Estimating and Tendering

Page 233

Estimating and Tendering for Construction Work

CB Construction Limited

Student Accommodation Steel frame solution

Project Overheads GFA (m2) 11.59%

Date net trade value

Description

Note

Protection materials

Quant Unit Factor 1 697 m

2

COMMERCIAL/FINANCIAL

Fixed charges 1.50

1

£1.85 m

Time charges

Sub-tot

2 546

Insurance – all-risks

0.002

1

2 220 000

4 440

Insurance – hired plant

0.019

1

100 000

1 920

Insurance – emply liab

0.003

1

2 220 000

6 660

Insurance – premium tax

0.050

1

15 240

762

Insurance excesses

1

2 000

4 000

1 1

2 220 000

2 220 –

– –

Architectural fees

Structural engineer

M&E advice and coord

QS fees

CAD file on disk

Building regs

Professional indemnity p Legal advisors pre-constr DESIGN & BUILD FEES AND COSTS

2 nr 0.001 –

1697 12-Jul-04

26 446

20 002

Fig. 15.3 Project overheads

Similarly the staff costs are difficult to share between valuations because they are usually higher at the beginning of a contract and taper off gradually towards the end. Staff costs are often incurred before the start date, when mobilization activities – such as procurement of initial packages – take place. When the estimate has been reviewed by management the estimator will allocate sums of money to the preliminaries bill.This is an opportunity to ensure that a satisfactory (and possibly positive) cashflow position is secured. In particular the contractor needs to identify setting-up costs that should be claimed in the first valuation as fixed charges. If all site and general overheads were reimbursed in proportion to time the contractor would have more expenditure than income and this poor cashflow position would persist during most of the contract duration. The early fixed charges often include: Employer’s requirements Accommodation Furniture 214