4 120 4 120
4 120 3 120
All services penetrations to agreed with the architect All services and appropriately penetrations to agreed with the architect and appropriately sealed for air tightness. Target air tightness level 0.6 sealed -1/h for air tightness. Target air tightness level 0.6 -1/h To be read in conjunction with THA specification and schedules, Any discrepencies attention of Any the discrepencies architect - to beand brought to the attention of the architect structural engineers to andbeCLT drawings and specification. Tobrought bemanufacturers readtointhe conjunction with THA specification schedules, If in doubt please ask. t.structural 01688302746 / m. 07980885164 If inmanufacturers doubt please ask. t. 01688302746 / m. 07980885164 engineers and CLT drawings and specification. All services penetrations to agreed with the architect and appropriately sealed for air tightness. Target air tightness level 0.6 -1/h All services penetrations agreed with the poprzez architect and appropriately Wszelkie otwory poprzez drewniany szkielet lubto w Wszelkie betonowej otwory płycie, z drewniany szkielet lub w betonowej płycie, z sealed air tightness. air tightness 0.6 -1/h wnętrza budynku na wylot do for zewnętrza, musząTarget być wnętrza uzgodnione budynku z level na wylot do zewnętrza, muszą być uzgodnione z Any discrepencies to be brought to the attention of the architect architektem i odpowiednio uszczelnione hermetycznie. architektem wymagany i odpowiednio uszczelnione hermetycznie. wymagany If in doubt please ask. t. 01688302746 / m. 07980885164 Any discrepencies to be brought the attention of the architect poziom szczelności hermetycznej 0.6 -1 / h. poziomtoszczelności hermetycznej 0.6 -1- / h. If in doubt please ask. t. 01688302746 / m. 07980885164 W wypadku niezgodnośći lub rozbieżnośći skonsultować wypadkupłycie, niezgodnośći sie z lub rozbieżnośći należy skonsultować sie z Wszelkie otwory poprzez drewniany szkielet należy lub w W betonowej architektem. W nawypadku jakichkolwiek wątpliwosci należy szkielet jakichkolwiek wątpliwosci należy wnętrza budynku wylot do zewnętrza, byćarchitektem. uzgodnione zW wypadku Wszelkie otworymuszą poprzez drewniany lub w betonowej płycie, z skontaktować sie z architektem. t. 01688302746 / skontaktować m. 07980885164 sie z architektem. t. 01688302746 / m. 07980885164 architektem i odpowiednio uszczelnione hermetycznie. wymagany wnętrza budynku na wylot do zewnętrza, muszą być uzgodnione z poziom szczelności hermetycznej 0.6 i-1odpowiednio / h. architektem uszczelnione hermetycznie. wymagany poziom szczelności hermetycznej 0.6 -1 / h. W wypadku niezgodnośći lub rozbieżnośći należy skonsultować sie z architektem. W wypadkuWjakichkolwiek wątpliwoscilub należy wypadku niezgodnośći rozbieżnośći należy skonsultować sie z skontaktować sie z architektem. t. 01688302746 / m. 07980885164 architektem. W wypadku jakichkolwiek wątpliwosci należy SERVICES KEY SERVICES KEY skontaktować sie z architektem. t. 01688302746 / m. 07980885164
5 120
5 120
3 120
To be read in conjunction with THA specification and To be schedules, read in conjunction with THA specification and schedules, structural engineers and CLT manufacturers drawings structural and specification. engineers and CLT manufacturers drawings and specification.
5 120
5 120
4 120
IN DETAIL Consumer unit
Consumer unit
TP
Porch 3.1sqm
Porch 3.1sqm
Bedroom 1 13.8sqm
Bedroom 2 9.3sqm
Bedroom 2 9.3sqm
TP
TP
Porch 3.1sqm
Porch 3.1sqm Bedroom 1 13.8sqm
TP
Consumer unit
3 120
3 120
Consumer unit
Fused Spur
Fused Spur
1 Gang outlet - low level
1 Gang outlet - low level
SERVICES KEY
1 Gang outlet
Bedroom 2 9.3sqm
Bedroom 1 13.8sqm
Bedroom 2 9.3sqm
TV TP
SD
SD
Storage heater
Hall 3.2sqm
Bedroom 3 8.9sqm
SD
SD
1 120
Towel rail
Storage heater
Towel rail
SD
2
TV
TV
Bath 6sqm
Storage heater
Bath 6sqm
Towel rail
TP
Living 15.8sqm
1 120
P
Living 15.8sqm
P
P
WM
Dining 11.7sqm
WM
Storage heater
SD
Dining 11.7sqm
P
Towel rail
WM Play / Study SD 5.7sqm
Dining 11.7sqm
Shower 3sqm
Single House Plan 3 120
3 120
3 120
3 120
Kitchen 5.7sqm
Utility 3sqm
Lighting C1 Lighting C2
2 120
H
2 120
SD
Towel rail
Towel rail heater Storage heater
Smoke detector with a sounder Towel rail heater
Storage heater
Storage heater
Smoke Telecom Lighting C1 Lighting C2
Electric Smoke Telecom Lighting C1 Lighting C2 Electric
H
2 120
2 120
Towel rail heater
Storage heater
Electric
Shower 3sqm
H
2 120
2 120
2 120
Electric
Smoke Telecom
Hanging fabric cable
Hanging fabric cable
Behind skirting
Behind skirting
Smoke under Telecom Conduit floor Conduit under floor Hanging fabric cable Behind plasterboard Hanging fabric cable Behind plasterboard Behind skirting Galvanised conduit Galvanised conduit Behind skirting Conduit under floor Holes through CLT ceiling panelsunder floor Holes through CLT ceiling panels Conduit Behind plasterboard Cable run above CLT ceiling Cable run above CLT ceiling Behind plasterboard Galvanised conduit Galvanised conduit Plasterboard ceiling Plasterboard ceiling Holes through CLT ceiling panels Holes through CLT ceiling panels Cable run above CLT ceiling Cable run above CLT ceiling Plasterboard ceiling
5 120
5 120
Adjacent house mirrored layout
2 120
Recessed light
Heat detector with a sounder Storage heater
Storage heater
Smoke detector with a sounder
Smoke detector with a sounder
5 120
Adjacent house mirrored layout
Kitchen 5.7sqm
Scale: 1:25
Kitchen 5.7sqm
H
5 120
Adjacent house mirrored layout Adjacent house mirrored layout
Scale: 1:25
Kitchen 5.7sqm
Scale: 1:25
Single House Plan
Heat detector with a sounder
SD
Utility 3sqm
Shower 3sqm
Single House Plan
Towel rail heater Heat detector with a sounder
Shower 3sqm
Utility 3sqm
Utility 3sqm
Scale: 1:25
Automatic Floodlight, enclosed
Recessed light
Ceiling mounted light
Smoke detector with a sounder Recessed light
Towel rail Storage heater
WM
Dining 11.7sqm
Play / Study SD 5.7sqm
Lighting C1 Lighting C2
Single House Plan
Ceiling mounted light
Single pole switch, 2 gang 2 way 1 pole switch
Heat detector with enclosed a sounder Automatic Floodlight,
P
TP
P
2 way 1 pole switch
Single pole switch
Automatic Floodlight, enclosed 2 way 1 pole switch
SD
TP SD Play / Study Living 5.7sqm 15.8sqm
Television
Single pole switch, 2 gang Television
Automatic Floodlight, enclosed
P
Towel rail
Play / Study SD 5.7sqm
Television
2 Telephone / data point
Ceiling mounted light Single pole switch, 22 gang
Bath 6sqm
TP
TP
P
Living 15.8sqm
Telephone / data point
Single pole switch
1 120 Single pole switch, 2 gang
Recessed light Ceiling mounted light
Bath 6sqm
TV TP
Single pole switch Telephone / data point
2
TP TV
TP
1 120
Towel rail
Storage heater
1 120
1 Gang outlet
Television 2 Gang outlet
2 way 1 pole switch Single pole switch
SD
1 120
1 Gang outlet - low level
2 Gang outlet
Hall 3.2sqm
Bedroom 3 8.9sqm
2 Gang outlet
Fused Spur
Telephone / data point 1 Gang outlet
TV TP
1 120
Hall 3.2sqm
SD
TV TP
SD
1 120
Hall 3.2sqm
Bedroom 3 8.9sqm
1 Gang outlet
SERVICES KEY
Fused Spur 2 Gang outlet 1 Gang outlet - low level
Bedroom 3 8.9sqm
TV TP
Bedroom 1 13.8sqm
Plasterboard ceiling
Revision Issue
Date
Description
Additional standards: AECB Silver Standard certified. Airtightness (at 50 Pascals): 0.39 ACH or 0.378m3/m2/hr Energy performance certificate (EPC): B83 (Scotland) Measured energy consumption: 1,855 & 2,347 kWh for first 3.5 months of occupation (June to Sept 2017).
Drawing status:
Drawing status:
CONSTRUCTION
Drawing status: CONSTRUCTION CONSTRUCTION
USCA housing
Drawing Title
Project TitleNo. Drawing Drawing Scale Title Drawing No.
Scale
23 Main Street, Tobermory, Isle of Mull, PA75 6NU +44 (0)1688302746 www.thornewyness.co.uk
Client:
USCA
Electrical Layout Thorne Wyness Architects
Client:
USCA
23 Main Street, Tobermory, Isle23 ofMain Mull, Street, PA75 6NU Tobermory, Isle of Mull, PA75 6NU +44 (0)1688302746
Drawing status:
CONSTRUCTION
.5°
USCA housing j037 - 112 Project Title
23 Main Street, Tobermory, Isle of Mull, PA75 6NU +44 (0)1688302746 www.thornewyness.co.uk
Description
N
+44 (0)1688302746 Thorne www.thornewyness.co.uk www.thornewyness.co.uk Wyness Architects
.5°
293
293
Date
USCA
.5°
USCA
113
23.5°
203.5°
Revision Issue
N
Key:
.5°
.5°
N
203.5°
Description
203.5°
203.5°
Date
Client:
23.5°
Client:
113
Revision Issue
Key:
113
.5°
N
Description
Thorne Thorne WynessWyness ArchitectsArchitects
113
23.5°
23.5°
Date
© copyright Thorne Wyness Architects, all rights reserved 2006. Portions may be © Crown Copyright. All rights reserved. Licence No. 100019980
4 120
4
Key:
Key:
Revision Issue
120 Do not scale from this drawing. If Doitnot scale from this drawing. If no dimension is given, is the dimension responsibility of the no recipient to is given, it is the responsibility of the recipient to ascertain the dimension specifically ascertain the dimension specifically from the Architect. All dimensions from the Architect. All dimensions given in relation to existing in relation to existing elements should be given checked on site. The sizing of all elements structuralshould and be checked on site.always The sizing service elements must be of all structural and 293 checked against the service relevantelements must always be .5° engineers drawings.checked against the relevant engineers drawings. If this drawing has been If this drawing has been electronically the Do not scale from transmitted, this drawing. If above transmitted, the above no dimension is given, it iselectronically the statements also apply. statements also apply. responsibility of the recipient to ascertain the dimension © copyright Thornespecifically Wyness © copyright Thorne Wyness from Architects, the Architect. All dimensions all rights reserved 2006. all rights reserved 2006. givenPortions in relation to be existing may © Architects, Crown Portions elements shouldAllberights checked on may be © Crown Copyright. reserved. Copyright. site. The sizingNo. of all structural and All rights reserved. Licence 100019980 Licence service elements must always be No. 100019980 checked against the relevant 293 engineers drawings. .5° If this drawing has been electronically transmitted, the above statements also apply. Do not scale from this drawing. If no dimension is given, it is the responsibility of the recipient to © copyright Thorne Wyness ascertain Architects, all rights reserved 2006.the dimension specifically from the Architect. All dimensions Portions may be © Crown given in relation to existing Copyright. All rights reserved. Licence No. 100019980 elements should be checked on site. The sizing of all structural and service elements must always be checked against the relevant engineers drawings. If this drawing has been electronically transmitted, the above statements also apply.
4 120
4 120
Thermal bridging: Cross-laminated timber DRAFTDRAFT construction entirely wrapped in Kingspan / Filcor resulted in the following Y-values (W/ DRAFT DRAFT mK): External corner -0.033, Eaves -0.017, Building type: Two 89 sqm semi-detached Foundation -0.198, Gable -0.038, Party wall cross-laminated timber houses. 0.010, Ridge -0.026 Location: Ulva Ferry, Isle of Mull Energy bills: Estimated in SAP at £496 per year / £41 per month (for heating, lighting, hot Passive house certification: Meets PHI low water, ventilation but not appliances) & with energy building standard, but not certified. PHPP at £240 per year / £20 per month for space heating only (based on electricity price Space heating demand (PHPP): of 15.4p per kWh, inc VAT but not standing 17.51 kWh/m2/yr (including storage area in roof) charges). Heat load (PHPP): 11.06 W/m2 Ground floor: 150mm Type 1 hardcore sub-base with 50mm sand blinding, followed Primary energy demand (PHPP): above by DPM and 250mm Filcor 45 111kWh/m2/yr under-slab insulation. 200mm concrete structural slab, 22mm particle board on baby Heat loss form factor (PHPP): 4.38 joists as floor finish. 18mm ply to wet rooms. U-value: 0.135 W/m2K Overheating (PHPP): 0% Project Title
Electrical Layout 1.25 @ Drawing A1 Title j037 - 112Drawing No.
1.25 @ A1 Scale
Build-up: Solitex Front Humida breather membrane, followed inside by 120mm Kingspan Kooltherm K12 rigid insulation, on Intello Plus airtightness membrane / vapour check, on 78mm cross-laminated timber panel. U-value: 0.149 W/m2K
Project Title
Drawing Title
USCA housing
Electrical Layout
Drawing No.
j037 - 112 USCA housing First issued Scale 23/11/2016 1.25 @ A1 Electrical Layout
First issued
23/11/2016
- 112 j037 First issued 23/11/2016First issued 23/11/2016 1.25 @ A1
WALLS Timber cladding: 27mm natural Russwood Scotlarch board-on-board timber cladding, on 25x50mm horizontal battens on 25x50mm vertical battens on build up as below. Metal cladding: 3” sinusoidal cladding 0.7mm thick PVC Plastisol coated galvanised steel on 25x75mm vertical battens at 600mm centres with 50x50mm horizontal battens fixed at 600mm centres, with Timco 300INW 8 x 300 wafer head screw on build-up as below.
Roof: Traditional 3” corrugated cladding consisting of 0.7mm thick PVC Plastisol coated galvanised steel externally, with 25x75mm vertical battens at 600mm centres with 50x50mm horizontal battens fixed at 600mm centres, with Timco 300INW 8 x 300 wafer head screw on 180mm Kingspan Kooltherm K7 rigid insulation, on Intello Plus airtightness membrane and vapour check, on 120mm cross-laminated timber panel forming main roof structure or 78mm cross-laminated timber panel kitchen roof structure. U-value: 0.10 W/m2K Windows, external doors & patio doors: Rationel triple glazed Aura windows, 4mm-20mm-4mm-20mm-4mm with argon fill, resting on 87x50mm timber buttress with Extoseal Encors tape to seal window sill and frame to CLT panel. Typical U-values: 0.82 W/ m2K (windows) & 0.87 W/m2K (glazed doors). Heating system: STI flat plate solar thermal collectors with Worldheat Superflow cylinder. Dimplex Q-rad 1kw heater in main space and Ecostrad TR 700W heated electric towel rail to bathrooms. Ventilation: Zehnder CAQ 350 installed by Paul Heat Recovery Scotland with ComfoPipe Plus distribution systems. Summer bypass on systems. PHI certified heat recovery rate of 90%. Water: Restricted waterflow showerheads. 200L water butts in gardens. Private water supply from bore hole and septic tank with infiltration bed. Green materials: Russwood Scotlarch FSC-certified cladding sourced from sustainable forests in Scotland. FSC-certified cross-laminated timber structure by Egoin, timber sourced at factory forest.
ph+ | case study | 41