Feasibility Study for Pointe 91

Page 38

V.

REQUIREMENTS ON SERVICES IN TOURIST AND SERVICE AREA ·

Safety room for the safe-keeping of monetary and valuable goods

·

Public services to include a courier/postal services, public telephones, film developments, faxes, xeroxing, typing, stationary for rent and athletic apparatus.

·

Disability access for wheelchair and other handicapped visitors

·

On-staff emergency team for rescue and medical emergencies

·

Entertainment services, Tourist Concierge Services, Car Keeprs, Rental cars and bicycles

Moreover, a minimum of at least 30 - 50 cars, 2-3 tourist boats, 7 canoes and other means of water transport available to meet the needs of visitors.

VI.

GENERAL CONSTRUCTION PLAN With an initial project area of 42 hectares, the land area is apportioned as follows:

VII.

·

Total construction area: 22% (approximately 5ha)

·

Construction area for public utilities: 18%

·

Area for traffic: 2 %

·

Area for green trees and water surface: 59%

·

(Note: Amended construction plan will account for additional land allocation of 40 – 115 additional hectares in the near future).

ENGINEERING SOLUTION ·

Magnum Sheething Boards reinforced by Cold Steel Construction

·

International Standard Elevators with evacuation stairs and fire preventing and fighting system in accordance with the law.

·

Innovative and Stable WiFi Network

Feasibility Study Report for Pointe91 at Chu Lai

Page 38


Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.