments:

PHASE CODES

ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities

Run Date: 11/24/2014

Page: 9

SnapShot Date: 11/12/2014


DRAFT

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1 TENTATIVE WORK PROGRAM REPORT July 1, 2015 Through June 30, 2020 FPN: Desc:

4371071

Project/Location: LAKELAND TMC OPS FUND CITY WIDE

OTHER ITS

Project Length:

0.001

Begin Mile Post:

0.000

End Mile Post:

0.001

Phase

Fund

OPS

DS

Project Total:

2015/16

POLK COUNTY 2016/17

$159,000

$159,000

$159,000

$159,000

2017/18

2018/19

2019/20

2017/18

2018/19

2019/20

Comments: FPN: Desc:

4136541

Project/Location: LAKELAND TRAFFIC SIGNALS REIMBURSEMENT

TRAFFIC SIGNALS

Project Length:

4.770

Begin Mile Post:

23.830

End Mile Post:

28.600

Comments: FPN:

4367901

Desc:

RAIL SAFETY PROJECT

Project Length:

Project/Location: LEM CARNES RD CR 547N TO SR 600/US 17 X-ING #622960T 0.010

Begin Mile Post:

0.000

End Mile Post:

0.010

Phase

Fund

OPS

DDR

2015/16

OPS

DITS

$335,312

Project Total:

$335,312

Phase

Fund

2015/16

RRU

RHH

$270,600

Project Total:

$270,600

2016/17

$345,372

$355,733

$369,727

$380,819

$345,372

$355,733

$369,727

$380,819

2016/17

2017/18

2018/19

2019/20

2016/17

2017/18

2018/19

2019/20

2016/17

2017/18

2018/19

2019/20

2016/17

2017/18

2018/19

2019/20

Comments: FPN: Desc:

4350611

Project/Location: LINCOLN AVE SIDEWALKS

SIDEWALK

Project Length:

0.498

Begin Mile Post:

1.226

End Mile Post:

1.724

4298831

Desc:

PEDESTRIAN/WILDLIFE OVERPASS

Project Length:

Project/Location: LK ALFRED TR AT US 17/92 BRIDGE

0.100

Begin Mile Post:

14.406

End Mile Post:

Fund

CST

ACSU

CST

SU

Project Total:

Comments: FPN:

Phase

14.506

Comments:

Desc:

4136551

Project/Location: MULBERRY TRAFFIC SIGNALS REIMBURSEMENT

TRAFFIC SIGNALS

Project Length:

2.500

Begin Mile Post:

18.450

End Mile Post:

20.950

$231,540 $1,000 $232,540

Phase

Fund

ENV

TALT

CST

CM

$1,524,600

CST

DDR

$48,444

CST

SA

Project Total: FPN:

2015/16

2015/16

$50,000

$214,087 $1,837,131

Phase

Fund

OPS

DDR

2015/16

$18,240

$18,788

$19,351

$19,932

$20,530

Project Total:

$18,240

$18,788

$19,351

$19,932

$20,530

Comments:

PHASE CODES

ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities

Run Date: 11/24/2014

Page: 10

SnapShot Date: 11/12/2014


DRAFT

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1 TENTATIVE WORK PROGRAM REPORT July 1, 2015 Through June 30, 2020 FPN: Desc:

4332581

Project/Location: NEW JERSEY TRAIL FROM CRYSTAL LAKE DRIVE TO EDGEWOOD DRIVE

BIKE PATH/TRAIL

Project Length:

0.000

Begin Mile Post:

0.000

End Mile Post:

0.000

Phase

Fund

LAR

ACSU

2015/16 $269,314

Project Total:

$269,314

POLK COUNTY 2016/17

2017/18

2018/19

2019/20

2016/17

2017/18

2018/19

2019/20

2017/18

2018/19

2019/20

2017/18

2018/19

2019/20

2016/17

2017/18

2018/19

2019/20

2016/17

2017/18

2018/19

2019/20

2016/17

2017/18

2018/19

2019/20

Comments: FPN: Desc:

4332601

Project/Location: NEW YORK CYCLE TRACK (LIME STREET) FROM SIKES BLVD TO NEW YORK AVENUE

BIKE PATH/TRAIL

Project Length:

0.000

Begin Mile Post:

0.000

End Mile Post:

0.000

Comments:

Phase

Fund

PE

LF

PE

TALU

CST

TALU

2015/16

$115,307 $1,000 $532,500

Project Total: FPN:

4344891

Desc:

SIDEWALK

Project Length:

Project/Location: OLD DIXIE HIGHWAY/ SADDLE CREEK ROAD 0.500

Begin Mile Post:

0.000

End Mile Post:

0.500

Desc:

4353911

Project/Location: OLD DIXIE TRAIL FROM AUBURNDALE TO HAINES CITY

PD&E/EMO STUDY

Project Length:

0.001

Begin Mile Post:

0.000

End Mile Post:

Phase

Fund

2015/16

CST

HSP

$679,483

CST

SA

$10,530

Project Total:

Comments: FPN:

$116,307

0.001

Phase

Fund

PDE

SU

2016/17

$532,500

$690,013 2015/16

2016/17

$1,048,752

Project Total:

$1,048,752

Comments: FPN:

4367881

Desc:

RAIL SAFETY PROJECT

Project Length:

Project/Location: PAYNE ST SR 600/US92 - BLUE JAY AVE X-ING #623084U 0.001

Begin Mile Post:

0.000

End Mile Post:

0.001

Phase

Fund

2015/16

RRU

RHH

$255,600

Project Total:

$255,600

Comments: FPN: Desc:

4350461

Project/Location: POLK COUNTY SCOUR COUNTERMEASURE AT VARIOUS LOCATIONS

BRIDGE-REPAIR/REHABILITATION

Project Length:

4.484

Begin Mile Post:

25.276

End Mile Post:

25.298

4126751

Desc:

TRAFFIC SIGNALS

Project Length:

Project/Location: POLK COUNTY TRAFFICSIGNALS REIMBURSEMENT 12.175

Begin Mile Post:

Comments:

PHASE CODES

2.300

End Mile Post:

Fund

CST

BRRP

$163,791

CST

DIH

$24,488

Project Total:

Comments: FPN:

Phase

Phase

14.475

Fund

2015/16

$188,279 2015/16

OPS

DDR

OPS

DITS

$363,736

Project Total:

$363,736

$374,649

$385,888

$400,787

$412,810

$374,649

$385,888

$400,787

$412,810

ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities

Run Date: 11/24/2014

Page: 11

SnapShot Date: 11/12/2014


DRAFT

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1 TENTATIVE WORK PROGRAM REPORT July 1, 2015 Through June 30, 2020 FPN: Desc:

4125301

Project/Location: POLK TPO IDENTIFIED OPERATIONAL IMPROVEMENTS- FUNDING

TRAFFIC OPS IMPROVEMENT

Project Length:

0.000

Begin Mile Post:

0.000

End Mile Post:

0.000

Comments:

2015/16

Phase

Fund

PE

SU

$220

ROW

SU

$220

CST

SU

Project Total: FPN: Desc:

4351041

Project/Location: ROSE STREET SIDEWALKS AT VARIOUS LOCATIONS

SIDEWALK

Project Length:

0.533

Begin Mile Post:

0.144

End Mile Post:

0.677

Comments:

Phase

Fund

PE

LF

4333791

Desc:

ROUNDABOUT

Project Length:

Project/Location: SR 17 AT HUNT BROTHERS ROAD

0.296

Begin Mile Post:

17.203

End Mile Post:

17.499

2015/16

2016/17

2017/18

2018/19

2019/20

$3,059,726

$5,952,956

$4,987,260

$5,951,368

$3,059,726

$5,952,956

$4,987,260

$5,951,808

2016/17

2017/18

2018/19

2019/20

2016/17

2017/18

2018/19

2019/20

2016/17

2017/18

2018/19

2019/20

2016/17

2017/18

2018/19

2019/20

2016/17

2017/18

2018/19

2019/20

$70,000

CST

TALT

$13,542

CST

TALU

$256,576

Project Total: FPN:

POLK COUNTY

$70,000

Phase

Fund

2015/16

INC

DDR

$40,000

Project Total:

$40,000

$270,118

Comments: FPN: Desc:

4344881

Project/Location: SR 33 (LAKELAND HILLS BLVD) AT N SOCRUM LOOP RD

INTERSECTION IMPROVEMENT

Project Length:

0.206

Begin Mile Post:

3.510

End Mile Post:

3.716

Comments:

Phase

Fund

CST

DDR

4333961

Desc:

ROUNDABOUT

Project Length:

Project/Location: SR 33 AT DEEN STILL ROAD

0.285

Begin Mile Post:

19.580

End Mile Post:

19.865

$6,967

CST

DIH

$25,816

CST

HSP

$168,366

$6,318

$201,149

$6,318

Project Total: FPN:

2015/16

Phase

Fund

2015/16

INC

DDR

$32,000

Project Total:

$32,000

Comments: FPN: Desc:

4312911

Project/Location: SR 33 FROM HAYNES CIRCLE TO WITHLACOOCHEE BRIDGE

RESURFACING

Project Length:

12.535

Begin Mile Post:

Comments:

14.603

End Mile Post:

27.138

Phase

Fund

ENV

DS

CST

DDR

CST

DIH

$154,050

CST

DS

$3,602,942

Project Total:

PHASE CODES

2015/16 $50,000 $3,561,825

$7,368,817

ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities

Run Date: 11/24/2014

Page: 12

SnapShot Date: 11/12/2014


DRAFT

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1 TENTATIVE WORK PROGRAM REPORT July 1, 2015 Through June 30, 2020 FPN: Desc:

4366731

Project/Location: SR 35/700 (US 98) FROM N. OF WEST SOCRUM LOOP RD TO SR 471

PD&E/EMO STUDY

Project Length:

7.531

Begin Mile Post:

9.005

End Mile Post:

16.536

Desc:

1975624

Project/Location: SR 35/700 (US98) FROM EDGEWOOD DRIVE TO E MAIN STREET

ADD LANES & RECONSTRUCT

Project Length:

3.033

Begin Mile Post:

9.189

End Mile Post:

12.222

4312781

Desc:

RESURFACING

Project Length:

Project/Location: SR 35/SR 555/US 17 FROM BARTOW RD TO BEAR CREEK APTS 3.050

Begin Mile Post:

15.969

End Mile Post:

Fund

PDE

DIH

18.511

Comments:

$200,000

PDE

DS

$2,100,000

4345071

Desc:

INTERSECTION IMPROVEMENT

Project Length:

Project/Location: SR 37 AT LAKE HARRIS DRIVE

0.285

Begin Mile Post:

23.436

End Mile Post:

23.721

Comments:

Desc:

4349371

Project/Location: SR 37 FROM CR 630 TO CR 640 (PINECREST RD)

RESURFACING

Project Length:

7.571

Begin Mile Post:

7.386

End Mile Post:

14.957

Comments:

4366011

Desc:

RESURFACING

Project Length:

Project/Location: SR 37 FROM SR 60 TO N OF VIRGINIA ST 0.796

Begin Mile Post:

Comments:

PHASE CODES

18.209

End Mile Post:

19.005

2019/20

Fund

ROW

CM

$1,723,607

$1,723,454

ROW

SA

$1,522,651

$4,242,750

$3,246,258

$5,966,204

Phase

Fund

2015/16

2015/16

ENV

DS

$50,000

CST

DDR

$154,050

CST

DIH

$107,835

CST

SA

$5,040,708

2016/17

2017/18

2018/19

2019/20

2016/17

2017/18

2018/19

2019/20

2017/18

2018/19

2019/20

2017/18

2018/19

2019/20

$5,352,593

CST

DDR

$31,982

CST

HSP

$641,240

CST

SA

$10,530

Fund

RRU

DS

CST

DIH

CST

DS

Phase

Fund

PE

DIH

CST

SA

Project Total:

2019/20

2017/18

Fund

Phase

2018/19

2016/17

Phase

Project Total: FPN:

2018/19

$2,300,000

2015/16

Project Total: FPN:

2017/18

Phase

Project Total: FPN:

2016/17

Project Total:

Comments: FPN:

Phase

Project Total:

Comments: FPN:

2015/16

POLK COUNTY

$683,752 2015/16

2016/17

$100,000 $95,536 $6,522,511 $100,000 2015/16

$6,618,047 2016/17

$100,000 $1,818,211

$100,000

$1,818,211

ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities

Run Date: 11/24/2014

Page: 13

SnapShot Date: 11/12/2014


DRAFT

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1 TENTATIVE WORK PROGRAM REPORT July 1, 2015 Through June 30, 2020 FPN: Desc:

4106662

Project/Location: SR 542 FROM 1ST STREET TO BUCKEYE LOOP RD

ADD LANES & RECONSTRUCT

Project Length:

2.305

Begin Mile Post:

0.380

End Mile Post:

2.685

Comments:

Phase

Fund

ENV

DS

RRU

DDR

RRU

LF

ROW

SU

CST

DDR

CST

DIH

Project Total: FPN: Desc:

4106664

Project/Location: SR 542 FROM 1ST STREET TO BUCKEYE LOOP ROAD

LANDSCAPING

Project Length:

2.476

Begin Mile Post:

0.000

End Mile Post:

2.476

Desc:

4106663

Project/Location: SR 542 FROM BUCKEYE LOOP ROAD TO US 27

WIDEN/RESURFACE EXIST LANES

Project Length:

3.648

Begin Mile Post:

2.779

End Mile Post:

6.427

Desc:

4352841

Project/Location: SR 546 (MEMORIAL) FROM CHESTNUT RD E TO BRUNNELL PKWY

BIKE PATH/TRAIL

Project Length:

0.856

Begin Mile Post:

3.876

End Mile Post:

4.732

Comments:

4365691

Desc:

RIGID PAVEMENT REHABILITATION

Project Length:

Project/Location: SR 546 (US 92) FROM WABASH AVENUE TO N. INGRAHAM AVENUE 3.311

Begin Mile Post:

1.738

End Mile Post:

5.049

Comments:

Desc:

4350711

Project/Location: SR 555 (US 17) FROM AVENUE G SW TO AVENUE A SW

RESURFACING

Project Length:

0.497

Begin Mile Post:

Comments:

PHASE CODES

0.000

End Mile Post:

2018/19

0.497

2019/20

$1,000,000 $2,951,628 $5,241,467

$1,221,060 $15,736,323 $331,800

$5,281,467 2015/16

$1,421,060 2016/17

$20,019,751

Fund

DIH

$5,670

CST

DS

$234,396

2017/18

2018/19

Fund

ROW

DDR

$5,402,004

$6,810,022

ROW

DIH

$477,405

$477,405

$5,879,409

$7,287,427

2015/16

Phase

Fund

PE

DIH

CST

DIH

$15,405

CST

DS

$883,672

Phase

Fund

PE

DIH

CST

NHRE

CST

SA

Phase

Fund

CST

DDR

CST

DIH

Project Total:

2019/20

$240,066

Phase

Project Total: FPN:

2017/18

$200,000

CST

Project Total: FPN:

2016/17

Phase

Project Total:

Comments: FPN:

$40,000

Project Total:

Comments: FPN:

2015/16

POLK COUNTY

2015/16

2016/17

2017/18

2018/19

2019/20

2016/17

2017/18

2018/19

2019/20

2016/17

2017/18

2018/19

2019/20

2018/19

2019/20

$10,000

$909,077 2015/16

$10,000 $3,696,305 $4,839,609 $10,000 2015/16

$8,535,914 2016/17

2017/18

$2,084,013 $17,646 $2,101,659

ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities

Run Date: 11/24/2014

Page: 14

SnapShot Date: 11/12/2014


DRAFT

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1 TENTATIVE WORK PROGRAM REPORT July 1, 2015 Through June 30, 2020 FPN: Desc:

4350851

Project/Location: SR 563 (SIKES BLVD)FROM LIME ST TO SR 539 (MLK JR BLVD)

RIGID PAVEMENT REHABILITATION

Project Length:

0.417

Begin Mile Post:

0.006

End Mile Post:

0.423

Comments:

Phase

Fund

PE

DIH

CST

DDR

CST

DIH

2015/16

POLK COUNTY 2016/17

Desc:

4345091

Project/Location: SR 60 AT BAILEY RD

INTERSECTION IMPROVEMENT

Project Length:

0.303

Begin Mile Post:

2.848

End Mile Post:

3.151

Comments:

4312941

Desc:

RESURFACING

Project Length:

Project/Location: SR 60 FROM CR 630 TO KISSIMMEE RIVER BR 5.876

Begin Mile Post:

18.634

End Mile Post:

24.510

Comments:

$111,290 $10,000

Phase

Fund

CST

DDR

$25,300

CST

HSP

$596,354

CST

SA

2015/16

FPN: Desc:

4356061

Project/Location: SR 60 HILLSBOROUGH C/L DIESEL RD

CST

DDR

$803,563

CST

DIH

$205,400

CST

DS

$4,549,309

RESURFACING

Project Length:

5.281

Begin Mile Post:

0.000

End Mile Post:

5.281

Comments:

Fund

RRU

DS

Desc:

4349381

Project/Location: SR 600 (US 92) FROM W OF THOMPSON RD TO E OF FISH HATCHERY RD

RAIL SAFETY PROJECT

Project Length:

0.164

Begin Mile Post:

3.859

End Mile Post:

4.023

Comments:

4350751

Desc:

RESURFACING

Project Length:

Project/Location: SR 600 (US 92) FROM E OF WALKER RD TO SR 544 1.868

Begin Mile Post:

Comments:

PHASE CODES

9.236

End Mile Post:

11.104

2019/20

2015/16

2016/17

2017/18

2018/19

2019/20

2016/17

2017/18

2018/19

2019/20

2017/18

2018/19

2019/20

2017/18

2018/19

2019/20

$5,558,272 2015/16 $275,000

DDR

$3,425,710

CST

NHRE

$5,966,364

CST

SA

Phase

Fund

RRU

DS

CST

DIH

CST

DS

Project Total: FPN:

2018/19

CST

Project Total: FPN:

2017/18

$54,963

Fund

Phase

2016/17

Phase

Fund

CST

DDR

CST

DIH

Project Total:

$1,091,820

$676,617

Phase

Project Total:

2019/20

$980,530

Project Total: FPN:

2018/19

$10,000

Project Total: FPN:

2017/18

$105,300 $275,000

2015/16

$9,497,374

2016/17

$75,000 $130,536 $996,463 $75,000

2015/16

$1,126,999

2016/17

$4,626,710 $28,756 $4,655,466

ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities

Run Date: 11/24/2014

Page: 15

SnapShot Date: 11/12/2014


DRAFT

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1 TENTATIVE WORK PROGRAM REPORT July 1, 2015 Through June 30, 2020 FPN: Desc:

4350761

Project/Location: SR 600 (US 92) FROM E OF SR 544 TO W OF JERSEY RD

RESURFACING

Project Length:

0.824

Begin Mile Post:

11.104

End Mile Post:

11.928

Desc:

4366721

Project/Location: SR35/700 US 98 FROM WEST DAUGHTERY ROAD TO NORTH OF WEST SOCRUM LOOP RD

PD&E/EMO STUDY

Project Length:

3.382

Begin Mile Post:

5.623

End Mile Post:

9.005

4347621

Desc:

RIGID PAVEMENT RECONSTRUCTION

Project Length:

Project/Location: SR546 (MEMORIAL BLVD) FROM I-4 TO WABASH AVE 1.412

Begin Mile Post:

0.300

End Mile Post:

1.712

Comments:

FPN: Desc:

4350781

Project/Location: US 17 AND 544 BUS STOP IMPROVEMENTS

PUBLIC TRANSPORTATION SHELTER

Project Length:

0.000

Begin Mile Post:

0.000

End Mile Post:

0.000

Desc:

4313511

Project/Location: US 17/92 HINSON AVE FROM SR 17 (10TH STREET) TO 17TH STREET

PD&E/EMO STUDY

Project Length:

0.310

Begin Mile Post:

22.460

End Mile Post:

22.770

4313512

Desc:

ADD LANES & RECONSTRUCT

Project Length:

Project/Location: US 17/92 HINSON AVE FROM SR 17 (10TH STREET) TO 17TH STREET 0.310

Begin Mile Post:

Comments:

PHASE CODES

22.460

End Mile Post:

CST

DIH

$16,432

2015/16

2016/17

2017/18

2018/19

2019/20

2016/17

2017/18

2018/19

2019/20

$1,221,402

Phase

Fund

PDE

DIH

$150,000

PDE

SA

$1,500,000

2015/16

22.770

$1,650,000

Phase

Fund

ENV

DDR

$75,000

CST

DDR

$9,620,274

CST

DIH

$46,831

CST

DS

$1,667,620

INC

DDR

2015/16

2016/17

2017/18

2018/19

2019/20

2016/17

2017/18

2018/19

2019/20

2016/17

2017/18

2018/19

2019/20

2017/18

2018/19

2019/20

$480,000

Project Total:

$11,409,725

Phase

Fund

2015/16

CST

FTAT

$49,661

CST

SU

$49,661

$480,000

$99,322

Phase

Fund

PDE

DIH

$20,000

PDE

DS

$150,998

$800,000

$170,998

$800,000

Project Total:

Comments: FPN:

$1,204,970

Project Total:

Comments: FPN:

DDR

Project Total:

Comments: FPN:

Fund

CST

Project Total:

Comments: FPN:

Phase

POLK COUNTY

2015/16

Phase

Fund

PE

DIH

$3,000

PE

DS

$1,350,000

Project Total:

2015/16

2016/17

$1,353,000

ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities

Run Date: 11/24/2014

Page: 16

SnapShot Date: 11/12/2014


DRAFT

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1 TENTATIVE WORK PROGRAM REPORT July 1, 2015 Through June 30, 2020 FPN: Desc:

4345061

Project/Location: US 27 AT MAIN ST/CRUMP RD

LIGHTING

Project Length:

0.379

Begin Mile Post:

10.303

End Mile Post:

10.682

Comments:

Phase

Fund

PE

HSP

CST

DDR

$12,925

CST

HSP

$264,801

CST

SA

Project Total: FPN:

4192434

Desc:

ADD LANES & RECONSTRUCT

Project Length:

Project/Location: US 27 FROM PRESIDENTS DRIVE TO SR 60 5.178

Begin Mile Post:

13.638

End Mile Post:

Phase

18.816

Comments:

Fund

2015/16

POLK COUNTY 2016/17

Desc:

4312061

Project/Location: US 92 (SR 600) FROM CHURCHILL AVE TO SLOAN AVE

RESURFACING

Project Length:

2.663

Begin Mile Post:

2.469

End Mile Post:

5.132

Comments:

Desc:

4312081

Project/Location: US 92 (SR 600) FROM REYNOLDS RD TO SCHALAMAR CREEK ENT

BRIDGE REPLACEMENT

Project Length:

1.250

Begin Mile Post:

4.327

End Mile Post:

5.577

Comments:

FPN: Desc:

4335582

Project/Location: US 92 FROM COUNTY LINE ROAD TO WABASH AVENUE

ADD LANES & RECONSTRUCT

Project Length:

4.131

Begin Mile Post:

0.000

End Mile Post:

4.131

2019/20

2015/16

2017/18

2018/19

2019/20

$288,256 2016/17

ENV

DI

CST

DDR

$52,843,410

CST

DIH

$941,628

Phase

Fund

ENV

DS

$195,000

$195,000 2015/16

DS

$5,000

CST

DIH

$82,160

CST

DS

$4,326,132

$500,000

$53,785,038

2016/17

2017/18

2018/19

2019/20

2016/17

2017/18

2018/19

2019/20

2017/18

2018/19

2019/20

$4,513,292

Phase

Fund

CST

DDR

$884,467

CST

DIH

$386,374

CST

DS

$10,635,796

INC

DS

2015/16

$392,000

Project Total:

$11,906,637

Phase

Fund

2015/16

PE

SA

Project Total:

$500,000

$100,000

RRU

Project Total: FPN:

2018/19

$10,530 $64,437

Project Total: FPN:

2017/18

$64,437

$392,000 2016/17

$4,450,000 $4,450,000

Comments:

PHASE CODES

ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities

Run Date: 11/24/2014

Page: 17

SnapShot Date: 11/12/2014


DRAFT

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1 TENTATIVE WORK PROGRAM REPORT July 1, 2015 Through June 30, 2020 FPN: Desc:

4351081

Project/Location: US 92 FROM HOLIDAY MPH ENTRANCE TO N CHESTNUT RD

SIDEWALK

Project Length:

1.504

Begin Mile Post:

2.486

End Mile Post:

3.990

Comments:

Phase

Fund

PE

SU

CST

DS

CST

SU

2015/16

Desc:

4298131

Project/Location: US 92 -NEW TAMPA HWY AT WABASH AVE

INTERSECTION IMPROVEMENT

Project Length:

0.200

Begin Mile Post:

4.031

End Mile Post:

4.231

Comments:

Phase

Fund

ENV

DDR

CST

DDR

CST

DIH

Project Total: FPN:

4348862

Desc:

BRIDGE REPLACEMENT

Project Length:

Project/Location: US 98 (PEACE RIVER-FT MEADE) AT BRIDGE NO 0064 (JOHN SINGLETARY BRIDGE) 0.103

Begin Mile Post:

1.189

End Mile Post:

1.292

Desc:

4313121

Project/Location: US 98 (SR 35) FROM LAKE BONNY PARK TO MAIN STREET

RESURFACING

Project Length:

0.893

Begin Mile Post:

11.329

End Mile Post:

12.222

4353421

Desc:

PD&E/EMO STUDY

Project Length:

Project/Location: US 98 (SR35 & SR700) VIRTUAL WEIGH STATION STUDY 8.745

Begin Mile Post:

9.005

End Mile Post:

2018/19

17.750

2019/20

$45,093 $965,076 $345,000 2015/16 $10,000

2016/17

$1,010,169 2017/18

2018/19

2019/20

2018/19

2019/20

$30,000 $818,466

$1,000 $10,000 2015/16

$30,000 2016/17

$819,466

Phase

Fund

PE

DIH

$100,000

PE

SA

$2,000,000

2017/18

$2,100,000

Phase

Fund

CST

DIH

$51,350

CST

SA

$1,860,303

Project Total:

Comments: FPN:

2017/18

Project Total:

Comments: FPN:

2016/17 $345,000

Project Total: FPN:

POLK COUNTY

2015/16

2016/17

2017/18

2018/19

2019/20

2016/17

2017/18

2018/19

2019/20

2018/19

2019/20

$1,911,653

Phase

Fund

2015/16

PDE

DWS

$1,000,000

Project Total:

$1,000,000

Comments: FPN: Desc:

4313531

Project/Location: WESTGATE-CENTRAL TRAIL FROM WEST BELMAR ST TO OAKHILL STREET

BIKE PATH/TRAIL

Project Length:

0.790

Begin Mile Post:

Comments:

PHASE CODES

0.000

End Mile Post:

0.790

Phase

Fund

CST

LF

2015/16

2016/17

$182,005

CST

SU

$127,595

CST

TALT

$97,851

CST

TALU

$333,722

Project Total:

$741,173

2017/18

ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities

Run Date: 11/24/2014

Page: 18

SnapShot Date: 11/12/2014


DRAFT

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1 TENTATIVE WORK PROGRAM REPORT July 1, 2015 Through June 30, 2020 FPN: Desc:

4371081

Project/Location: WINTER HAVEN TMC OPS CITY WIDE

OTHER ITS

Project Length:

0.001

Begin Mile Post:

0.000

End Mile Post:

0.001

Phase

Fund

OPS

DS

Project Total:

2015/16

POLK COUNTY 2016/17

$43,500

$43,500

$43,500

$43,500

2017/18

2018/19

2019/20

2017/18

2018/19

2019/20

Comments: FPN: Desc:

4136561

Project/Location: WINTER HAVEN TRAFFIC SIGNALS REIMBURSEMENT

TRAFFIC SIGNALS

Project Length:

2.880

Begin Mile Post:

27.760

End Mile Post:

30.640

Phase

Fund

OPS

DDR

2015/16

$89,832

2016/17

$92,527

$95,303

$98,162

$101,107

Project Total:

$89,832

$92,527

$95,303

$98,162

$101,107

Comments:

HIGHWAYS TOTAL

PHASE CODES

2015/16

2016/17

2017/18

2018/19

$82,415,719

$54,804,203

$19,625,560

$60,639,156

2019/20

$139,956,731

ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities

Run Date: 11/24/2014

Page: 19

SnapShot Date: 11/12/2014


DRAFT

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1 TENTATIVE WORK PROGRAM REPORT July 1, 2015 Through June 30, 2020

POLK COUNTY

TRANSPORTATION PLANNING FPN:

4348551

Desc:

TRANSPORTATION PLANNING

Project Length:

Project/Location: POLK COUNTY MPO 2018/2019 UPWP

0.000

Begin Mile Post:

0.000

End Mile Post:

0.000

Phase

Fund

PLN

PL

2015/16

2016/17

2017/18

Project Total:

2018/19

2019/20

$615,778

$615,778

$615,778

$615,778

Comments: FPN: Desc:

4256691

Project/Location: POLK COUNTY MPO FY 2015/2016 UPWP

TRANSPORTATION PLANNING

Project Length:

0.000

Begin Mile Post:

0.000

End Mile Post:

0.000

Phase

Fund

PLN

PL

Project Total:

2015/16

2016/17

2017/18

2018/19

2019/20

2016/17

2017/18

2018/19

2019/20

2018/19

2019/20

$615,778 $615,778

Comments: FPN:

4318091

Desc:

TRANSPORTATION PLANNING

Project Length:

Project/Location: POLK COUNTY MPO FY 2017/2018 UPWP 0.000

Begin Mile Post:

0.000

End Mile Post:

0.000

Phase

Fund

PLN

PL

2015/16

Project Total:

$615,778

$615,778

$615,778

$615,778

Comments: 2015/16

TRANSPORTATION PLANNING TOTAL

$615,778

PHASE CODES

2016/17 $615,778

2017/18 $615,778

$615,778

$615,778

ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities

Run Date: 11/24/2014

Page: 20

SnapShot Date: 11/12/2014


DRAFT

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1 TENTATIVE WORK PROGRAM REPORT July 1, 2015 Through June 30, 2020

POLK COUNTY

TURNPIKE FPN:

4289721

Desc:

BRIDGE - PAINTING

Project Length:

Project/Location: PAINT BRIDGES - POLK PKWY(160249,160250,160251 ,160252,160253,160254) 7.400

Begin Mile Post:

0.000

End Mile Post:

5.600

Desc:

4311232

Project/Location: PAINT BRIDGES - POLK PARKWAY (160267 & 160268)

BRIDGE - PAINTING

Project Length:

0.958

Begin Mile Post:

13.568

End Mile Post:

Fund

PE

PKYR

CST

PKYR

14.526

Comments:

4365201

Desc:

RESURFACING

Project Length:

Project/Location: RESURFACE POLK PKWY, MP 0.00-8.00 & 17.2418.09 18.090

Begin Mile Post:

0.000

End Mile Post:

18.090

Fund

$1,500

CST

PKYI

$1,541

CST

PKYR

Desc:

4365202

Project/Location: THERMOPLASTIC OF POLK PKWY RESURFACING FROM MP 0.00-8.00 & 17.24-18.09

SIGNING/PAVEMENT MARKINGS

Project Length:

18.090

Begin Mile Post:

0.000

End Mile Post:

PE

PKYR

CST

PKYR

2015/16

18.090

2018/19

2019/20

2016/17

2018/19

2019/20

2018/19

2019/20

2018/19

2019/20

$1,653,771 2017/18

$200,000 $403,276

$3,041 2015/16

$200,000 2016/17

$403,276 2017/18

$566,685 $6,375,211

Project Total:

Comments: FPN:

$218,419

PKYI

Fund

2017/18 $1,653,771

PE

Phase

2016/17 $218,419

Phase

Project Total: FPN:

2015/16

Project Total:

Comments: FPN:

Phase

$566,685 2015/16

2016/17

$6,375,211

Phase

Fund

CST

PKYR

2017/18

$303,440

Project Total:

$303,440

Comments: 2015/16

TURNPIKE TOTAL

$3,041

PHASE CODES

2016/17 $985,104

2017/18 $8,432,258

2018/19

2019/20

$303,440

ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities

Run Date: 11/24/2014

Page: 21

SnapShot Date: 11/12/2014


DRAFT

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1 TENTATIVE WORK PROGRAM REPORT July 1, 2015 Through June 30, 2020

POLK COUNTY

FLP: AVIATION FPN:

4363721

Desc:

AVIATION PRESERVATION PROJECT

Project Length:

Project/Location: AIRFIELD PAVEMENT MARKINGS AT BARTOW MUNICIPAL AIRPORT 0.000

Begin Mile Post:

0.000

End Mile Post:

0.000

Desc:

4370601

Project/Location: BARTOW MINICIPAL AIRPORT CAPITAL IMPROVEMENTS

AVIATION REVENUE/OPERATIONAL

Project Length:

0.000

Begin Mile Post:

0.000

End Mile Post:

0.000

4336461

Desc:

AVIATION PRESERVATION PROJECT

Project Length:

Project/Location: BARTOW MUNICIPAL AIRPORT

0.000

Begin Mile Post:

0.000

End Mile Post:

0.000

Desc:

4348191

Project/Location: BARTOW MUNICIPAL AIRPORT CAPITAL IMPROVEMENTS

AVIATION CAPACITY PROJECT

Project Length:

0.000

Begin Mile Post:

0.000

End Mile Post:

0.000

4336371

Desc:

AVIATION REVENUE/OPERATIONAL

Project Length:

Project/Location: LAKE WALES MUNICIPAL AIRPORT

0.000

Begin Mile Post:

0.000

End Mile Post:

0.000

Desc:

4204181

Project/Location: LAKELAND LINDER REGIONAL AIRPORT CAPITAL IMPROVEMENTS

AVIATION SECURITY PROJECT

Project Length:

0.000

Begin Mile Post:

Comments:

PHASE CODES

$266,308

LF

$66,577

2018/19

2019/20

2016/17

2017/18

2018/19

2019/20

2018/19

2019/20

2018/19

2019/20

$332,885

Phase

Fund

CAP

DDR

2015/16

$600,000

$600,000

CAP

LF

$150,000

$150,000

$750,000

$750,000

Phase

Fund

2015/16

2016/17

CAP

DDR

$640,000

CAP

LF

$160,000

0.000

End Mile Post:

2017/18

$800,000

Phase

Fund

CAP

DPTO

2015/16

2016/17

$405,000

CAP

LF

$101,250

2017/18

Phase

Fund

CAP

DDR

CAP

LF

$506,250 2015/16

2016/17

0.000

2018/19

2019/20

2018/19

2019/20

$49,498 $247,491

Phase

Fund

CAP

DPTO

$300,000

CAP

LF

$75,000

Project Total:

2017/18 $197,993

Project Total:

Comments: FPN:

DPTO

CAP

2017/18

Project Total:

Comments: FPN:

CAP

2016/17

Project Total:

Comments: FPN:

2015/16

Project Total:

Comments: FPN:

Fund

Project Total:

Comments: FPN:

Phase

2015/16

2016/17

2017/18

$375,000

ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities

Run Date: 11/24/2014

Page: 22

SnapShot Date: 11/12/2014


DRAFT

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1 TENTATIVE WORK PROGRAM REPORT July 1, 2015 Through June 30, 2020 FPN: Desc:

4204231

Project/Location: LAKELAND LINDER REGIONAL AIRPORT

AVIATION SAFETY PROJECT

Project Length:

0.000

Begin Mile Post:

0.000

End Mile Post:

0.000

Desc:

4309681

Project/Location: LAKELAND LINDER REGIONAL AIRPORT CAPITAL IMPROVEMENT

AVIATION REVENUE/OPERATIONAL

Project Length:

0.000

Begin Mile Post:

0.000

End Mile Post:

Phase

Fund

CAP

DDR

0.000

Comments:

$800,000

CAP

LF

$200,000

Phase

Fund

CAP

DDR

CAP

DPTO

CAP

LF

4313701

Desc:

AVIATION SAFETY PROJECT

Project Length:

Project/Location: LAKELAND LINDER REGIONAL AIRPORT CAPITAL IMPROVEMENTS 0.000

Begin Mile Post:

0.000

End Mile Post:

0.000

Comments:

Phase

Fund

2017/18

$1,000,000 2015/16

2016/17

2017/18

2018/19

$1,192,481 2018/19

2019/20

2018/19

2019/20

$354,442

2015/16

$88,610

$85,000

$443,052

$425,000

2016/17

2017/18

CAP

DDR

$41,742

CAP

DPTO

$208,258

CAP

FAA

CAP

LF

$4,500,000 $250,000

Project Total: FPN:

4336381

Desc:

AVIATION PRESERVATION PROJECT

Project Length:

Project/Location: LAKELAND LINDER REGIONAL AIRPORT 0.000

Begin Mile Post:

0.000

End Mile Post:

Phase

0.000

Comments:

Fund

CAP

DDR

CAP

DPTO

CAP

FAA

CAP

LF

Project Total: FPN: Desc:

4362011

Project/Location: LAKELAND LINDER REGIONAL AIRPORT AIRSIDE CENTER ROOF

AVIATION PRESERVATION PROJECT

Project Length:

0.000

Begin Mile Post:

Comments:

0.000

End Mile Post:

0.000

$5,000,000 2015/16

2016/17

$5,000

2017/18

2018/19

$96,000

2019/20 $1,587,200

$32,200 $1,800,000 $1,100

$24,000

$396,800

$1,806,100

$152,200

$1,984,000

Phase

Fund

CAP

DDR

CAP

DPTO

$522,500

$522,500

CAP

LF

$522,500

$522,500

$200,000

$1,045,000

$1,045,000

$400,000

Project Total:

PHASE CODES

2019/20

$1,192,481

$340,000

Project Total: FPN:

2016/17

Project Total:

Comments: FPN:

2015/16

POLK COUNTY

2015/16

2016/17

2017/18

2018/19

2019/20

$200,000

ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities

Run Date: 11/24/2014

Page: 23

SnapShot Date: 11/12/2014


DRAFT

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1 TENTATIVE WORK PROGRAM REPORT July 1, 2015 Through June 30, 2020 FPN: Desc:

4369751

Project/Location: LAKELAND LINDER REGIONAL AIRPORT CAPITAL IMPROVEMENT

AVIATION PRESERVATION PROJECT

Project Length:

0.000

Begin Mile Post:

0.000

End Mile Post:

0.000

Comments:

Phase

Fund

CAP

DPTO

$37,500

CAP

FAA

$675,000

CAP

LF

Project Total: FPN: Desc:

4369771

Project/Location: LAKELAND LINDER REGIONAL AIRPORT CAPITAL IMPROVEMENT

AVIATION PRESERVATION PROJECT

Project Length:

0.000

Begin Mile Post:

0.000

End Mile Post:

0.000

Comments:

Phase

Fund

CAP

DPTO

CAP

FAA

CAP

LF

Project Total: FPN:

4369781

Desc:

AVIATION PRESERVATION PROJECT

Project Length:

Project/Location: LAKELAND LINDER REGIONAL AIRPORT CAPITAL IMPROVEMENT 0.000

Begin Mile Post:

0.000

End Mile Post:

0.000

Comments:

Phase

Fund

4370771

Desc:

AVIATION CAPACITY PROJECT

Project Length:

Project/Location: LAKELAND LINDER REGIONAL AIRPORT CAPITAL IMPROVEMENT 0.000

Begin Mile Post:

0.000

End Mile Post:

0.000

Desc:

4370781

Project/Location: LAKELAND LINDER REGIONAL AIRPORT CAPITAL IMPROVEMENTS

AVIATION REVENUE/OPERATIONAL

Project Length:

0.000

Begin Mile Post:

0.000

End Mile Post:

0.000

4370791

Desc:

AVIATION REVENUE/OPERATIONAL

Project Length:

Project/Location: LAKELAND LINDER REGIONAL AIRPORT CAPITAL IMPROVEMENT 0.000

Begin Mile Post:

Comments:

PHASE CODES

0.000

End Mile Post:

2019/20

2015/16

2016/17

2017/18

2018/19

2019/20

FAA

CAP

LF

2016/17

2017/18

2018/19

2019/20

$2,880,000

$160,000 $3,200,000 2015/16

$775,000 $258,333 $1,033,333

Phase

Fund

CAP

DDR

2015/16

2016/17

2017/18

$490,000

CAP

LF

$490,000

Project Total:

Comments: FPN:

2018/19

$63,750

CAP

LF

2017/18

$1,275,000

$13,410

DDR

2016/17

$1,147,500

$146,590

CAP

2019/20

$63,750

DDR

CAP

2018/19

Project Total:

Comments: FPN:

2015/16

DPTO

Fund

2017/18

$37,500

CAP

Phase

2016/17

$750,000

CAP

Project Total: FPN:

2015/16

POLK COUNTY

0.000

2018/19

$980,000

Phase

Fund

CAP

DPTO

$440,000

CAP

LF

$440,000

Project Total:

2019/20

2015/16

2016/17

2017/18

2018/19

2019/20

$880,000

ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities

Run Date: 11/24/2014

Page: 24

SnapShot Date: 11/12/2014


DRAFT

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1 TENTATIVE WORK PROGRAM REPORT July 1, 2015 Through June 30, 2020 2015/16

FLP: AVIATION TOTAL

$8,783,985

PHASE CODES

POLK COUNTY 2016/17 $2,238,052

2017/18 $3,774,691

2018/19 $4,592,064

2019/20 $6,984,000

ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities

Run Date: 11/24/2014

Page: 25

SnapShot Date: 11/12/2014


DRAFT

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1 TENTATIVE WORK PROGRAM REPORT July 1, 2015 Through June 30, 2020

POLK COUNTY

FLP: INTERMODAL FPN:

4309701

Desc:

AVIATION CAPACITY PROJECT

Project Length:

Project/Location: BARTOW MUNICIPAL AIRPORT CAPITAL IMPROVEMENTS 0.000

Begin Mile Post:

0.000

End Mile Post:

0.000

Comments:

Phase

Fund

CAP

DDR

$605,573

CAP

DPTO

$994,427

CAP

LF

Project Total: FPN: Desc:

4370591

Project/Location: BARTOW MUNICIPAL AIRPORT CAPITAL IMPROVEMENTS

AVIATION REVENUE/OPERATIONAL

Project Length:

0.000

Begin Mile Post:

0.000

End Mile Post:

0.000

4358231

Desc:

AVIATION CAPACITY PROJECT

Project Length:

Project/Location: LAKELAND LINDER REGIONAL AIRPORT FACILITY REHABILITATION 0.000

Begin Mile Post:

0.000

End Mile Post:

0.000

Desc:

4369901

Project/Location: LAKELAND LINDER REGIONAL AIRPORT CAPITAL IMPROVEMENT

AVIATION PRESERVATION PROJECT

Project Length:

0.000

Begin Mile Post:

Comments:

0.000

End Mile Post:

Fund

CAP

DPTO

CAP

LF

Phase

Fund

CAP

DDR

CAP

LF

Project Total:

Comments: FPN:

Phase

0.000

Phase

Fund

CAP

DDR

CAP

DPTO

CAP

LF

Project Total:

$400,000

$97,500 $487,500

2015/16

2017/18

2018/19

2019/20

2017/18

2018/19

2019/20

$390,000

$2,000,000

2016/17

$600,000 $600,000 $1,200,000 2015/16

2016/17

2017/18

2018/19

2019/20

2016/17

2017/18

2018/19

2019/20

$112,184 $28,046 $140,230 2015/16 $100,000

$1,140,000 $1,500,000

$1,500,000

$100,000

$1,500,000

$1,500,000

$1,140,000

$200,000

$3,000,000

$3,000,000

$2,280,000

2015/16

FLP: INTERMODAL TOTAL

$2,340,230

PHASE CODES

2016/17

Project Total:

Comments: FPN:

2015/16

2016/17 $3,487,500

2017/18 $3,000,000

2018/19 $2,280,000

2019/20 $1,200,000

ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities

Run Date: 11/24/2014

Page: 26

SnapShot Date: 11/12/2014


DRAFT

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1 TENTATIVE WORK PROGRAM REPORT July 1, 2015 Through June 30, 2020

POLK COUNTY

FLP: RAIL FPN:

4366561

Desc:

RAIL CAPACITY PROJECT

Project Length:

Project/Location: NEW YORK AVENUE PEDESTRIAN UNDERPASS 0.000

Begin Mile Post:

Comments:

0.000

End Mile Post:

0.000

Phase

Fund

2015/16

2016/17

PE

TRIP

$1,500,000

ENV

TRIP

$25,000 $30,000

2018/19

RRU

TRIP

ROW

DIH

$28,000

ROW

TRIP

$153,000

CST

DIH

$400,000

$2,036,500 2015/16

FLP: RAIL TOTAL

2019/20

$481,500

Project Total:

2016/17 $2,036,500

PHASE CODES

2017/18

$181,000 2017/18

2018/19 $181,000

$400,000 2019/20 $400,000

ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities

Run Date: 11/24/2014

Page: 27

SnapShot Date: 11/12/2014


DRAFT

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1 TENTATIVE WORK PROGRAM REPORT July 1, 2015 Through June 30, 2020

POLK COUNTY

FLP: TRANSIT FPN:

4101491

Desc:

CAPITAL FOR FIXED ROUTE

Project Length:

Project/Location: LAKELAND - LAMTD FTA 5307

0.000

Begin Mile Post:

0.000

End Mile Post:

0.000

Desc:

4101492

Project/Location: LAKELAND - LAMTD FTA SECTION 5307 OPERATING

OPERATING FOR FIXED ROUTE

Project Length:

0.000

Begin Mile Post:

0.000

End Mile Post:

0.000

4101421

Desc:

OPERATING FOR FIXED ROUTE

Project Length:

Project/Location: LAKELAND AREA MASS TRANSIT - OPERATING ASSISTANCE STATE BLOCK GRANT 0.000

Begin Mile Post:

0.000

End Mile Post:

0.000

Desc:

4140631

Project/Location: LAKELAND AREA MASS TRANSIT (LAMTD)OPERATING ASSISTANCE - CORRIDOR

URBAN CORRIDOR IMPROVEMENTS

Project Length:

0.000

Begin Mile Post:

0.000

End Mile Post:

0.000

4328381

Desc:

CAPITAL FOR FIXED ROUTE

Project Length:

Project/Location: LAKELAND AREA MASS TRANSIT DISTRICT CAPITAL IMPROVEMENT 0.000

Begin Mile Post:

0.000

End Mile Post:

0.000

Desc:

4101161

Project/Location: POLK COUNTY TPO TRANSIT PLANNING - FTA SECTION 5305 (D)

MODAL SYSTEMS PLANNING

Project Length:

$638,412

$638,412

$638,412

$638,412

$159,603

$159,603

$159,603

$159,603

$159,603

$798,015

$798,015

$798,015

$798,015

$798,015

0.000

Begin Mile Post:

Comments:

0.000

End Mile Post:

0.000

2015/16

2016/17

$1,915,235

$1,915,235

$1,915,235

$1,915,235

$1,915,235

OPS

LF

$1,915,235

$1,915,235

$1,915,235

$1,915,235

$1,915,235

$3,830,470

$3,830,470

$3,830,470

$3,830,470

$3,830,470

Fund

OPS

DPTO

$784,359

$783,999

$804,267

$830,819

OPS

LF

$784,359

$783,999

$804,267

$830,819

$872,359

$1,568,718

$1,567,998

$1,608,534

$1,661,638

$1,744,718

Fund DPTO

$452,852

$709,151

$762,481

$795,083

$818,945

OPS

LF

$452,852

$709,151

$762,481

$795,083

$818,945

$905,704

$1,418,302

$1,524,962

$1,590,166

$1,637,890

2015/16

CAP

DPTO

$50,000

CAP

LF

$12,500

2018/19

$872,359

OPS

Fund

2017/18

2019/20

Phase

Phase

2016/17

2018/19

2019/20

Phase

2015/16

2017/18

2018/19

2019/20

FTA

2016/17

2017/18

2018/19

Fund

2015/16

2016/17

2017/18

OPS

2019/20

2016/17

2017/18

2018/19

2019/20

2016/17

2017/18

2018/19

2019/20

$62,500

Phase

Fund

PLN

DPTO

$14,745

$14,745

$15,187

$15,187

$15,195

PLN

DU

$117,962

$117,962

$121,501

$121,501

$121,559

PLN

LF

Project Total:

PHASE CODES

2015/16

Phase

Project Total:

Comments: FPN:

$638,412

LF

Project Total:

Comments: FPN:

FTA

CAP

Project Total:

Comments: FPN:

CAP

Project Total:

Comments: FPN:

Fund

Project Total:

Comments: FPN:

Phase

2015/16

$14,745

$14,745

$15,187

$15,187

$15,195

$147,452

$147,452

$151,875

$151,875

$151,949

ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities

Run Date: 11/24/2014

Page: 28

SnapShot Date: 11/12/2014


DRAFT

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1 TENTATIVE WORK PROGRAM REPORT July 1, 2015 Through June 30, 2020 FPN: Desc:

4101281

Project/Location: POLK COUNTY TRANSIT OPERATING ASSISTANCE FTA SECTION 5311

OPERATING/ADMIN. ASSISTANCE

Project Length:

0.000

Begin Mile Post:

0.000

End Mile Post:

0.000

FPN: Desc:

4357711

Project/Location: POLK TRANSIT FTA SECT 5339 CAPITAL ASSIST LKLD/WH UZA

CAPITAL FOR FIXED ROUTE

Project Length:

0.000

Begin Mile Post:

0.000

End Mile Post:

0.000

4350771

Desc:

TRANSIT IMPROVEMENT

Project Length:

Project/Location: TRANSIT STOP IMPROVEMENTS @ VARIOUS LOCATIONS FTAT TRANSFER 0.000

Begin Mile Post:

0.000

End Mile Post:

0.000

Desc:

4101501

Project/Location: WINTER HAVEN AREA MASS TRANSIT FTA SECTION 5307 CAPITAL ASSISTANCE

CAPITAL FOR FIXED ROUTE

Project Length:

0.000

Begin Mile Post:

0.000

End Mile Post:

0.000

4101502

Desc:

OPERATING FOR FIXED ROUTE

Project Length:

Project/Location: WINTER HAVEN AREA MASS TRANSIT FTA SECTION 5307 OPERATING ASSISTANCE 0.000

Begin Mile Post:

0.000

End Mile Post:

0.000

Desc:

4101431

Project/Location: WINTER HAVEN AREA TRANSIT (WHAT) OPERATING STATE TRANSIT BLOCK GRANT

OPERATING FOR FIXED ROUTE

Project Length:

0.000

Begin Mile Post:

0.000

End Mile Post:

0.000

4328391

Desc:

CAPITAL FOR FIXED ROUTE

Project Length:

Project/Location: WINTER HAVEN AREA TRANSIT CAPITAL IMPROVEMENT 0.000

Begin Mile Post:

Comments:

PHASE CODES

0.000

End Mile Post:

$712,856

$712,856

$897,295

OPS

LF

$712,856

$712,856

$712,856

$712,856

$897,295

$1,425,712

$1,425,712

$1,425,712

$1,425,712

$1,794,590

0.000

2015/16

2016/17

FTA

$490,708

$490,708

$490,708

$490,708

$480,121

CAP

LF

$122,678

$122,678

$122,678

$122,678

$120,030

$613,386

$613,386

$613,386

$613,386

$600,151

2015/16

CAP

FTAT

$174,028

CAP

SU

$174,028

2018/19

2019/20

Fund

Fund

2017/18

2018/19

CAP

Phase

2016/17

2017/18

Phase

2019/20

2016/17

2017/18

2018/19

2019/20

2016/17

2017/18

2018/19

2019/20

$348,056

Phase

Fund

CAP

FTA

$500,743

$500,743

$500,743

$500,743

$515,092

CAP

LF

$125,186

$125,186

$125,186

$125,186

$128,773

$625,929

$625,929

$625,929

$625,929

$643,865

2015/16

Phase

Fund

OPS

FTA

$1,502,230

$1,502,230

$1,502,230

$1,502,230

$1,545,276

OPS

LF

$1,502,230

$1,502,230

$1,502,230

$1,502,230

$1,545,276

$3,004,460

$3,004,460

$3,004,460

$3,004,460

$3,090,552

2015/16

2015/16

2016/17

Fund

$711,773

$711,446

$729,838

$753,933

$791,629

OPS

LF

$711,773

$711,446

$729,838

$753,933

$791,629

$1,423,546

$1,422,892

$1,459,676

$1,507,866

$1,583,258

CAP

DDR

$50,000

CAP

LF

$12,500

Project Total:

2015/16

2016/17

2017/18

2018/19

2019/20

DPTO

Fund

2017/18

2018/19

OPS

Phase

2016/17

2017/18

Phase

Project Total:

Comments: FPN:

$712,856

Project Total:

Comments: FPN:

$712,856

Project Total:

Comments: FPN:

DU

Project Total:

Comments: FPN:

Fund

OPS

Project Total:

Comments: FPN:

Phase

Project Total:

Comments:

2015/16

POLK COUNTY

2018/19

2019/20

2019/20

$62,500

ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities

Run Date: 11/24/2014

Page: 29

SnapShot Date: 11/12/2014


DRAFT

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1 TENTATIVE WORK PROGRAM REPORT July 1, 2015 Through June 30, 2020 FLP: TRANSIT TOTAL

PHASE CODES

POLK COUNTY

2015/16

2016/17

2017/18

2018/19

2019/20

$14,816,448

$14,854,616

$15,043,019

$15,209,517

$15,875,458

ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities

Run Date: 11/24/2014

Page: 30

SnapShot Date: 11/12/2014


DRAFT

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1 TENTATIVE WORK PROGRAM REPORT July 1, 2015 Through June 30, 2020

POLK COUNTY

FLORIDA RAIL ENTERPRISE FPN:

4366501

Desc:

RAIL CAPACITY PROJECT

Project Length:

Project/Location: ITS IMPROVEMENT TO TRAFFIC OPERATIONS IN THE DOWNTOWN AREA 0.000

Begin Mile Post:

0.000

End Mile Post:

0.000

Comments:

FPN: Desc:

4366531

Project/Location: KENTUCKY AVENUE PEDESTRIAN OVERPASS

RAIL CAPACITY PROJECT

Project Length:

0.000

Begin Mile Post:

0.000

End Mile Post:

0.000

Comments:

Phase

Fund

PE

DIH

PE

TRIP

4365601

Desc:

RAIL CAPACITY PROJECT

Project Length:

Project/Location: RECKER HIGHWAY CONSTRUCT A BRIDGE SPANNING THE CSX RR TRACK IN POLK CO 0.000

Begin Mile Post:

0.000

End Mile Post:

0.000

Comments:

2016/17

DIH

$179,273

TRIP

$1,842,225

RRU

DPTO

$300,000

Project Total:

$350,000

Fund

PE

TRIP

ENV

DPTO

4365591

Desc:

RAIL CAPACITY PROJECT

Project Length:

Project/Location: SR60 GRADE SEPARATION OVER CSX RAILROAD 0.000

Begin Mile Post:

Comments:

0.000

End Mile Post:

2015/16

2016/17

2018/19

2019/20

$20,000

RRU

TRIP DIH

$54,000

ROW

TRIP

$88,000

CST

DIH

Phase

Fund

$30,000

$400,000

$258,000 $20,000

2015/16

$1,288,000

2016/17

$142,000

2017/18

PE

TRIP

$2,700,000

ENV

TRIP

$25,000

RRU

TRIP

$30,000

2018/19

$400,000

2019/20

ROW

DIH

$70,000

ROW

TRIP

$3,517,000

Fund

ENV

TRIP

RRU

DPTO

CST

DPTO

CST

TRIP

$2,755,000

2015/16

2017/18

2018/19

2019/20

2018/19

2019/20

$75,000 $24,739,633 $2,300,000 $500,000

2015/16

FLORIDA RAIL ENTERPRISE TOTAL

2016/17

$3,587,000

$500,000

Project Total:

$370,000

PHASE CODES

2017/18

$1,000,000

ROW

Phase

0.000

2019/20

$2,096,498

Project Total: FPN:

2018/19

$75,000

DSB

Phase

2017/18

$50,000

DSB

Project Total: FPN:

2015/16

2016/17 $3,884,498

$27,114,633

2017/18 $29,869,633

$142,000

$3,987,000

ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities

Run Date: 11/24/2014

Page: 31

SnapShot Date: 11/12/2014


DRAFT

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1 TENTATIVE WORK PROGRAM REPORT July 1, 2015 Through June 30, 2020

POLK COUNTY

POLK COUNTY TOTALS

Phase

Fund

COUNTY Total:

PHASE CODES

2015/16 $109,345,201

2016/17 $82,906,251

2017/18 $80,360,939

2018/19 $83,962,955

2019/20 $169,018,967

Total $525,594,313

ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities

Run Date: 11/24/2014

Page: 32

SnapShot Date: 11/12/2014


Parker

RD

563

L a ke l a n d Lin der Regional A i rp o r t

Miles

POLK COUNTY

µ

RESURFACING PROJECTS

LEGEND

Resurfacing Projects Interstate Highways State Roads and US Highways City/County Roads

60 Æ Ü

35 Ü

Æ6

544

Ü

Æ5 37 Ü

Ü 674

Miles Disclaimer: This map is for reference purposes only. FDOT assumes no responsibility for errors or omissions in the data.

(

Ü

® 17 q ( ( Bartow

17 Ü

Bartow Municipal Airport

Lake Shipp

R D

G AA RR DD EE NN SS CC YY PP RR EE SS SS G

BB LL VV DD

7 6 5 4

DD RR

Cypress Ga rde ns

Lake Hatchineha

® q

Lake Pierce

Lake Wales

® q

Lake Wales Municipal Airport Crooked Lake Park

6 7 5 4 17 ( 98 ( 640

35 Ü

W W II NN TT EE RR LL AA KK EE RR DD

O O VV EE RR LL O OO O KK

550

Lake Rosalie

60 Ü

Fort Meade

Æ9 ( 17

DD UU NN DD EE EE RR DD

® q

Dundee

17 (

98

542

Ü

Lake Marion

Lake Hamilton 27

Cypress 540 G a r d e n s

Æ4

DRAFT TENTATIVE WORK PROGRAM 0FY 2015/2016 - FY 2019/2020 10 Map Source: FDOT Roads/Linear Referencing System,

Ü 542

540

Lake Hancock

Ü 540

Æ7

Ü

Haines City

92 17 ( (

Winter Haven

655

Mulberry

Hillsborough Co\L

5

12 12 Æ

1

® q

540

Ü

Lake Hamilton

11 SS TT SS TT

RD

COMBEE

® q

AA VV EE NN UU EE G G

W i n t e r 655 Haven

Lake Fa nnie

540

Lake Alfred

544

570

544

27 (

CC EE RR NN EE PP AA RR KK

AA VV EE TT

557

Ü Ü Ü

Ü Ü

Ü

544

7 6 4 5

W i n t er H a v en M u n i c i p al A i rp o r t

92 (

542

LL UU

® ( Ü q

Wint er Ha ven VE Mu n i c i p a l ND AL Ai r p o r t E BB LL VV DD

44 22 NN DD SS TT

LAKE

570

572

® q

17

Lake Henry

66 TT HH SS TT

AIRPORT

33 Ü ( Ü Ü Ü

659

Davenport

559

Ü

Ü

Lakeland

4 % ( ' & 92

Revision #

Ü

570

Lake

0

4 % ( ' &

98 (

37 Ü

( ( 17

7 6 5 4

LL AA KK EE LL AA NN DD RR DD

Lake Haines

33 RR DD SS TT

33 Ü

92

O O LL DD

\L

98 (

® q

Lakeland-Linder Reg io nal A irp or t

Polk City

35 Ü

HA

92

17 ( (

Lake Rochelle

Auburnda le

HH W W YY

Co

7 6Ü 5 4 33A

92 ( 13 13 Æ

a

Æ

35

Lake Marianna

14 14 Æ

DD EE RR BB YY AA VV EE RR EE CC KK EE RR

Æ3

98 (

Ü

559

ol

POLK PKWY

EDGEWOOD DR

7 6 5 4 546

ce

2

DD

563

27 (

Lake Alfred

Lake Alfred

Ü Lake Ariana

Green Swamp

659

RR

Ü

Æ

Ü 570

Os

ST

WW

16 16 Æ

ARIANA

10 10

Lake Bo nny OO

572

600

(

471

Pasco Co\L

TT

Ü Ü

Ü

Orange Co\L

Ü

17 17 Æ

RR

OLD TAMPA HWY

92 (

7 6 5 4 655

192

33 Ü

AA

542

Lakeland

Lake Co\L

BB

PA TAM NEW HWY

Lake Parker PARKER AVE

MEMORIAL BLVD

Ü 546

' % ( & 92 7 6 4 5 ( 570

539

HARDEN

4

8 ÜÆ

10th ST

FLORIDA AVE

Æ

ST

WABASH AVE

15 15

BLVD

GALLOWAY RD

BELLA VISTA

33 Ü

RD

LAKELAND HILLS BLVD

GRIFFIN 582

7 6 5 4

Sumter Co\L

LEEN KATH RD

7 6 5 4 542A

35 Ü

Lake Buf fum

98

Ü( 700

Crooked Lake

27 (

Tiger Lake

Lake Weohyakapka

11 11 Æ

17 Ü

Frostproof Reedy Lake

L

17 (

60 Ü

Lake Kissimmee

ak

Avon Park Bombing Range e

A

rb

u

c kl

e

Hardee Co\L 11/20/2014


# 1

FPN

Facility

4345021 EWELL ROAD AT LUNN RD

Description: SKID HAZARD OVERLAY

Phase

Fund

CST

HSP

$0

$463,342

$0

$0

$0

CST

SA

$0

$10,530

$0

$0

$0

PE

HSP

$96,293

$0

$0

$0

$0

$96,293

$473,872

$0

$0

$0

Project Total:

2015/16

2016/17

2017/18

2018/19

2019/20

# 14

4365201 RESURFACE POLK PKWY, MP 0.00-8.00 & 17.24-18.09

Description: RESURFACING

3

4312911 SR 33 FROM HAYNES CIRCLE TO WITHLACOOCHEE BRIDGE

Description: RESURFACING

CST

PKYR

$0

$0

$6,375,211

$0

$0

PE

PKYR

$0

$566,685

$0

$0

$0

Project Total:

4312781 SR 35/SR 555/US 17 FROM BARTOW RD TO BEAR CREEK APTS

Description: RESURFACING

4349371 SR 37 FROM CR 630 TO CR 640 (PINECREST RD)

Description: RESURFACING

4366011 SR 37 FROM SR 60 TO N OF VIRGINIA ST

Description: RESURFACING

7

4106663 SR 542 FROM BUCKEYE LOOP ROAD TO US 27

Description: WIDEN/RESURFACE EXIST LANES

8

4365691 SR 546 (US 92) FROM WABASH AVENUE TO N. INGRAHAM AVENUE

Description: RIGID PAVEMENT REHABILITATION

4350711 SR 555 (US 17) FROM AVENUE G SW TO AVENUE A SW

Description: RESURFACING

10

4350851 SR 563 (SIKES BLVD)FROM LIME ST TO SR 539 (MLK JR BLVD)

Description: RIGID PAVEMENT REHABILITATION

$0

$0

$0

CST

DIH

$154,050

$0

$0

$0

$0

4312941 SR 60 FROM CR 630 TO KISSIMMEE RIVER BR

Description: RESURFACING

CST

DS

$3,602,942

$0

$0

$0

$0

ENV

DS

$50,000

$0

$0

$0

$0

4356061 SR 60 HILLSBOROUGH C/L DIESEL RD

Description: RESURFACING

4350751 SR 600 (US 92) FROM E OF WALKER RD TO SR 544

Description: RESURFACING

$0

$0

$0

$0

DDR

$154,050

$0

$0

$0

$0

CST

DIH

$107,835

$0

$0

$0

$0

Description: RIGID PAVEMENT RECONSTRUCTION

Fund

CST

DDR

$1,204,970

$0

$0

$0

$0

CST

DIH

$16,432

$0

$0

$0

$0

$1,221,402

$0

$0

$0

$0

Project Total:

CST

SA

$5,040,708

$0

$0

$0

$0

ENV

DS

$50,000

$0

$0

$0

$0

$5,352,593

$0

$0

$0

$0

16

4312061 US 92 (SR 600) FROM CHURCHILL AVE TO SLOAN AVE

Description: RESURFACING

CST

DIH

$0

$95,536

$0

$0

$0

CST

DS

$0

$6,522,511

$0

$0

$0

RRU

DS

$100,000

$0

$0

$0

$0

$100,000

$6,618,047

$0

$0

$0

CST

SA

$0

$1,818,211

$0

$0

$0

PE

DIH

$100,000

$0

$0

$0

$0

$100,000

$1,818,211

$0

$0

$0

Project Total: ROW

DDR

$5,402,004

$6,810,022

$0

$0

$0

ROW

DIH

$477,405

$477,405

$0

$0

$0

$5,879,409

$7,287,427

$0

$0

$0

Project Total: CST

NHRE

$0

$0

$3,696,305

$0

$0

CST

SA

$0

$0

$4,839,609

$0

$0

PE

DIH

$10,000

$0

$0

$0

$0

$10,000

$0

$8,535,914

$0

$0

CST

DDR

$0

$2,084,013

$0

$0

$0

CST

DIH

$0

$17,646

$0

$0

$0

$0

$2,101,659

$0

$0

$0

Project Total: CST

DDR

$0

$0

$0

$0

$980,530

CST

DIH

$0

$0

$0

$0

$111,290

PE

DIH

$0

$0

$10,000

$0

$0

$0

$0

$10,000

$0

$1,091,820

CST

DDR

$803,563

$0

$0

$0

$0

CST

DIH

$205,400

$0

$0

$0

$0

CST

DS

$4,549,309

$0

$0

$0

$0

$5,558,272

$0

$0

$0

$0

CST

DDR

$0

$3,425,710

$0

$0

$0

CST

NHRE

$0

$5,966,364

$0

$0

$0

CST

SA

$0

$105,300

$0

$0

$0

RRU

DS

$275,000

$0

$0

$0

$0

$275,000

$9,497,374

$0

$0

$0

CST

DDR

$4,626,710

$0

$0

$0

$0

CST

DIH

$28,756

$0

$0

$0

$0

$4,655,466

$0

$0

$0

$0

Project Total:

17

4313121 US 98 (SR 35) FROM LAKE BONNY PARK TO MAIN STREET

Description: RESURFACING

2015/16

2016/17

2017/18

2018/19

2019/20

CST

DDR

$9,620,274

$0

$0

$0

$0

CST

DIH

$46,831

$0

$0

$0

$0

CST

DS

$1,667,620

$0

$0

$0

$0

ENV

DDR

$75,000

$0

$0

$0

$0

INC

DDR

$0

$480,000

$0

$0

$0

$11,409,725

$480,000

$0

$0

$0

CST

DIH

$82,160

$0

$0

$0

$0

CST

DS

$4,326,132

$0

$0

$0

$0

ENV

DS

$100,000

$0

$0

$0

$0

RRU

DS

$5,000

$0

$0

$0

$0

$4,513,292

$0

$0

$0

$0

Project Total:

Project Total:

13

$7,368,817

CST

Project Total:

12

4347621 SR546 (MEMORIAL BLVD) FROM I-4 TO WABASH AVE

Phase

Project Total:

Project Total:

11

4350761 SR 600 (US 92) FROM E OF SR 544 TO W OF JERSEY RD

$0

$0

Project Total:

9

$0

$3,561,825

Project Total:

6

$6,375,211

DDR

Project Total:

5

$566,685

CST

Project Total:

4

$0

Facility

Description: RESURFACING

15

2

FPN

CST

DIH

$51,350

$0

$0

$0

$0

CST

SA

$1,860,303

$0

$0

$0

$0

$1,911,653

$0

$0

$0

$0

Project Total:


Green Swamp

FL OR ID A AV E

BLVD

33A

35

33 Ü

Ü 98 (

4 % ( ' & 8 9 D :

13 13 Æ 559

Lake Alfred 570

Ü 20 20 Æ

659

W i n t e r H av e n Mu n icipal A i rp o r t

21 21

0

µ

12.5

60 Ü 8 9 D :

POLK COUNTY City/County Roads

ITS Freeway Management

e

8 9 : l 8 9 : D 8 m O ½ !

Bike Path

Ï !

Intersection

ADD

à ¾ "

Sidewalks

Õ !

Lighting

Public Transportation Shelter

8 9 Z : ! C

Landscaping Add Turn Lane

Pedestrian/Wildlife Overpass

Traffic Ops Improvement Rail Safety Project

26 26

Æ

23 23 Æ

9

Æ1

2 Æ

Lake Hancock

Bartow

Õ !

Ü 544

Lake Ham ilton

Eagle Lake

17 ( 8 9 D 8 : ® q 9 m Æ8 : 17 (

Ü 540

! C

674

Ü

Map Source: FDOT Roads/Linear Referencing System, Disclaimer: This map is for reference purposes only. FDOT assumes no responsibility for errors or omissions in the data.

542

35 Ü

98 Ü( 700

L a k e 544 Cannon

AVENUE G

R D

CERNE PARK LL UU C

Lake Fannie

AA VV EE TT

La ke Howar d

WINTER LAKE RD

La ke Shipp

Lake Hamilton

O

542

CYPRESS GARDENS

La ke Lulu

BLVD

DUNDEE RD OVERLOOK

550

DR

Cypress Gard ens

Lake Mar io n

Lake Hatchineha

Lake Rosalie Tiger Lake

Crooked Lake

Lake Weoh yakap ka

Lake Kissimmee

60 Ü

17 Ü

Frostproof Reedy Lake

L

17 (

544

27 (

540

Lake Wales Municipal Airport

Fort Meade

La ke Rochelle

Õ !

Winter Haven VE M u n i c ip a l ND AL Airport E BLVD

655

® q

27 (

La ke Henry

Ü

Lake Wales

60 Ü

La ke Haines

Lake Pierce

17 Ü

Bartow Municipal Airport

92

17 ( (

City

8 9 D :

Lake Bu ffu m

37 Ü

OLD

540

17 ( 98 (

DRAFT TENTATIVE WORK PROGRAM FY 2015/2016 - FY 2019/2020 Revision #

35 Ü

8 9 m : 92 Haines ( ! C 16 16 Æ

HWY

LAKELAND RD

Ü

540

8 9 ZÆ ( : 98

31 31 Æ

Hills borough Co\L

State Roads and US Highways

8 9 D :

Mulberry

TRAFFIC OPERATIONS AND OTHER PROJECTS

Interstate Highways

570

563

Lakelan dLinder Reg io nal Airpo rt

Miles

LEGEND

572

17 (

12 12 Æ

HA

DERBY AVE RECKER

540

Æ7 ® q Lake Winter 544 H a m ܽ 29 29 i l t o n ! Haven O 27 Æ ( 542 655 Dundee Ü Ü Ï ! ! C8 9 l :

Parker

570

Davenport

Ü

Ü 8 9 m : 8 9 l8 : 9 m ! : 92 ! ( C C ! C 8 9 D : Æ 8 9 l : 9 2 9 m : (8 ! C 8 9 l8 : 9 m : Ü mÜ33 8 : Ü Ü9 Ü Ü ® Lakeland q Lake

4 % ( ' &

La ke Mari anna

Auburndale

\L

37 Ü 8 9 D :

Polk City

92 ( 17 (

559

18 18 Æ 17 92 ® ( Ü q ( 28 28 Æ ½ ! Ü 24 24 7 6 5 4 Æ 11 11 Winter ÏÆ ! Ü Ü 8 9 l17 : C 8 Haven 4 ! : 9 l ( 7 6 5 4 15 15 Ü Æ Æ

7 6 5 4 546

Co

HARDEN

RD

(

a

AIRPORT

98

Ü Lake Ariana

! C

ol

EDGEWOOD DR

Ü

ce

659

DD

Regi onal Airport

RR

PKWY

WW

POLK

OO

ST

563

572

: 8 9 m Os

AR IA NA

TT

570

Pasco Co\L

La k e Bon n y

RR

OLD TAMPA HWY

(

AA

542

600

471

Ü

27

BB

PA TAM NEW HWY

33 Ü

570

Lake Alfred

La ke Alfred

1ST ST

WABASH AVE

546

MEMORIAL BLVD

7 6 5 4

(

655

6TH ST

3 1 0 t h539 ST

Orange Co\L

192

33 RR DD SS TT

ST

LAKE PARKER AVE

Lakeland 25 25 Æ Ü Æ 27 27 92 14 14 Æ ( Æ 8 9 l8 : 9 m : Ü C ! C ! 4 ' ( & 30 30 % Ü 8 Æ 8 9 D : 9 l : 10 10 Æ 9 m : 92 8 7 6 5 ( C4 ! 8 9 l : 19 19 Æ 31 31 8 9 m Ü : Æ 5 6 ÆÆ 32 32 Ü8 9 m : 35 Æ Ü Ü 7 6 5 4 17 17 Æ Ü 98 ( ®d - L i n d e r L a k e l a nq BELLA VISTA

Lake Co\L

44 22 NN DD SS TT

22 22 Æ

RD

RD

COMBEE

33 Ü

LA KE LA ND H IL L S BLVD

GALLOWAY RD

GR IF FIN 582

7 6 4 5

8 9 D :

35 Ü

Sumter Co\L

542A

L EEN KATH RD

7 6 5 4

ak

Avon Park Bombing Range e

A

rb

u

ck

le

Hardee Co\L 11/20/2014


# 1

FPN

Facility

4328091 BAKER ST FROM N VAN FLEET DR TO BRITTS LANEXING #624503-T

Phase

Fund

RRU

RHH

Project Total:

2015/16

2016/17

2017/18

2018/19

2019/20

$270,600

$0

$0

$0

$0

$270,600

$0

$0

$0

$0

Description: RAIL SAFETY PROJECT

2

$661,193

$0

$0

$0

SA

$0

$10,530

$0

$0

$0

SA

$10,000

$20,000

$0

$0

$0

Project Total:

$10,000

$691,723

$0

$0

$0

CST SU 4351071 BRUNNELL PARKWAY FROM MEMORIAL BLVD TO TENTH STREET Project Total:

$0

$151,090

$0

$0

$0

$0

$151,090

$0

$0

$0

Description: INTERSECTION IMPROVEMENT

3

17

CST

HSP

4367891 COLEMAN RD RECKER HWY TO 26TH ST X-ING # 625397R

CST ENV

RRU

RHH

$276,600 $276,600

$0 $0

$0 $0

$0 $0

$0

4298831 LK ALFRED TR AT US 17/92 BRIDGE

Phase

Fund

CST

ACSU

CST

SU

Project Total: CST

CM

2015/16

2016/17

2017/18

2018/19

2019/20

$231,540

$0

$0

$0

$0

$1,000

$0

$0

$0

$0

$232,540

$0

$0

$0

$0

$1,524,600

$0

$0

$0

$0

CST CST

DDR

$48,444

$0

$0

$0

$0

SA

$214,087

$0

$0

$0

$0

ENV

TALT

$50,000

$0

$0

$0

$0

$1,837,131

$0

$0

$0

$0

Project Total:

19

4332601 NEW YORK CYCLE TRACK (LIME STREET) FROM SIKES BLVD TO NEW YORK AVENUE

Description: BIKE PATH/TRAIL

CST

TALU

$0

$0

$532,500

$0

$0

PE

LF

$0

$115,307

$0

$0

$0

PE

TALU

$0

$1,000

$0

$0

$0

Project Total:

$0

$0

$116,307

$532,500

$0

$0

20 RRU

RHH

Project Total:

$119,671

$0

$0

$0

$0

$119,671

$0

$0

$0

$0

$119,671

$0

$0

$0

$0

$119,671

$0

$0

$0

$0

4344891 OLD DIXIE HIGHWAY/ SADDLE CREEK ROAD

Description: SIDEWALK

CST

HSP

$0

$679,483

$0

$0

$0

CST

SA

$0

$10,530

$0

$0

$0

$0

$690,013

$0

$0

$0

$255,600

$0

$0

$0

$0

$255,600

$0

$0

$0

$0

Project Total:

Description: RAIL SAFETY PROJECT

21 6

4367911 CR 542 OLD TAMPA HWY FROM GAY RD TO GAY RDXING #624215Y

RRU

RHH

Project Total:

4367881 PAYNE ST SR 600/US92 BLUE JAY AVE X-ING #623084U

RRU

RHH

Project Total:

Description: RAIL SAFETY PROJECT

Description: RAIL SAFETY PROJECT

22 7

4332721 CR 544 AT SR 17

CST

LF

$70,485

$0

$0

$0

$0

CST

SU

$1,000,182

$0

$0

$0

$0

$1,070,667

$0

$0

$0

$0

$295,146

$0

$0

$0

$0

$295,146

$0

$0

$0

$0

4344881 SR 33 (LAKELAND HILLS BLVD) AT N SOCRUM LOOP RD

Description: INTERSECTION IMPROVEMENT Description: INTERSECTION IMPROVEMENT

8

4332741 CR 655 (RIFLE RANGEROAD) FROM 10TH STREET E TO BOMBER ROAD

Project Total: CST

SU

Project Total:

Description: SIDEWALK

9

4349421 CREWS LAKE RD FROM LAKELAND HIGHLANDS RD TO KITTY FOX

Description: TRAFFIC OPS IMPROVEMENT

10

4350691 CRYSTAL LAKE DR FROM US 98 TO NEW JERSEY RD

23

11

4332291 EAST LAKE HOWARD TRAIL

Description: BIKE PATH/TRAIL

12

4309181 EASTSIDE ELEMENTARY SCHOOL SAFETY SIDEWALKS

4345071 SR 37 AT LAKE HARRIS DRIVE

Description: INTERSECTION IMPROVEMENT

CST

HSP

$0

$1,483,046

$0

$0

$0

CST

SA

$0

$8,424

$0

$0

$0

$0

$1,491,470

$0

$0

$0

$550,159

$0

$0

$0

$0

$1,000

$0

$0

$0

$0

$551,159

$0

$0

$0

$0

CST

ACSU

CST

SU

Project Total: CST

TALT

$342,360

$0

$0

$0

$0

CST

TALU

$256,475

$0

$0

$0

$0

$598,835

$0

$0

$0

$0

$174,758

$0

$0

$0

$0

Project Total: CST

TALT

Project Total:

$174,758

$0

$0

$0

$0

4106664 SR 542 FROM 1ST STREET TO BUCKEYE LOOP ROAD

Description: LANDSCAPING

4352841 SR 546 (MEMORIAL) FROM CHESTNUT RD E TO BRUNNELL PKWY

Description: BIKE PATH/TRAIL

4273152 I-4 FROM EAST OF POLK PARKWAY TO OSCEOLA COUNTY LINE

Description: ITS FREEWAY MANAGEMENT

4328041 INTERLACHEN PKWY FROM FERN RD TO E GARY RDXING# 624155-S

DSB

DIH

$23,621

$0

$0

$0

$0

DSB

HSP

$3,635,366

$0

$0

$0

$0

PE

HSP

$75,000

$0

$0

$0

$0

$3,733,987

$0

$0

$0

$0

$281,300

$0

$0

$0

$0

RRU

RHH

Project Total:

$281,300

$0

$0

$0

$0

Description: RAIL SAFETY PROJECT

15

4351091 LAKE HOWARD DR FROM AVE D SW TO 15TH ST SW

Description: BIKE PATH/TRAIL

26

4345091 SR 60 AT BAILEY RD

Description: INTERSECTION IMPROVEMENT

4367901 LEM CARNES RD CR 547N TO SR 600/US 17 X-ING #622960T

Description: RAIL SAFETY PROJECT

27

4349381 SR 600 (US 92) FROM W OF THOMPSON RD TO E OF FISH HATCHERY RD

Description: RAIL SAFETY PROJECT

$0

$0

$0

$0

$0

$0

$0

CST

HSP

$168,366

$6,318

$0

$0

$0

$201,149

$6,318

$0

$0

$0

CST

DDR

$0

$31,982

$0

$0

$0

CST

HSP

$0

$641,240

$0

$0

$0

CST

SA

$0

$10,530

$0

$0

$0

$0

$683,752

$0

$0

$0

CST

DIH

$0

$0

$0

$0

$5,670

CST

DS

$0

$0

$0

$0

$234,396

$0

$0

$0

$0

$240,066

Project Total: CST

DIH

$15,405

$0

$0

$0

$0

CST

DS

$883,672

$0

$0

$0

$0

PE

DIH

$10,000

$0

$0

$0

$0

$909,077

$0

$0

$0

$0

CST

DDR

$0

$25,300

$0

$0

$0

CST

HSP

$0

$596,354

$0

$0

$0

CST

SA

$0

$54,963

$0

$0

$0

$0

$676,617

$0

$0

$0

TALT

$0

$0

$0

$83,773

$0

CST

TALU

$0

$0

$0

$344,752

$0

PE

LF

$0

$155,000

$0

$0

$0

$0

$155,000

$0

$428,525

$0

28

4350781 US 17 AND 544 BUS STOP IMPROVEMENTS

$270,600

$0

$0

$0

$0

$270,600

$0

$0

$0

$0

29

4345061 US 27 AT MAIN ST/CRUMP RD

Description: LIGHTING

RRU

RHH

Project Total:

CST

DIH

$0

$130,536

$0

$0

$0

CST

DS

$0

$996,463

$0

$0

$0

RRU

DS

$75,000

$0

$0

$0

$0

$75,000

$1,126,999

$0

$0

$0

Project Total:

Description: PUBLIC TRANSPORTATION SHELTER CST

Project Total:

16

$0

$25,816

Project Total:

Project Total:

14

$6,967

DIH

Project Total:

Description: SIDEWALK

13

DDR

CST

Project Total:

24 Project Total:

CST

Project Total:

25 Description: SIDEWALK

# 30

FPN

Facility

4351081 US 92 FROM HOLIDAY MPH ENTRANCE TO N CHESTNUT RD

Description: SIDEWALK

Phase

Fund

CST

DS

$0

$0

$0

$45,093

$0

CST

SU

$0

$0

$0

$965,076

$0

PE

SU

$0

$345,000

$0

$0

$0

$0

$345,000

$0

$1,010,169

$0

31

4298131 US 92 -NEW TAMPA HWY AT WABASH AVE

Description: INTERSECTION IMPROVEMENT

4313531 WESTGATE-CENTRAL TRAIL FROM WEST BELMAR ST TO OAKHILL STREET

Description: BIKE PATH/TRAIL

CST

FTAT

$49,661

$0

$0

$0

$0

CST

SU

$49,661

$0

$0

$0

$0

$99,322

$0

$0

$0

$0

Project Total: CST

DDR

$0

$12,925

$0

$0

$0

CST

HSP

$0

$264,801

$0

$0

$0

CST

SA

$0

$10,530

$0

$0

$0

PE

HSP

$64,437

$0

$0

$0

$0

$64,437

$288,256

$0

$0

$0

Project Total:

2016/17

2017/18

2018/19

2019/20

DDR

$0

$0

$818,466

$0

$0

CST

DIH

$0

$0

$1,000

$0

$0

ENV

DDR

$10,000

$30,000

$0

$0

$0

$10,000

$30,000

$819,466

$0

$0

Project Total:

32

2015/16

CST

CST

LF

$0

$182,005

$0

$0

$0

CST

SU

$0

$127,595

$0

$0

$0

CST

TALT

$0

$97,851

$0

$0

$0

CST

TALU

$0

$333,722

$0

$0

$0

$0

$741,173

$0

$0

$0

Project Total:

Description: RAIL SAFETY PROJECT

4367871 CR 542 OLD TAMPA HWY FROM GAY RD TO DOC GAY RD X-ING #624214S

4350611 LINCOLN AVE SIDEWALKS

Description: PEDESTRIAN/WILDLIFE OVERPASS

Project Total:

5

Facility

Project Total:

18

Description: SIDEWALK

4

FPN

Description: SIDEWALK

$0

4345081 BOMBER ROAD AT SPRUCE ROAD AND GERBER ROAD

#


Sumter Co\L

Lake Co\L

Orange Co\L

( 192

33 Ü

Ü 471

27 (

Pasco Co\L

Green Swamp

Os

12 12 Æ

Æ6 570

L a k e l a n dÜ Lake

659

Parker

92 ( 33 16 16 Ü Æ Ü Ü Ü 570

572

563

® q

µ

L a ke l a n d Lin der Regional A i rp o r t 0

5

60 Ü

Miles

POLK COUNTY CAPACITY PROJECTS Capacity - PD&E Phase

Capacity - Design Phase

Capacity - Right-of-Way Phase Capacity - Construction Phase

à

Bridge Projects

Interstate Highways

State Roads and US Highways

570

544

655

540

540

35 Ü 98 (

Æ2

(

13 13 Æ

Ü

Ü 542

(

Cypress Gardens

Dundee

Ü 540

17 (

® (q

Bartow Municipal Airport

17

37 Ü

Ü 674

DRAFT TENTATIVE WORK PROGRAM FY 2015/2016 - FY 2019/2020 Map Source: FDOT Roads/Linear Referencing System, Disclaimer: This map is for reference purposes only. FDOT assumes no responsibility for errors or omissions in the data.

Fort Meade

Lake Wales

® q

14 14 Æ

Crooked Lake Park

35 Ü

à Æ 5

Lake Rosalie

Lake Wales Municipal Airport

17 17 Æ

à

Lake Hatchineha Lake Pierce

17 Ü

Æ3

60 Ü

Æ1

Lake Marion

544

Lake Lake W i n t eHra m i l t o nH a m i l t o n H a v e n 27

Ü Ü 10 10 Ü Æ

Ü

Haines City

92

10 10 Æ 98 Ü( 700

Crooked Lake

27 (

Lake Buf fum

City/County Roads

Revision #

Ü

Lake Alfred

® q

92 (

17 ( 98 (

Hillsborough Co\L

LEGEND

àÆ 9

17 (

W i n t er H a v en M u n i c i p al A i rp o r t

15 15 Æ

Bartow

Mulberry

Davenport

559

Ü

\L

11 11 Æ 4 ( ' & %

Ü

Co

33 Ü

4 % ( ' & Æ4

Æ7

a

35 Ü

Polk City

92 ( 17 (

ol

Æ8

ce

98 (

Tiger Lake

Lake Weohyakapka

60 Ü

17 Ü

Frostproof Reedy Lake

L

17 (

Lake Kissimmee

ak

Avon Park Bombing Range e

A

rb

u

c kl

e

Hardee Co\L 11/20/2014


# 1

FPN

Facility

4313521 BARTOW NORTHERN CONNECTOR PHASE II FROM US 17 TO SR 60

Description: NEW ROAD CONSTRUCTION

Phase

Fund

CST

CIGP

$0

$0

$0

$467,864

$0

CST

LFP

$0

$0

$0

$9,819,995

$0

CST

TRIP

$0

$0

$0

$2,998,420

$0

$0

$0

$0

$13,286,279

$0

Project Total:

2

4316411 CENTRAL POLK PWKY FROM POLK PWKY (SR 540) TO SR 35 (US 17)

Description: NEW ROAD CONSTRUCTION

3

4316412 CENTRAL POLK PWKY FROM SR 35 (US 17) TO LOGISTICS PARKWAY

Description: NEW ROAD CONSTRUCTION

4

4316418 CENTRAL POLK PWKY FROM US 17/US 92 TO I-4

Description: NEW ROAD CONSTRUCTION

5

4317721 COW CAMP ROAD BRIDGE NO. 160400 OVER ROSALIE/ZIPPRER CANAL

2015/16

2016/17

2017/18

2018/19

2019/20

ROW

DDR

$0

$0

$0

$1,966,740

$1,985,083

ROW

DIH

$0

$0

$0

$151,944

$136,943

Project Total:

$0

$0

$0

$2,118,684

$2,122,026

ROW

DDR

$0

$0

$0

$4,611,162

$3,479,790

ROW

DIH

$0

$0

$0

$506,479

$456,479

$0

$0

$0

$5,117,641

$3,936,269

$0

$9,212,000

$0

$0

$0

4301853 I-4 @ SR 33 INTERCHANGE MODIFICATION

Description: INTERCHANGE IMPROVEMENT

Project Total: PE

DDR

2012153 I-4 AT SR 557

Description: INTERCHANGE IMPROVEMENT

PE

DIH

Project Total: CST

ACBZ

Project Total:

$0

$110,000

$0

$0

$0

$0

$9,322,000

$0

$0

$0

$0

$1,668,600

$0

$0

$0

$0

$1,668,600

$0

$0

$0

ENV

SA

$0

$0

$1,300,000

$0

$0

ROW

DIH

$0

$0

$0

$271,270

$0

ROW

DS

$0

$0

$0

$33,489

$0

ROW

SA

$0

$0

$0

$2,483,295

$0

$0

$0

$1,300,000

$2,788,054

$0

CST

ACNP

$0

$0

$0

$0

$54,664,218

CST

DIH

$0

$0

$0

$0

$508,099

ENV

DI

$0

$0

$100,000

$0

$0

RRU

ACNP

$0

$0

$0

$0

$4,500,000

$0

$0

$100,000

$0

$59,672,317

Project Total:

8

4366731 SR 35/700 (US 98) FROM N. OF WEST SOCRUM LOOP RD TO SR 471

Description: PD&E/EMO STUDY

9

1975624 SR 35/700 (US98) FROM EDGEWOOD DRIVE TO E MAIN STREET

Description: ADD LANES & RECONSTRUCT

10

4106662 SR 542 FROM 1ST STREET TO BUCKEYE LOOP RD

Description: ADD LANES & RECONSTRUCT

PDE

DIH

$0

$0

$0

$0

$200,000

PDE

DS

$0

$0

$0

$0

$2,100,000

$0

$0

$0

$0

$2,300,000

Project Total: ROW

CM

$0

$0

$0

$1,723,607

$1,723,454

ROW

SA

$0

$0

$0

$1,522,651

$4,242,750

$0

$0

$0

$3,246,258

$5,966,204

Project Total: CST

DDR

$0

$0

$0

$15,736,323

$0

CST

DIH

$0

$0

$0

$331,800

$0

ENV

DS

$40,000

$200,000

$0

$0

$0

ROW

SU

$5,241,467

$1,221,060

$0

$0

$0

RRU

DDR

$0

$0

$0

$1,000,000

$0

RRU

LF

$0

$0

$0

$2,951,628

$0

$5,281,467

$1,421,060

$0

$20,019,751

$0

Project Total:

11

4366721 SR35/700 US 98 FROM WEST DAUGHTERY ROAD TO NORTH OF WEST SOCRUM LOOP RD

PDE

DIH

$0

$0

$0

$0

$150,000

PDE

SA

$0

$0

$0

$0

$1,500,000

$0

$0

$0

$0

$1,650,000

Project Total:

Description: PD&E/EMO STUDY

12

4313511 US 17/92 HINSON AVE FROM SR 17 (10TH STREET) TO 17TH STREET

Description: PD&E/EMO STUDY

13

4313512 US 17/92 HINSON AVE FROM SR 17 (10TH STREET) TO 17TH STREET

Description: ADD LANES & RECONSTRUCT

Facility

4192434 US 27 FROM PRESIDENTS DRIVE TO SR 60

Description: ADD LANES & RECONSTRUCT

Phase

Fund

CST

DDR

$0

$0

$0

$0

$52,843,410

CST

DIH

$0

$0

$0

$0

$941,628

ENV

DI

$0

$0

$195,000

$500,000

$0

$0

$0

$195,000

$500,000

$53,785,038

Project Total:

15

4312081 US 92 (SR 600) FROM REYNOLDS RD TO SCHALAMAR CREEK ENT

Description: BRIDGE REPLACEMENT

16

4335582 US 92 FROM COUNTY LINE ROAD TO WABASH AVENUE

2015/16

2016/17

2017/18

2018/19

2019/20

CST

DDR

$884,467

$0

$0

$0

$0

CST

DIH

$386,374

$0

$0

$0

$0

CST

DS

$10,635,796

$0

$0

$0

$0

INC

DS

$0

$392,000

$0

$0

$0

$11,906,637

$392,000

$0

$0

$0

$0

$0

$0

$4,450,000

$0

$0

$0

$0

$4,450,000

$0

PE

SA

Project Total:

Description: ADD LANES & RECONSTRUCT

Project Total:

7

14

FPN

Project Total:

Description: BRIDGE REPLACEMENT

6

#

PDE

DIH

$20,000

$0

$0

$0

$0

PDE

DS

$150,998

$800,000

$0

$0

$0

$170,998

$800,000

$0

$0

$0

Project Total: PE

DIH

$0

$0

$0

$3,000

$0

PE

DS

$0

$0

$0

$1,350,000

$0

$0

$0

$0

$1,353,000

$0

Project Total:

17

4348862 US 98 (PEACE RIVER-FT MEADE) AT BRIDGE NO 0064 (JOHN SINGLETARY BRIDGE)

Description: BRIDGE REPLACEMENT

PE

DIH

$0

$0

$0

$0

$100,000

PE

SA

$0

$0

$0

$0

$2,000,000

$0

$0

$0

$0

$2,100,000

Project Total: