Kinmore Green OSMP

Page 1

J1801113 023 R Rev11 www.galtenv.com.au 50 Edward Street OSBORNE PARK WA 6017 T: +61 (8) 6272-0200 11 August 2023 Report on ONGOING SITE MANAGEMENT PLAN PROPOSED MIXED-USE DEVELOPMENT STAGES 1B & 2, KINMORE GREEN RESIDENTIAL ESTATE 46 DRIVER ROAD, DARCH Submitted to: Parcel Darch Pty Ltd 1/300 Vincent Street LEEDERVILLE WA 6007

DOCUMENT STATUS

J1801113 023 R Rev11 11 August 2023 Galt Environmental Pty Ltd www.galtenv.com.au 50 Edward Street OSBORNE PARK WA 6017 Page | i ABN: 96 520 810 622
Document Revision Date Amendments 0 7 December 2022 Submitted for client and Auditor review 1 16 March 2023 Revised based on Auditor and DWER comments 2 31 March 2023 Updated based on Auditor comments 3 10 May 2023 Updated based on Auditor comments 4 10 May 2023 Updated based on client comments 5 24 May 2023 Updated based on Auditor comments and additional developer commitments 6 26 May 2023 Updated based on Auditor comments 7 27 June 2023 Updated based on Auditor comments 8 3 August 2023 Updated based on DWER/DoH comments 9 9 August 2023 Updated based on Auditor comments 10 10 August 2023 Updated based on Auditor comments 11 10 August 2023 Updated based on Auditor comments
J1801113 023 R Rev11 11 August 2023 Galt Environmental Pty Ltd www.galtenv.com.au 50 Edward Street OSBORNE PARK WA 6017 Page | ii ABN: 96 520 810 622 TABLE OF CONTENTS 1. Introduction 1 2. Site Description and History........................................................................................................................................1 3. Previous Reports and Supplied Information 2 4. Objectives....................................................................................................................................................................2 5. Site Identification 3 6. Staging Plan 3 7. Site Classification 4 8. Site Conditions 5 8.1 Overview .............................................................................................................................................................5 8.2 Soil 5 8.3 Groundwater.......................................................................................................................................................5 8.4 Landfill Gas 6 9. Ongoing Site Management Strategy ...........................................................................................................................6 9.1 Stages 1B & 2 6 9.1.1 Soil 6 9.1.2 Groundwater 7 9.1.3 Landfill Gas 8 9.1.4 Roles and Responsibilities ...........................................................................................................................10 9.2 Kinmore Green Residential Estate 11 9.2.1 Soil...............................................................................................................................................................11 9.2.2 Groundwater 11 9.2.3 Landfill Gas ..................................................................................................................................................12 9.2.4 Roles and Responsibilities 13 10. Final Conceptual Site Model 14 11. Developer Commitments 14 12. Community Consultation 15 13. Closure ..................................................................................................................................................................15

FIGURES

FIGURE 1: Extent of Stages 1B and 2

FIGURE 2: Extent of Kinmore Green Residential Estate

APPENDICES

APPENDIX A: DEPOSITED PLANS

APPENDIX B: STRUCTURE PLAN

APPENDIX C: PREVIOUS REPORTS

APPENDIX D: AS CONSTRUCTED DRAWINGS – LIMESTONE RAFT AND GRMS

APPENDIX E: RESTRICTIVE COVENANTS

APPENDIX F: LOT PLANS

APPENDIX G: GROUNDWATER AND LANDFILL GAS SAMPLING ANALYSIS AND QUALITY PLAN

APPENDIX H: PARCEL DARCH PTY LTD LETTERS OF COMMITMENT

APPENDIX I: INFORMATION BROCHURE FOR RESIDENTS AND STAKEHOLDERS

APPENDIX J: UNDERSTANDING YOUR REPORT

J1801113 023 R Rev11 11 August 2023 Galt Environmental Pty Ltd www.galtenv.com.au 50 Edward Street OSBORNE PARK WA 6017 Page | iii ABN: 96 520 810 622
Table 1: Site Identification – Kinmore Green 3 Table 2: Roles and Responsibilities – Stages 1B and 2 ......................................................................................................10 Table 3: Roles and Responsibilities – Kinmore Green Residential Estate 13
TABLES

1. INTRODUCTION

This report presents Galt Environmental Pty Ltd’s (Galt’s) ongoing site management plan (OSMP) for Stages 1B & 2 of Kinmore Green Residential Estate located at 46 Driver Road, Darch (the site). Additionally, this OSMP includes ongoing management measures for the overall Kinmore Green Residential Estate.

The overall proposed development comprises construction of residential lots, associated road reserves, public open space (POS) and a commercial precinct.

This plan has been developed to facilitate ongoing management of the site (post construction) in context of the risks associated with historical landfill material at the site. Furthermore, the OSMP has been developed to protect human health by establishing conditions or guidelines for ongoing use of the site in order to protect the gas risk mitigation system (GRMS) which underlies the remediated (‘made ground’) from damage/breaches. The OSMP will be used to guide the ongoing use of the broader site and provide guidance to:

individual lot owners to manage residential/commercial lots; the local government authority (LGA) to manage land parcels including public open spaces (POS)and roads/reserves; and utilities/services and other future workers at the site.

This document must be provided to all (current and future) individual lot owners, responsible parties and body corporates within the Kinmore Green Residential Estate. Furthermore, a Form 6 – Landowner’s Disclosure Before Completion of Land Transaction under Section 68 of the Contaminated Sites Act 2003 must be required to facilitate the change of land ownership.

The structure of the OSMP is in accordance with the Department of Water and Environment Regulation (DWER) (2021) Assessment and Management of Contaminated Sites, under the Contaminated Sites Act 2003 and has been designed for implementation in perpetuity.

This OSMP has been developed specifically for landowners in Stages 1B and 2 and focuses on the responsibility of induvial residential landowners within these stages. Additionally, this OSMP includes management measures to be implemented by the developer, Parcel Darch Pty Ltd. for the overall

Kinmore Green Residential Estate

It should be noted that a separate OSMP is being prepared for the POS. This OSMP will be prepared by Parcel Darch Pty Ltd for City of Wanneroo to sign-off prior to acceptance of the land.

The extent the Stages 1B and 2 with boundary coordinate are shown on Figure 1. Deposited plans for Stages 1B and 2 indicating proposed lot numbers are provided in Appendix A. The extent of the Kinmore Green Residential Estate is shown on Figure 2. The overall Structure Plan for the Estate is provided in Appendix B.

2. SITE DESCRIPTION AND HISTORY

The Kinmore Green Residential Estate forms part of the previous Lot 8000, which incorporated the current Lot 2 (subject site) and the adjacent Lot 1, which is located to the northwest of the subject site.

Lot 2 was originally mined for sand supplies for the building and construction industry. Upon completion of quarrying activities, the site operated as a non-organic waste disposal facility (mainly building rubble). The site has now been entirely filled apart from the adjacent Lot 1 (note: Lot 1 is not considered part of this study).

Progressive filling of Lot 2 began in about 1989, initially in the northeast corner, then along the eastern boundary. The filling process to the west and along the eastern boundary (south of the northeast corner of fill) was inspected on an

J1801113 023 R Rev11 11 August 2023 Galt Environmental Pty Ltd www.galtenv.com.au 50 Edward Street OSBORNE PARK WA 6017 Page | 1 ABN: 96 520 810 622

ongoing basis by Soil and Rock Engineering Pty Ltd (SRE). A section in the southwest corner of the site adjacent Driver Road was also filled under the direction of SRE personnel.

It is understood that the majority of the initial fill was placed in accordance with City of Wanneroo requirements, initially under the guidance of City of Wanneroo personnel, then by SRE for a number of years. We also understand that records for this phase of the work have been lost.

We further understand that the remaining area (southern section) was: progressively filled with non-organic waste processed through a crushing plant; and filled in an engineered manner which involved placing in loose layers up to about 0.5 m thick and compacting using multiple passes of rubber tired and tracked earthmoving equipment inclusive of a rubbish compactor.

The site, with the exception of Stage 1A, is currently classified as Contaminated – remediation required under the Contaminated Sites Act 2003 (the Act). The site was classified under Section 13 of the Act to reflect additional technical information supplied to the Department of Water and Environmental Regulation (DWER) by July 2021. The technical information was outlined in a mandatory auditor’s report (MAR) based on the findings of the 3-part DSI (see Appenidx B for references).

Stage 1A has recently be reclassified as ‘Remediated for restricted use’ with a restriction on abstraction of groundwater for any purpose other than analytical testing.

The site was first classified under Section 13 of the Contaminated Sites Act, 2003 based on information supplied to the Department of Environment and Conservation (DEC) by September 2008.

The aim of the development is to make the site suitable for the proposed use (in context of the existing gas, soil and groundwater conditions) and facilitate reclassification under the CS Act as Remediated for restricted use (RRU) for Stages 1B and 2. It is anticipated that reclassification of future stages to RRU will be achieved following further remedial works and implementation of OSMPs.

3. PREVIOUS REPORTS AND SUPPLIED INFORMATION

A number of previous reports and supplied information have been provided and used during the course of the site investigation and remediation works. The reports are listed in Appendix B.

A copy of the reports above may be obtained by any landowner upon request to Parcel Darch Pty Ltd or by submitting a detailed summary of records (DSR) request through DWER1

4. OBJECTIVES

The objectives of the OSMP are as follows:

provide an appropriate methodology for soil disturbing works across the site i.e. during construction (installation of buried services beneath individual residential/commercial lots) and/or future maintenance/repair works; provide restrictions on excavation depth across the site based on the subsurface conditions; ensure protection of the gas risk mitigation system (GRMS) in order to protect human health by establishing guidelines for ongoing site use; provide recommendations on the use of groundwater beneath the site; and

1 Fees are associated with submitting a DSR search request.

J1801113 023 R Rev11 11 August 2023 Galt Environmental Pty Ltd www.galtenv.com.au 50 Edward Street OSBORNE PARK WA 6017 Page | 2 ABN: 96 520 810 622

to detail the management responsibilities for both Stages 1B and 2 and the Kinmore Green Residential Estate as a whole.

5. SITE IDENTIFICATION

The site location and boundary coordinates of Kinmore Green are shown in Figure 1 and summarised in Table 1

Table 1: Site Identification – Kinmore Green

Site Identification

Street Address 46 Driver Road

Locality Darch, 6065

Legal Identification (Parent Lot) Lot 9000

Local Government City of Wanneroo Boundary Coordinates (MGA 94) See Figure 1

Area (Parent Lot) 24.7 ha

Current Zoning Zoned as ‘Urban Development’ under the City of Wanneroo District Planning Scheme No. 2 (DPS2)

Current Landowner Parcel Darch 2019 Pty Ltd

Proposed Land Use Mixed use residential and public open space (POS)

Stage 1A Lots Lots 186-189, 204-207, 267-276, and 291

Stage 1B Lots Lots 277-288, 254-266

Stage 2A Lots Lots 181-193, 200-203, 208-211

Stage 2B Lots Lot 226-253

Current Site Classification (Stage 1A) Remediated for restricted use

Current Site Classification (balance of the site) Contaminated – remediation required

Proposed Site Classification (Stages 1B and 2) Remediated for restricted use

Deposited plans for Stages 1B and 2 are provided in Appendix A

6. STAGING PLAN

The following lot release for Stages 1 & 2 are as follows:

Stage 1: 43 lots total

o Stage 1A2: 18 Lots (no GRMS required)

o Stage 1B: 23 Lots (GRMS installed)

Stage 2: 45 Lots (GRMS installed)

2 This OSMP is not applicable to Stage 1A of the Kinmore Green development.

J1801113 023 R Rev11 11 August 2023 Galt Environmental Pty Ltd www.galtenv.com.au 50 Edward Street OSBORNE PARK WA 6017 Page | 3 ABN: 96 520 810 622

Lots in Stages 1B and 2 that are underlain by a GRMS are shown on Figure 2 with as-constructed drawings provided in Appendix D

Approximate timing for construction of the various Stages is provided below.

Stage 3, 4 and part of 7 – Q3/Q4 2023

Group housing site – Q4 2023

Stage 3 civil works – Q1/Q2 2024

Stage 4 civil works – Q3/Q4 2024

Stage 5, 6, and part of 7 – Q2 2024

Commercial precinct – Q3/Q4 2024

Stage 5 civil works – Q1 2025

Stage 6 civil works – Q3 2025

Stage 8 and 9 – timing unknown as reliant on interface with Lot 1 Driver

Road works

Future lot releases will be outlined at the time of the stage release by the developer and updated in a separate OSMP for prepare for each area accordingly.

7. SITE CLASSIFICATION

The DWER contaminated sites database indicates that the majority of the Kinmore Green Residential Estate is classified as ‘Contaminated – remediation required’ as of November 2022 Stage 1A has recently be reclassified as ‘Remediated for restricted use’ with a restriction on abstraction of groundwater for any purpose other than analytical testing.

Galt Environmental (2022b) has been developed to facilitate construction at the site to a level which will result in the Stages 1B and 2 being classified as ‘Remediated for restricted use’ under the CS Act 2003 A copy of the revised DSR will be provided once the site has been reclassified.

It is anticipated that the following memorials on title (MoT) will be applicable to each lot within Stages 1B and 2

Groundwater Abstraction

Ground water abstraction of the underlying aquifer is prohibited on each of the development Lots. This includes and not limited to ground water bores used for reticulation or irrigation within a Lot and/or groundwater abstraction for human consumption.

Excavations

Excavations or intrusive works are limited to the top 2.0 m of the soil profile. Excavations below this level are not permitted due to the presence of the GRMS and the risk of potential damage to the membrane (thus presenting a hazard to human health via vertical gas migration) Excavation to a maximum depth of 2.0 m will ensure there is a minimum of 0.2 m of in situ material over the upper level of the GRMS at all times. All ground disturbing activities are limited to the excavation restrictions, including the following commonly undertaken on residential sites:

gardening; underground installations (e.g. water connections, swimming pools, additional soak wells footings for patios/pergolas or similar); and repairs and maintenance (typically services)

J1801113 023 R Rev11 11 August 2023 Galt Environmental Pty Ltd www.galtenv.com.au 50 Edward Street OSBORNE PARK WA 6017 Page | 4 ABN: 96 520 810 622

No Build Zone

All lots within Stages 1B and 2 have a 1 m wide ‘no build zone’ at the rear of the property (or in a few instances, a side boundary). This area is to be keep free of all habitable structures and sealed surfaces. This area is to remain as a passive venting zone in perpetuity.

8. SITE CONDITIONS

8.1 Overview

A summary of site soil, groundwater and landfill gas conditions relevant to this OSMP are presented in the following sections.

8.2 Soil

All residential lots within Stages 1B and 2 are underlain by a minimum of 2.2 m of sand capping material to create an effective barrier between uncontrolled fill and sensitive receptors.

A limestone raft co-located with a gas risk mitigation system (GRMS) has been constructed at a depth not less than 2.2 m below finished lot levels. The limestone raft has been constructed to ensure the site is geotechnically suitable in context of the proposed development

Previous studies indicate that uncontrolled fill has been shown to be present across large portions of the site. However, the pathway between onsite sources and receptors has been removed through construction of the limestone raft, installation of GRMS, and placement of a 2.2 m thick sand capping layer. As such, the presence of potential contaminants within the uncontrolled fill is not considered to present a risk to onsite receptors.

The as-constructed drawings showing the location of the limestone raft are shown in Appendix D.

8.3 Groundwater

Galt Environmental (2021b) indicates:

the groundwater flow direction is south southwest; dissolved metals (arsenic, boron, copper, iron, mercury, nickel, zinc) exceeded the freshwater (FW) criteria at the majority of monitoring wells;

sulfate, dissolved metals (arsenic and nickel), and PFHxS plus PFOS exceeded the relevant drinking water (DW) criteria at a number of locations across the site; dissolved iron exceeded the short-term irrigation (STI) criterion of 10 mg/L at MW04; concentrations of dissolved arsenic and nickel exceeded the STI criteria during the first groundwater monitoring event (GME) but were either below the laboratory LOR or conformed to the adopted criteria during the second GME;

groundwater at the site is not considered to present a risk to the environment in the context of the proposed land use;

groundwater at the site is not considered suitable for use as a drinking water source or for domestic irrigation; and

groundwater at the site is considered suitable for irrigation of POS.

The classification of the site under the Contaminated Sites Act 2003 restricts the use of groundwater within residential and commercial lots for any purpose other than for analytical testing

J1801113 023 R Rev11 11 August 2023 Galt Environmental Pty Ltd www.galtenv.com.au 50 Edward Street OSBORNE PARK WA 6017 Page | 5 ABN: 96 520 810 622

8.4 Landfill Gas

Galt Environmental (2021a) indicates there are elevated concentrations of methane and carbon dioxide in the ground primarily attributed to the green waste (grass) contained within the construction and demolition waste and sand fill, but there is no evidence of large-scale pressure driven (advective) flow (evidenced by the extensive gas monitoring data). Importantly, there is no evidence of material that could drive gas out of the ground in large volumes. This conclusion is consistent with the nature of the material, the gas generation assessment (reported separately) and lack of significant lateral migration.

The assessment indicates the on-site future landfill gas risks across the entirety of the Kinmore Green Residential Estate fall within a Very Low and Low risk regime. Despite the gas generation assessment suggesting slightly higher vertical gas emissions, the quantitative gas modelling showed equilibrium indoor methane concentrations are unlikely to exceed the adopted action level (5,000ppm) even without any building gas protection measures.

Other key risk considerations identified in the conceptual site model (namely, potentially higher landfill gas regimes via barometric pumping and sensitivity of the proposed development) indicates the potential for unacceptable gas intrusion risks only where the proposed buildings are constructed directly above the landfill waste materials. It was therefore recommended that gas protection measures be installed beneath future residential buildings only where the buildings are located above landfill waste materials. The gas protection measures included one level of protection (i.e., a geomembrane) in addition to the sand cap, which will, in practice, behave as a biocover. To minimise opportunity for future tampering, a single deep geomembrane barrier has been installed rather than protection measures in each building.

The Structure Plan for the Kinmore Green Residential Estate has been endorsed by the Western Australian Planning Commission (WAPC) and administered City of Wanneroo. No amendments to this scheme, such as changing the area dedicated to public open space, can be considered without review and endorsement of WAPC on advice from key regulatory agencies such as DWER. Therefore, it is not envisaged that the built form of the Estate will in any way change from the approved plan. As such, the main venting zone through the POS will always remain in place ensuring that the overall gas regime does not adversely impact surrounding residents.

9. ONGOING SITE MANAGEMENT STRATEGY

9.1 Stages 1B & 2

9.1.1 Soil

Stages 1B and 2 will be suitable for residential purposes following completion of the remediation works. The ongoing site management measures required are as follows:

Excavation for development of individual residential lots is limited to the upper 2.0 m of the soil profile (providing a separation of 0.2 m to the GRMS at all times). This includes excavation for services and any accessory development features such as swimming pools, spas, soakwells etc. We note that basement garages or similar would likely be not achievable based on the permissible excavation depth.

No penetration of the GRMS is permitted for any purpose.

All municipal services for Stages 1B and 2 will be installed within the upper 2 m of the soil profile eliminating the need for maintenance or repair works close to or below the GRMS.

Registration of a Restrictive Covenant on all Lots within Stages 1B and 2 by Landgate relating to ground disturbing works on each certificate of title of lots. This is to ensure the current and future landowners (if any) are aware of the restrictions relating to planning/development at their sites. Furthermore, the restrictive covenant will be incorporated into LGA planning systems, thereby restricting approval of unsuitable

J1801113 023 R Rev11 11 August 2023 Galt Environmental Pty Ltd www.galtenv.com.au 50 Edward Street OSBORNE PARK WA 6017 Page | 6 ABN: 96 520 810 622

development features that may interfere with the GRMS. The restrictive covenant will also ensure that the there are no significant changes to finished lot levels across the site and thereby preserve the separation of buildings from the GRMS.

As demonstrated in the development specific landfill gas risk assessment (DSLFGRA), the on-site future landfill gas risks across the entirety of the Kinmore Green Residential Estate fall within a Very Low and Low risk regime. As such, minor excavations for features such as swimming pools, spas, soakwells within the sand cap are acceptable. We also note that the Restrictive Covenant will remain on title information in perpetuity and cannot be lifted.

It is noted that soakwell construction will be undertaken in accordance with the Urban Water Management Plan (UWMP) (Urbaqua, 2021) prepared for the site and endorsed by the City of Wanneroo on advice from DWER. The UWMP shows soakwells installed directly into the sand cap with separation from the GRMS. The soakwells are only backfilled with lot-derived sand.

Given the soakwells are:

i. installed above the GRMS;

ii. backfilled with lot-derived sand; and

iii. outside the building footprint on each lot;

it is not considered possible for preferential LFG pathways to exist.

Further noted in the UWMP, the limestone rafts between lots are graded at 1:100 slope towards the road reserve to prevent any ponding of infiltrated water on top of the GRMS.

9.1.2 Groundwater

Given that groundwater beneath the Stages 1B and 2 is not considered suitable for drinking water or residential irrigation purposes, registration of a memorial with Landgate restricting groundwater abstraction will be place on each certificate of title of lots sold within the residential portion of the site. This is to ensure the current and future landowners (if any) are aware of the restrictions relating to using groundwater from the superficial aquifer for domestic purposes at their sites. Furthermore, the memorial will be incorporated into regulatory databases and water extraction licencing systems preventing approval of extraction bores across the site.

A groundwater monitoring program will be implemented to ensure:

concentrations of COPC in groundwater remain, at a minimum, consistent 3with the current understanding of groundwater quality beneath the site; and short- and long-term protection of identified receptors from COPC in groundwater.

Ongoing groundwater monitoring will also provide additional information relating to the suitability of groundwater for beneficial uses

The methodology for groundwater monitoring is presented in a sampling analysis and quality plan (SAQP) provided in Appenidx G.

3 Fluctuations of field parameters and laboratory results are highly likely due to the heterogeneous nature of the superficial aquifer and interaction of groundwater with the overlying landfill waste mass

J1801113 023 R Rev11 11 August 2023 Galt Environmental Pty Ltd www.galtenv.com.au 50 Edward Street OSBORNE PARK WA 6017 Page | 7 ABN: 96 520 810 622

9.1.3 Landfill Gas

As demonstrated in DSLFGRA, the on-site future landfill gas risks across Stages 1B and 2 fall within a Very Low and Low risk regime.

The DSLFGRA identified that there are elevated concentrations of methane and carbon dioxide in the ground primarily attributed to the green waste (grass) contained within the construction and demolition waste and sand fill, but there is no evidence of large-scale pressure driven (advective) flow (evidenced by the extensive gas monitoring data). Importantly, there is no evidence of material that could drive gas out of the ground in large volumes. This conclusion is consistent with the nature of the material, the gas generation assessment (reported separately) and lack of significant lateral migration.

The risk assessment gas generation model indicated that slightly higher vertical gas emissions were possible. However, the quantitative gas modelling showed equilibrium indoor methane concentrations are unlikely to exceed the adopted action level (5,000ppm) even without any building gas protection measures.

In Stages 1B and 2, a GRMS has been locally (to alter the vertical migration of landfill gas such that it is directed away from building footprints within each lot. The GRMS has been designed such that there is a passive venting zone at the rear of each lot(s) over which the main building is not permitted to be constructed under a Restrictive Covenant that has been placed on the lots. This will ensure that the site-wide gas regime is not materially changed.

Information provided to landowners in Stages 1B and 2 includes the following:

Lot plan indicating the location of the GRMS beneath the lot ;

A 1 m wide ‘No build zone’ required for passive venting typically at the rear of each lot

Maintaining the broad soil type within the setback and road reserves i.e. ensuring that sand (as described by AS 1726) is the primary fill material.

Maintaining the 2.2 m separation from the underlying GRMS.

This information is provided in a brochure that will be provided to all residents within Stages 1B and 2 and on lot plans provided to each purchaser at the time of signing a sales contract

A copy of the restrictive covenant is provided in Appendix E. Lot plans showing the geomembrane and passive venting zones for all lots covered by this OSMP are provided in Appendix F

GRMS Location

A drawing showing the general cross section of the GRMS is shown in Inline Image 1 below. As-constructed survey drawings showing the location and extent of the GRMS including the passive venting zones (i.e. portions of the lots not underlain by a GRMS) are shown in Appendix D The GRMS QA validation report is separately provided as part of the remediation and validation report (RVR) (available from Parcel Darch Pty Ltd upon request or from DWER via a detailed summary of records search).

J1801113 023 R Rev11 11 August 2023 Galt Environmental Pty Ltd www.galtenv.com.au 50 Edward Street OSBORNE PARK WA 6017 Page | 8 ABN: 96 520 810 622

Inline Image 1: Site Remediation and GRMS Installation

GRMS Breach

For the purposes of this OSMP, breaches of the GRMS will be categorised as follows:

Type 1 Breach: a small partial or full penetration of the cushion geotextile, geomembrane and separation geotextile layers (as shown in Inline Image 1 above) outside the building envelope.

Type 2 Breach: a small partial or full penetration of the cushion geotextile, geomembrane and separation geotextile layers within the building footprint.

If a Type 1 breach to the GRMS does occur (in contravention of this OSMP, restrictive covenant, and CoT memorial), it is not anticipated that repair of the membrane will be required due to the following:

very low and low gas risk shown to be present at the site; and the breach will have occurred outside any habitable areas during excavation for a swimming pool and/or installation of an irrigation bore.

In the event of a Type 2 breach of the GRMS, Parcel Darch Pty Ltd, in consultation with the landowner, will be responsible for assessment, management, and remediation (if required) of the GRMS. If required, a targeted risk assessment will be undertaken to characterise whether the breach represents a risk to human health prior to repairs and/or remediation being undertaken. The outcomes of this risk assessment and/or repairs/remediation will be provided to DWER, and the Auditor as required.

Any breach of the GRMS (Type 1 or Type 2) must be reported to Parcel Darch Pty Ltd, the Auditor, and DWER. DWER must be contacted within 24 hours via their 24-hour hotline (1300 762 982) or via email at info@dwer.wa.gov.au

Landfill Gas Verification Monitoring

Following installation of the GRMS, temporary landfill gas monitoring wells will be installed at selected locations targeting the following:

immediately above the GRMS typically within a lot; passive venting zones typically at lot boundaries; and in selected utility boxes (e.g. Telstra pit).

A SAQP addressing LFG verification monitoring is presented in Appendix G and the purpose discussed briefly below.

J1801113 023 R Rev11 11 August 2023 Galt Environmental Pty Ltd www.galtenv.com.au 50 Edward Street OSBORNE PARK WA 6017 Page | 9 ABN: 96 520 810 622

The purpose of the LFG verification monitoring is to:

1. Provide additional verification that the GRMS has been correctly installed whereby negligible concentrations of CH4 or CO2 are detected.

2. Verify that the passive venting zones are functioning as intended whereby CH4 and CO2 should be detected at concentrations consistent with the pre-development LFG regime.

3. Demonstrate that LFG is not accumulating in utility boxes/trenches that may be accessed by maintenance workers.

Once it has been established that the GRMS has been installed correctly and functioning as intended (demonstrated by the verification monitoring outlined above) the Stage-specific monitoring will cease.

9.1.4 Roles and Responsibilities

The roles and responsibilities for implementation of the OSMP for Stages 1B and 2 are detailed in Table 2 below.

Table 2: Roles and Responsibilities – Stages 1B and 2

Landowner Provision of OSMP to contractors

Landowner Maintaining rear setbacks and soil types remaining consistent with aspurchased lots to ensure passive venting.

No excavation below 2 m

No installation of domestic irrigation bores

All contractors engaged to undertake works at the site involving ground distrubance

Prior to undertaking any ground disturbing works

Landowner Reporting of damage to the GRMS Parcel Darch Pty Ltd, DWER, and Auditor Within 24 hours of identifying damage to the GRMS

Parcel Darch Pty Ltd

Advice and repairs to the GRMS (where breach occurs)

Regulatory Authorities Advice to site owners in the event of damage to the GRMS

Parcel Darch Pty Ltd

Verification LFG monitoring following installation of GRMS

Parcel Darch Pty Ltd

DWER

and Auditor

Within 3 months of completion of GRMS

J1801113 023 R Rev11 11 August 2023 Galt Environmental Pty Ltd www.galtenv.com.au 50 Edward Street OSBORNE PARK WA 6017 Page | 10 ABN: 96 520 810 622
Responsibility Item To Whom Timing
City
As
City
As
Landowner
City
As
of Wanneroo via building approvals
required Landowner
of Wanneroo via building approvals
required
of Wanneroo via building approvals
required
Landowner,
As
4
Landowner
DWER, and Auditor
soon as practicable
As soon as practicable
Auditor
Implementation of additional remediation measures should post development monitoring indicate an unacceptable risk to human health on or off-site with the intent of ensuring that buildings within and adjacent to the development are suitable for occupation. Immediately
4 A site inspection or provision of photographs may be required prior to providing advice and/or effecting repair(s) to the GRMS.

9.2 Kinmore Green Residential Estate

9.2.1 Soil

A separate OSMP will be developed for the POS and subsequent stages of Kinmore Green Residential Estate. The key mitigation and management measures relating to soil (primarily ACM) in the POS and road reserves are as follows:

ensuring the 1 m sand cap is maintained and regularly inspected across the entirety of the POS; excavations below 1 m which may encounter uncontrolled fill being undertaken in accordance with a taskspecific risk assessment; and reinstatement of the 1 m sand cap following excavations below 1 m is undertaken in a controlled manner such that uncontrolled fill is not inadvertently entrained shallower in the soil profile; road reserves will not be widened beyond that shown in the structure plan; and excavation below 2 m in the road reserves will be undertaken in accordance with a task-specific management plan to ensure uncontrolled fill (if encountered) is appropriately managed.

9.2.2 Groundwater

Given that groundwater beneath the Kinmore Green Residential Estate is not considered suitable for drinking water or residential irrigation purposes, registration of a memorial with Landgate restricting groundwater abstraction will be place on each certificate of title of lots sold within the residential portion of the site. This is to ensure the current and future landowners (if any) are aware of the restrictions relating to using groundwater from the superficial aquifer for domestic purposes at their sites. Furthermore, the memorial will be incorporated into regulatory databases and water extraction licencing systems preventing approval of extraction bores across the site.

It should be noted that an irrigation bore is proposed for the POS.

Implementation of a groundwater monitoring program across the Kinmore Green Residential Estate is required to ensure:

concentrations of COPC in groundwater remain, at a minimum, consistent 5with the current understanding of groundwater quality beneath the site; and short- and long-term protection of identified receptors from COPC in groundwater.

Ongoing groundwater monitoring will also provide additional information relating to the suitability of groundwater for beneficial uses (i.e. irrigation of POS).

The methodology for groundwater monitoring is presented in a sampling analysis and quality plan (SAQP) provided in Appenidx G

5 Fluctuations of field parameters and laboratory results are highly likely due to the heterogeneous nature of the superficial aquifer and interaction of groundwater with the overlying landfill waste mass

J1801113 023 R Rev11 11 August 2023 Galt Environmental Pty Ltd www.galtenv.com.au 50 Edward Street OSBORNE PARK WA 6017 Page | 11 ABN: 96 520 810 622 Responsibility Item To Whom Timing Parcel Darch Pty Ltd Ongoing LFG monitoring until CS1 rating achieved for 12-month period Auditor Monthly with annual reporting Parcel Darch Pty Ltd
DWER and Auditor Biannually (twice per year)
Implementation of a groundwater monitoring program across the Kinmore Green Residential Estate

9.2.3 Landfill Gas

A separate OSMP will be developed for the POS and subsequent stages of Kinmore Green Residential Estate. The key mitigation and management measures relating to LFG across Kinmore Green Residential Estate are as follows:

maintaining the area designated as public open space to remain open including no paving or enclosed structures;

maintaining the broad soil type within road reserves and the public open space i.e. ensuring that sand (as described by AS 1726) is the primary fill material to facilitate passive venting of the landfill mass; and no widening of road reserves that may impact on passive venting zones.

The Structure Plan for the Kinmore Green Residential Estate has been endorsed by the Western Australian Planning Commission (WAPC) and administered City of Wanneroo. No amendments to this scheme, such as changing the area dedicated to public open space, can be considered without review and endorsement of WAPC on advice from key regulatory agencies such as DWER. Therefore, it is not envisaged that the built form of the Estate will in any way change from the approved plan.

Long-Term Landfill Gas Monitoring

We note that ongoing LFG monitoring across the Kinmore Green Residential Estate will be ongoing until completion of the development and ceased upon agreement with the Auditor and relevant stakeholders. The ongoing LFG monitoring program has been designed to ensure that the overall gas regime is not significantly altered by remedial works in the residential and commercial precincts, specifically the installation of the GRMS.

The key design elements that aim to ensure the site-wide gas regime is not altered are:

1. Ensuring the overall design of Kinmore Green Residential Estate is not significantly changed; and

2. Ensure the GRMS is installed in designated areas (i.e. beneath residential lots) with sufficient passive venting capabilities.

As noted in Section 9.2.4, the Structure Plan cannot be amended without endorsement from WAPC on advice from regularly agencies such as DWER. As such, the main venting zone through the POS will always remain in place ensuring that the overall gas regime does not adversely impact surrounding residents. The long-term LFG monitoring program detailed in the SAQP has been designed such that any changes to the LFG regime will be identified in a timely manner and remedial measures, as committed to by Parch Darch Pty Ltd (see Section 12), will be put in place if required.

Additional Landfill Gas Mitigation Measures (if required)

In the event that long-term LFG monitoring results indicate that one or more of the following are occurring:

the gas regime in the sand cap is trending towards higher methane or carbon dioxide concentrations with values exceeding:

o 1% v/v methane6; or

o 5% v/v carbon dioxide6; there are indications of lateral gas migration towards surrounding residential properties as evidenced by any borehole flow greater than 1 L/hr

Parcel Darch Pty will immediately undertake a risk assessment to quantify the health risk posed to onsite and offsite residents. If the assessment determines that additional gas risk mitigation is required beyond the existing geomembrane

J1801113 023 R Rev11 11 August 2023 Galt Environmental Pty Ltd www.galtenv.com.au 50 Edward Street OSBORNE PARK WA 6017 Page | 12 ABN: 96 520 810 622
6 Values adopted from CIRIA C665 Modified Wilson and Card (Table 8.5) classification for consideration to increase classification from CS1 to CS2.

and sand cap, Parcel Darch Pty Ltd will be responsible for designing and implementing these mitigation measures. When determining additional gas risk mitigation systems, the following factors would need be considered:

a large number of lots are likely to have completed homes on them or are in the process of being built on; access to private lots is likely to be limited; and the additional mitigation measures may need ongoing management and/or maintenance.

Based on these factors, it is considered that the following measures are considered potentially feasible for additional gas risk mitigation:

installation of gas collection trenches within road verges, and passive or active venting in safe locations; installation of additional geomembrane layers within future stages yet to be built; and injection of low permeability grout into designated areas to prevent lateral gas migration.

It should be noted that the options listed above are not exhaustive and additional mitigation measures may be considered based on the outcomes of the health risk assessment.

Workplace Health and Safety Requirements for Maintenance Workers

It is not anticipated that there will be any unacceptable risk to onsite maintenance workers within the Kinmore Green Residential Estate. Notwithstanding, workplace health and safety (WHS) controls for maintenance workers conducting works on underground services will be managed as per the approved Code of Practice – Confined Spaces authorised under Section 274 of the Work Health Safety Act 2020.

Under the Code of Practice, confined space entry controls must be implemented by the persons conducting a business or undertaking (PCBU). The controls include the issuing of a permit for confined space entry. It is noted that that a determination of whether works comprise confined space entry is the responsibility of the PCBU. However, entry to any excavation greater 1.5 m deep (which is the most likely scenario at the site) would likely be classified as confined space and as such, appropriate controls must be in place. In this instance, the PCBU would need to have their own confined space entry procedures which would be compliant with the Code of Practice.

9.2.4 Roles and Responsibilities

The roles and responsibilities for implementation of this management plan for the Kinmore Green Residential Estate are outlined in Table 3

Implementation of additional remediation measures should post development monitoring indicate an unacceptable risk to human health on or off-site with the intent of ensuring that buildings within and adjacent to the development are suitable for occupation.

J1801113 023 R Rev11 11 August 2023 Galt Environmental Pty Ltd www.galtenv.com.au 50 Edward Street OSBORNE PARK WA 6017 Page | 13 ABN: 96 520 810 622
Responsibility Item To Whom Timing Parcel Darch Pty Ltd Ongoing LFG monitoring until CS1 rating achieved for 12-month period Auditor Monthly with annual reporting Parcel Darch Pty
Table 3: Roles and Responsibilities – Kinmore Green Residential Estate
Ltd
Auditor and Regulatory Authorities Immediately

Parcel Darch Pty Ltd

Ensuring the overall design of the development (i.e. location of residential precincts, POS, commercial, etc.) does not materially change.

Parcel Darch Pty Ltd

Implementation of a groundwater monitoring program across the Kinmore Green Residential Estate

10. FINAL CONCEPTUAL SITE MODEL

Following successful implementation and validation of remedial works across the site, a final conceptual site model (CSM) has been developed to demonstrate that risks to onsite and offsite residents, public open space users, and maintenance works are appropriately managed.

The final CSM is presented in Inline Image 1 below.

11. DEVELOPER COMMITMENTS

Parcel Darch Pty Ltd has committed to the following:

ongoing monitoring until a characteristic situation (CS) 1 rating is achieved for a 12-month period within each stage; and

additional remediation measures should post-development monitoring demonstrate an unacceptable risk to human health on or off-site with the intent of ensuring that buildings within and adjacent to the development are suitable for occupation.

These commitments have been made to DWER and are considered binding for the duration of the project. The letters outlining specific developer commitments from Parcel Darch Pty Ltd are provided in Appendix H.

J1801113 023 R Rev11 11 August 2023 Galt Environmental Pty Ltd www.galtenv.com.au 50 Edward Street OSBORNE PARK WA 6017 Page | 14 ABN: 96 520 810 622 Responsibility Item To Whom Timing
City of Wanneroo/DWER As required
DWER and Auditor Biannually (twice per year)
Inline Image 1: Final Conceptual Site Model

12. COMMUNITY CONSULTATION

In order to ensure that the obligations of the OSMP are understood by future landowners, a simple information brochure has been prepared by the developer. A copy of this brochure will be provided to all landowners, the City of Wanneroo and other relevant stakeholders. Additionally, a copy of the brochure will be available on the Kinmore Green website. A copy of the brochure is provided in Appendix I.

In addition, Parcel Darch Pty Ltd will provide a Form 6 to the purchasers of each lot with copies lodged with DWER. This is a requirement under Section 68 of the Contaminated Sites Act 2003.

13. CLOSURE

We draw your attention to Appendix I of this report, “Understanding Your Report”. The information provided within is intended to inform you as to what your realistic expectations of this report should be. This information is provided not to reduce the level of responsibility accepted by Galt, but to ensure that all parties who rely on this report are aware of the responsibilities each assumes in so doing.

GALT ENVIRONMENTAL PTY LTD

https://galtgeo.sharepoint.com/sites/WAG180113/Shared

J1801113 023 R Rev11 11 August 2023 Galt Environmental Pty Ltd www.galtenv.com.au 50 Edward Street OSBORNE PARK WA 6017 Page | 15 ABN: 96 520 810 622
Documents/01 Parcel Advice/03 Correspondence/J1801113 023 R Rev10.docx
C O P Y R G H T 2 0 2 3 T H S F G U R E A N D T S C O N T E N T S R E M A N S T H E P R O P E R T Y O F G A LT E N V R O N M E N TA L P T Y LT D A N D M AY N O T B E R E P R O D U C E D W T H O U T P R O R A P P R O VA L T H S F G U R E S H O U L D B E R E A D N C O N U N C T O N W T H T H E A C C O M PA N Y N G R E P O R T ACN Tel A d ress :161708998 :+61(0)86272-0200 GaltEnv ironm entalPtyLtd :50E war Street Os ornePark W A6017 A Re Fi No CL E NT PROJECT LOCAT ON T TLE Job No PAR CEL DARC H PT Y LT D ONGOING SITEM ANAGE M ENT PLAN STAGE1B&2 STAGES1B&2KIN M OREGREEN RESIDENTIAL ESTATE SITEANDLOCATION PLAN FIGURE1 J1801113-023 SCALE DRA N CHECKED DATEDRA N DATECHECKED GDA1994 GAZ one50 PROJECTION CED (A3) 31/3/2023 E:391446 N:6480039 E:391241 N:6480037 E:391241 N:6480120 E:391084 N:6480120 E:391084 N:6480195 E:391241 N:6480188 E:391440 N:6480201 E:391440 N:6480117 STAGE 02A 10012 m 2 STAGE 01B 15544 m 2 STAGE 02B 14734 m 2 391,200 391,200 391,400 391,400 6 4 8 0 0 0 0 6, 4 8 0, 0 0 0 6 4 8 0 2 0 0 6, 4 8 0, 2 0 0 hT e B r oadview Kingsway Furn ss Rd Mirrabooka Av E v a n d a l e R d M o s e y S t D r i v e r R d R a n g e v i e w R d PE RT H Avon River Wa nn eroo SITE LOCATION Legend SiteBound ary Stag eBound ary 0 20 4 60 80 10 Me s O o b 2 0 1 8 J 1 8 0 3 - P a c e A d v c e D a 0 9 G S 0 4 M X D 0 2 3 J 1 8 0 111 3 - 0 2 3 - O S M P - 0 0 1 m x d C a e D o e 3 1 3 2 0 2 3 11 0 2 4 2 A M 1:1500 NOTES A e a m a g e r y a n d C a d a s e s o u c e d r o m L a n d g a e / S L P
C O P Y R G H T 2 0 2 3 T H S F G U R E A N D T S C O N T E N T S R E M A N S T H E P R O P E RT Y O F G A LT E N V R O N M E N TA L P T Y LT D A N D M AY N O T B E R E P R O D U C E D W T H O U T P R O R A P P R O VA L T H S F G U R E S H O U L D B E R E A D N C O N U N C T O N W T H T H E A C C O M PA N Y N G R E P O R T ACN Te l A re ss :161708998 :+61(0)86272-0200 GaltEnv ronm e ntalPtyLt :50E w ard Stre e t Osborn Park A6017 SCALE DRA N CHECKED DATEDRA N DATECHECKED GDA1994 GAZ one 50 PROJECTION BP 10/08/2023 DAC (A3) 10/08/2023 STAGE 01C STAGE 02A STAGE 08 STAGE 09 STAGE 01Commercial STAGE 03 STAGE 04 STAGE 05 STAGE 06 STAGE 07 STAGE 01-POS STAGE 01A STAGE 01B STAGE 02B 391,200 391,200 391,400 391,400 391,600 391,600 391,800 391,800 6 4 8 0 0 0 0 6 4 8 0 2 0 0 6, 4 8 0, 2 0 0 6 4 8 0 4 0 0 6, 4 8 0, 4 0 0 6 4 8 0 6 0 0 6, 4 8 0, 6 0 0 R a n g e v i e w R d K ngsway Furn ss Rd D r i v e r R d Abbotswo o Dd r E v a n d a l e R d M i r r a b o o k a A v Queen sway R d Gnangara R d Hart m a n D r The Broadview PE RTH Avon River Wa nneroo S TE LOC ATION Legend Ste Bound ary Stag e Bound ary LotBound arie s 0 40 0 20 1 0 2 0 Me s O o b 2 0 1 8 J 1 8 0 1 3 - P a c A v c e D a c 0 9 G S 0 4 M X D 2 3 R 1 J 1 8 0 111 3 - 0 2 3 - O S M P -0 0 2 m x D a m o n C a 0 0 8 2 0 2 3 3 2 2 0 P M 1:2,500 NOTES A e a m a g e r y a n d C a d a s e s o u c e d r o m L a n d g a e S L P A R v FgNo CL EN T PROJECT LOCAT ON T TLE Job No PARC EL DARCH PTY LTD ONGOING SITEM ANAGE M ENT PLAN STAGE1B&2 STAGES1B&2KIN M OREGREEN RESIDENTIAL ESTATE ONGOING SITEM ANAGE M ENT PLAN FIGURE2 J1801113

Appendix A: Deposited Plans

Galt Environmental Pty Ltd www.galtenv.com.au 50 Edward Street OSBORNE PARK WA 6017 ABN: 96 520 810 622
www.veris.com.au (08) 6241 3333 VERIS Tenure Type Plan Type Plan Purpose Freehold Deposited Plan Subdivision LOTS 254-266, 277-288, 9002, ROADS, EASEMENTS & RESTRICTIVE COVENANT Locality Darch Local Government City of Wanneroo Plan Heading Locality & Local Government Plan Information Survey Certificate - Regulation 54 I, hereby certify that this plan is accurate and is a correct representation of the(a) survey; and (b) calculations from measurements recorded in the field records, written law(s) in relation to which it is lodged. undertaken for the purposes of this plan and that it complies with the relevant Date Licensed Surveyor Department of Planning, Lands and Heritage File Number Former Tenure New Lot / Land Parent Plan Number LOTS 254-266, 277-288 & 9002 DP 423249 Parent Lot Number Lot 9003 Title Reference Subject Land Description Field Records Area Declared as Special Survey Yes Survey Details Name Address Phone VERIS MT HAWTHORN 6915 6241 3333 Survey Organisation Fax 6241 3300 Email lodgements.wa@veris.com.au Reference 635744-S01B-LJG Subject New Interests Purpose Statutory Reference Origin Land Burdened Benefit To Comments Examination Date Examined Planning Authority WAPC Reference Planning Approval Delegated under S. 16 P&D Act 2005 Date In Order For Dealings Subject To For Registrar of Titles Date Plan Approved Inspector of Plans and Surveys Date Survey and Plan Notation 1 421605 DEPOSITED PLAN OF ADDITIONAL SHEETS Survey Sheet(s) VERSION NUMBER SHEET SHEETS 5 2 33a A V:\PROJECTS\06\635\635744\04-Spatial\SD\DP421605-S01B-635744dp4\DP421605-S01B-635744dp4.dgn driver_rd-6-20220608-dp3.acs FP-635744-012-VER 1.0 Survey Method Regulatory Statement position and type of all survey marks placed for this plan. Guidelines. See survey sheet(s) to determine the true final Survey carried out under Reg. 26A Special Survey Area Laurence John Gatti REG 26A (4) 151468 Limited in Depth to 609.6 metres. 159333 (Drainage) Easement Reg 33(a) Sec 167 of the P & D Act This Plan Lot 9002 City of Wanneroo 33a B Subject Former Tenure Interests and Notifications Purpose Statutory Reference Origin Land Burdened Benefit To Comments (Drainage) Easement (Sewerage) Easement Reg 33(a) Sec 167 of the P & D Act Reg 33(b) Sec 167 of the P & D Act DP 423249 DP 423249 Lot 9002 Lot 9002 City of Wanneroo Water Corporation 33a C 33b A Covenant Restrictive Sec 136D of the TLA This Plan & Doc Lot 9002 All Lots Except Lot 9002 All lots Except surface AHD levels. Refer to the document for finished installation of groundwater bores. includes excavation/drilling for permitted within this lot. This from the finished surface is not Excavation below a depth of 2m boundary of this Lot. allowed within 1m of the rear No development or construction is Covenant Restrictive Sec 129BA of the TLA Lot 9002 Doc Corporation Electricity Networks Fire Separation F Subject New Notifications and Memorials Purpose Statutory Reference Origin Land Burdened Benefit To Comments Corporation (Noise) Electricity Networks Lot 9002 Doc Sec 70A of the TLA Notification N Memorial Notification Notification Partially modified by Doc Remediation required Contaminated sitePartially modified by Doc has occurred on parts of lot) City of Wanneroo (Uncontrolled filling Partially modified by Doc has occurred on parts of lot) City of Wanneroo (Uncontrolled filling Regulation and Environmental Department of Water Lot 9002 Doc O898012 Doc L796683 Doc K192639 Lot 9002 Lot 9002 Contaminated Sites Act 2003 Sec 70A of the TLA Sec 70A of the TLA Memorial Contaminated Sites Act 2003 Doc Lot 9002 All Lots Except Regulation and Environmental Department of Water Remediated for restricted use Amendments Version Lodgement Type 2 Replacement Amendment Description Interests and Notifications added Date 26/4/2023 Authorised By L. J. Gatti
www.veris.com.au (08) 6241 3333 VERIS 9002 211 200 193 182 181 2 421605 DEPOSITED PLAN OF ADDITIONAL SHEETS Survey Sheet(s) VERSION NUMBER SHEET SHEETS 5 2 V:\PROJECTS\06\635\635744\04-Spatial\SD\DP421605-S01B-635744dp4\DP421605-S01B-635744dp4.dgn FP-635744-012-VER 1.0 AT A2 SIZE SCALE:1:2000 20 0 100 (369.674) 118°6'25" 52.942 179°30'37" 173.972 177°38'33" 63.982 173°57'37" 51.422 173°35'26"40.737 175°26'47" 45.917 174°11'28" 4 5 6 2 7 177°4329" 12.897 173°2'12" 2 0157 187°24'24" 7 2 5 9 7 153°18'33" 24.487 120°16'11 " 4395 1 7 6 1 9 5 2 " 319199 90°7' SEE SHEET 3 1 DP 69382 D R I V E R R O A D MIRRABOOKA A V E N U E DP 42990 DP 42989 DP 34904 DP 42988 AVENUEROSEMARY CHASE LAVENDER 728 727 726 725 724 723 722 721 720 719 718 717 716 715 714 713 507 ATTADALE A P P R O A C H M A N D E R S T O N ESMERELDA PASS DP 422508 (8) DP 36178 163.998 FURNISS ROAD LIMITED IN DEPTH TO 609.6 METRES 33a A 33a B AVENUE PARKWAY TRAQUAIR SEE SHEET 5 3 8 2 4 7 2 33a C 33b A SEE SHEET 4 DP 423249 DP 423249 19.1812ha
www.veris.com.au (08) 6241 3333 VERIS 200 211 193 181 182 9002 240 3 421605 DEPOSITED PLAN OF ADDITIONAL SHEETS Survey Sheet(s) VERSION NUMBER SHEET SHEETS 5 2 V:\PROJECTS\06\635\635744\04-Spatial\SD\DP421605-S01B-635744dp4\DP421605-S01B-635744dp4.dgn FP-635744-012-VER 1.0 AT A2 SIZE SCALE:1:500 0 5 25 90° 1 5 6345 1 5 270°36'38" 269°23'22" 15.001 1 5 31725 90° 1 5 270^ 31725 3 2 0 0 1 270° 270° 15 90° 90° 90° DP 422508 DP 422508 DP 422508 DP 422508 DP 422508 90°7' 312486 D R I V E R R O A D A P P R O A C H M A N D E R S T O N DP 423249 89°52'51 " 1 DP 69382 PASS E S M E R E L D A SEE SHEET 2 SEE SHEET 4 155.582 LIMITED IN DEPTH TO 609.6 METRES 7
www.veris.com.au (08) 6241 3333 VERIS 227 240 239 238 237 236 235 234 233 232 231 230 228 9002 4 421605 DEPOSITED PLAN OF ADDITIONAL SHEETS Survey Sheet(s) VERSION NUMBER SHEET SHEETS 5 2 V:\PROJECTS\06\635\635744\04-Spatial\SD\DP421605-S01B-635744dp4\DP421605-S01B-635744dp4.dgn FP-635744-012-VER 1.0 AT A2 SIZE SCALE:1:500 5 0 25 14 270° 90° 135^3'36 " 8.5 134^53'30" 1 5 135^6'30" 8.5 224^56'24" 8 9 1 3 90^ 14 90^ 3 5 9 3 4 33a C 33b A 90^ 9 6 9 9 155.582 DP 423249 DP 423249 DP 423249 DP 423249 DP 423249 DP 423249 DP 423249 DP 423249 DP 423249 DP 423249 DP 423249 DP 423249 DP 423249 PARKWAY 270° 90°7'21"1 2 5 292 90° 9 3 9 7 8 1 1 8 7 8 4 269°52'47" 3 8 2 4 7 2 1 DP 69382 TRAQUAIR 312486 SEE SHEET 3 SEE SHEET 2 SEE SHEET 2 SEE SHEET 5 LIMITED IN DEPTH TO 609.6 METRES
www.veris.com.au (08) 6241 3333 VERIS 254 255 256 257 258 259 260 261 262 263 264 265 266 277 279 280 281 282 283 284 285 286 287 288 278 507 713 714 715 716 717 718 719 720 721 722 723 253 241 242 243 244 245 246 247 248 249 250 251 9002 5 421605 DEPOSITED PLAN OF ADDITIONAL SHEETS Survey Sheet(s) VERSION NUMBER SHEET SHEETS 5 2 V:\PROJECTS\06\635\635744\04-Spatial\SD\DP421605-S01B-635744dp4\DP421605-S01B-635744dp4.dgn FP-635744-012-VER 1.0 AT A2 SIZE SCALE:1:500 5 0 25 9002 9002 365m² 439m² 425m² 355m² 356m² 357m² 429m² 431m² 360m² 361m² 362m² 435m² 482m² 509m² 450m² 488m² 493m² 450m² 450m² 450m² 450m² 450m² 510m² 561m² 375m² 14 14 8.5 6.016 6.016 8.5 6.005 6.005 6.623 5.938 3 8.5 5 9 7 7 5.977 1 2 4 9 6 292 1 2 5 292 9 4 9 2 23.225 1 5 7 9 7 15.001 2 8 3 7 9 15 2 8 2 9 7 12.501 2 8 4 4 8 12.5 12.501 2 8 5 1 7 12.5 12.501 2 8 5 8 6 12.5 15.001 2 8 6 6 9 15 15.001 2 8 7 5 2 15 12.501 2 8 8 2 1 12.5 12.501 2 8 8 9 12.5 12.501 2 8 9 5 9 12.5 15.001 2 9 0 4 1 15 3.389 6.223 4.142 3.885 8.338 8324 3 7 20.579 1.8 5.6 1 0.063 10.065 3.637 2.1922.154 8.4 30 19.556 15 30 15 30 10.897 23.984 16.859 23.995 10.995 30 17.054 15 30 15 15 30 15 15 30 15 15 30 15 15 30 15 17 30 17 18.707 30 18.707 12.5 12.5 10 6.24.17 18.088 19 41 2 0.151 30 19 30 2 4 8 0 6 14.001 2 0 0 4 3 4.17 89°53'51 " 90°6'9" 90°38'34" 90° 89°59'33" 90°0'27" 90° 90°19'37" 90°38'34" 90°19'37" 90°38'34" 90°19'37" 90°38'34" 90°19'37" 90°38'34" 90°19'37" 90°38'34" 90°19'37" 90°38'34" 90°19'37" 90°38'34" 90°19'37" 90°38'34" 90°19'37" 90°38'34" 89°21'26" 90°19'37" 90°38'34" 173°2'58 " 171°33'59 "160°46'34"164°58'50" 166°27'51" 171°58'58" 89°40'36" 1 60°32'29 " 167°29'56" 163°40'18" 164°3'8"168°15'28"155°20'12" 90° 89°53'37" 90° 90° 90°6'9" 90° 90° 89°53'51 " 90° 90° 90° 90° 90° 90° 90° 90° 90° 90° 90° 90° 90° 90° 90° 90° 90° 270° 90 ° 270 ° 270 ° 270° 70°32'39 " 109°27'21" 90 ° 90° 90 ° 90° 90°38'34" 97°0'36" 82°59'24" 86°15'11" 93°44'49" 270° (29.302) (35.9) 171°17'21" ATTADALE 116°17'30 " 1.795 DP 34904 DP 42988 DP 42988 DP 42989 DP 42989 DP 42989 DP 42989 DP 42989 DP 42990 DP 42990 DP 42990 DP 42990 LAVENDER CHASE AVENUE (155.579) 163.998 (369.674) 1 26°35'59" 33a A 89°40'23" DP 423249 DP 423249 DP 423249 DP 423249 DP 423249 DP 423249 DP 423249 DP 423249 DP 423249 DP 423249 DP 423249 TRAQUAIR DP 423249 33a B F F F 33a B F N 33a B F N F N 90°0'27" 90°0'27" 14 (43.20) E S M E R E L D A P A S S SEE SHEET 2 SEE SHEET 4 SEE SHEET 2 LIMITED IN DEPTH TO 609.6 METRES 9 3 9 7 8 1 1 8 7 8 4 PARKWAY 1.7 4.3 4.6 1.4 18.088 10 6.2 4.17 4.17 270° 270 ° 90 ° 6.655 4.971 11.171 4.971 6.655 5.698 4.556 6.056 4.556 5.698 90 ^ 135^ 135^ 135 ^ 135 ^ 90° 90 ^ 90^ 90^ 135 ^ 135 ^ 135^ 135^ F N AVENUE ATTADALE 90° 90 ° 4 188°27'45" 1 41 1 7 6.2 4.17 270 ° 270° 4.17 3.744 17411 1.832 131°36'13 " 229°6'11 " 73°36'53 " 97°12'57" 90 ° 6.811 4 33a B 18.088 10 AVENUE ATTADALE NOT TO SCALE ENLARGEMENT AT 'A' NOT TO SCALE ENLARGEMENT AT 'B' 'B' 'A' F 90°
www.veris.com.au (08) 6241 3333 VERIS Tenure Type Plan Type Plan Purpose Freehold Deposited Plan Subdivision & Restrictive Covenant Lots 181-185, 190-193, 200-203, 208-211, 9001, Roads Locality Darch Local Government City of Wanneroo Plan Heading Locality & Local Government Plan Information Survey Certificate - Regulation 54 I, hereby certify that this plan is accurate and is a correct representation of the(a) survey; and (b) calculations from measurements recorded in the field records, written law(s) in relation to which it is lodged. undertaken for the purposes of this plan and that it complies with the relevant Date Licensed Surveyor Department of Planning, Lands and Heritage File Number Former Tenure New Lot / Land Parent Plan Number 200-203, 208-211 & 9001 Lots 181-185, 190-193, DP 421606 Parent Lot Number Lot 9000 Title Reference Subject Land Description Subject Former Tenure Interests and Notifications Amendments Version Lodgement Type 3 Replacement Amendment Description Interests and Notifications added Date 26/4/2023 Purpose Statutory Reference Origin Land Burdened Benefit To Comments Field Records 151468 Area Declared as Special Survey Yes Survey Details Name Address Phone VERIS MT HAWTHORN 6915 6241 3333 Survey Organisation Fax 6241 3300 Email lodgements.wa@veris.com.au Reference 635744-S002A-LJG Subject New Interests Purpose Statutory Reference Origin Land Burdened Benefit To Comments Examination Date Examined Planning Authority WAPC Reference 159333 Planning Approval Delegated under S. 16 P&D Act 2005 Date In Order For Dealings Subject To For Registrar of Titles Date Plan Approved Inspector of Plans and Surveys Date Authorised By L.J. Gatti Survey and Plan Notation 1 422508 DEPOSITED PLAN OF ADDITIONAL SHEETS Survey Sheet(s) VERSION NUMBER SHEET SHEETS 3 3 Notification Sec 70A of the TLA Doc K192639 Lot 9001 Partially modified by Doc P304720 has occurred on parts of lot) City of Wanneroo (Uncontrolled filling surface AHD levels. Refer to the document for finished installation of groundwater bores. includes excavation/drilling for permitted within this lot. This from the finished surface is not Excavation below a depth of 2m boundary of this Lot. allowed within 1m of the rear No development or construction is 190-193 Lots 181-185 & 190-193 Lots 181-185 & This Plan & Sec 136D of the TLA V:\PROJECTS\06\635\635744\04-Spatial\SD\DP422508-S02A-635744dp3\DP422508-S02A-635744dp3.dgn driver_rd-5-20220329.acs FP-635744-010-VER 2.0 Survey Method Regulatory Statement position and type of all survey marks placed for this plan. Guidelines. See survey sheet(s) to determine the true final Survey carried out under Reg. 26A Special Survey Area Laurence John Gatti REG 26A (4) LIMITED IN DEPTH TO 609.6 METRES Doc Covenant Restrictive Notification Sec 70A of the TLA Doc L796683 Lot 9001 Partially modified by Doc P304721 has occurred on parts of lot) City of Wanneroo (Uncontrolled filling Memorial Contaminated Sites Act 2003 Doc O898012 Lot 9001 Partially modified by Doc Remediation required Contaminated siteRegulation and Environmental Department of Water Subject New Notifications and Memorials Purpose Statutory Reference Origin Land Burdened Benefit To Comments Remediated for restricted use Regulation and Environmental Department of Water Lot 9001 All Lots Except Doc Contaminated Sites Act 2003 Memorial
www.veris.com.au (08) 6241 3333 VERIS 369.675 118°6'25" 52.942 179°30'37" 173.972 177°38'33" 63.982 173°57'37" 51.422 173°35'26"40.737 175°26'47" 45917 174°11'28" 4 5 6 2 7 177°43'29" 12.897 173°2'12" 2 0157 187°24'24" 7 2 5 9 7 153°18'33" 24.487 120°16'11 " 4395 1 7 6 ° 1 9 5 2 319199 90°7' 3 8 2 4 7 2 269°52'47" 312486 90°7' ( 1 0 7 0 0 1 ) 9001 22.2106ha 211 210 209 208 203 202 201 200 193 192 191 190 185 184 183 182 181 2 422508 DEPOSITED PLAN OF ADDITIONAL SHEETS Survey Sheet(s) VERSION NUMBER SHEET SHEETS 3 3 V:\PROJECTS\06\635\635744\04-Spatial\SD\DP422508-S02A-635744dp3\DP422508-S02A-635744dp3.dgn FP-635744-010-VER 2.0 AT A2 SIZE SCALE:1:2000 20 0 100 3 2 0 0 1 89°53'37" SEE SHEET 3 1 DP 69382 FURNISS ROAD D R I V E R R O A D MIRRABOOKA A V E N U E DP 42990 DP 42989 DP 34904 DP 42988 AVENUEROSEMARY CHASE LAVENDER LIMITED IN DEPTH TO 609.6 METRES 728 727 726 725 724 723 722 721 720 719 718 717 716 715 714 713 507 2 0 7 2 0 6 2 0 5 2 0 4 1 8 9 1 8 8 1 8 7 1 8 6 ATTADALE AVENUE M A N D E R S T O N A P P R O A C H E S M E R E L D A P A S S DP 421606 (8) DP 36178
www.veris.com.au (08) 6241 3333 VERIS 35.9 89°53'37" 3.3896.223 4.142 3.885 8.338 8324 2 6 8 5 15.479 (6345) 1 5 15.001 1 5 (6345) ( 1 0 7 0 0 1 ) 369.675 2 0 0 4 3 29.302 1 6 03 2 ' 2 9 " 173°2'58 " 171°33'59"160°46'34"164°58'50" 166°27'51" 171°58'58" 104°17'40" 90°36'38" 266°15'11" 273°44'49" 5.6 1 0063 10.065 3.637 2.192 2.154 171°17'21" 167°29'56" 163°40'18" 164°3'8"168°15'28"155°20'12" 9001 193 192 191 190 185 184 183 182 181 211 210 209 208 203 202 201 200 15.001 15 2 9 1 5 7 8.5 6 0 1 1 6011 8.5 601 6 0 1 1 5 31725 31725 1 5 31725 1 5 31725 31725 1 5 1 5 31725 1 5 1 5 31725 1 5 1 5 31725 1 5 31725 1 5 31725 1 5 31725 1 5 1 5 31725 1 5 31725 1 5 31725 1 5 1 5 31725 1 5 1 5 31725 1 5 31725 1 5 31725 1 5 31725 1 5 31725 31725 1 5 957 1 5 9569 269°23'22" 270°36'38" 90°36'38" 270° 270° 89°59'47" 90°0'13" 90° 90° 90° 90° 90° 90° 90° 90° 90° 90° 90° 90° 90° 90° 90° 90° 90° 90° 90° 90° 90° 90° 90° 90° 90° 90° 90° 90° 90° 90° 90° 90° 90° 90° 90° 90° 90° 90° 90° 270° 270° 3 2 0 0 1 1 5 1 5 1 5 104°17'40" 134°59'54"134°59'54" 135°0'6" 135°0'6 " 6345 75°42'20" 3 422508 DEPOSITED PLAN OF ADDITIONAL SHEETS Survey Sheet(s) VERSION NUMBER SHEET SHEETS 3 3 V:\PROJECTS\06\635\635744\04-Spatial\SD\DP422508-S02A-635744dp3\DP422508-S02A-635744dp3.dgn FP-635744-010-VER 2.0 AT A2 SIZE SCALE:1:500 5 0 25 189 188 187 186 207 206 205 204 713 DP 42988 507 DP 34904 DP 421606 DP 421606 DP 421606 DP 421606 DP 421606 DP 421606 DP 421606 DP 421606 476m² 476m² 476m² 476m² 476m² 476m² 476m² 476m² 476m² 476m² 476m² 476m² 476m² 476m² 476m² 476m² 476m² D R I V E R R O A D M A N D E R S T O N A P P R O A C H E S M E R E L D A P A S S ATTADALE AVENUE E S M E R E L D A P A S S SEE SHEET 2 SEE SHEET 2 SEE SHEET 2 LIMITED IN DEPTH TO 609.6 METRES STREET CULZEAN
www.veris.com.au (08) 6241 3333 VERIS Tenure Type Plan Type Plan Purpose Freehold Deposited Plan Subdivision LOTS 227-253, 9003, ROADS & EASEMENTS & RESTRICTIVE COVENANT Locality Darch Local Government City of Wanneroo Plan Heading Locality & Local Government Plan Information Survey Certificate - Regulation 54 I, hereby certify that this plan is accurate and is a correct representation of the(a) survey; and (b) calculations from measurements recorded in the field records, written law(s) in relation to which it is lodged. undertaken for the purposes of this plan and that it complies with the relevant Date Licensed Surveyor Department of Planning, Lands and Heritage File Number Former Tenure New Lot / Land Parent Plan Number Lots 227-253 & 9003 DP 422508 Parent Lot Number Lot 9001 Title Reference Subject Land Description Field Records 151468 Area Declared as Special Survey Yes Survey Details Name Address Phone VERIS MT HAWTHORN 6915 6241 3333 Survey Organisation Fax 6241 3300 Email lodgements.wa@veris.com.au Reference 635744-S02B-LJG Examination Date Examined Planning Authority WAPC Reference 159333 Planning Approval Delegated under S. 16 P&D Act 2005 Date In Order For Dealings Subject To For Registrar of Titles Date Plan Approved Inspector of Plans and Surveys Date Survey and Plan Notation 1 423249 DEPOSITED PLAN OF ADDITIONAL SHEETS Survey Sheet(s) VERSION NUMBER SHEET SHEETS 4 2 V:\PROJECTS\06\635\635744\04-Spatial\SD\DP423249-S02B-635744dp5\DP423249-S02B-635744dp5.dgn driver_rd-6-20220608-dp5.acs FP-635744-013-VER 1.0 Survey Method Regulatory Statement position and type of all survey marks placed for this plan. Guidelines. See survey sheet(s) to determine the true final Survey carried out under Reg. 26A Special Survey Area LAURENCE JOHN GATTI REG 26A (4) LIMITED IN DEPTH TO 609.6 METRES Subject New Interests Purpose Statutory Reference Origin Land Burdened Benefit To Comments (Drainage) Easement Reg 33(a) Sec 167 of the P & D Act This Plan Lot 9003 City of Wanneroo 33a C (Sewerage) Easement Reg 33(b) Sec 167 of the P & D Act This Plan Lot 9003 Water Corporation 33b A Covenant Restrictive Sec 136D of the TLA This Plan & Doc Lot 9003 All Lots Except Lot 9003 All lots Except surface AHD levels. Refer to the document for finished installation of groundwater bores. includes excavation/drilling for permitted within this lot. This from the finished surface is not Excavation below a depth of 2m boundary of this Lot. allowed within 1m of the rear No development or construction is Amendments Version Lodgement Type 2 Replacement Amendment Description Interests and Notifications added Date 26/4/2023 Authorised By L.J. Gatti Subject Former Tenure Interests and Notifications Purpose Statutory Reference Origin Land Burdened Benefit To Comments Notification Sec 70A of the TLA Doc K192639 Lot 9003 Partially modified by Doc has occurred on parts of lot) City of Wanneroo (Uncontrolled filling Notification Sec 70A of the TLA Doc L796683 Lot 9003 Partially modified by Doc has occurred on parts of lot) City of Wanneroo (Uncontrolled filling Memorial Contaminated Sites Act 2003 Doc O898012 Lot 9003 Partially modified by Doc Remediation required Contaminated siteRegulation and Environmental Department of Water Subject New Notifications and Memorials Purpose Statutory Reference Origin Land Burdened Benefit To Comments Remediated for restricted use Regulation and Environmental Department of Water Lot 9003 All Lots Except Doc Contaminated Sites Act 2003 Memorial
33a C 33b A www.veris.com.au (08) 6241 3333 VERIS 9003 20.7390ha 211 200 193 182 181 2 423249 DEPOSITED PLAN OF ADDITIONAL SHEETS Survey Sheet(s) VERSION NUMBER SHEET SHEETS 4 2 V:\PROJECTS\06\635\635744\04-Spatial\SD\DP423249-S02B-635744dp5\DP423249-S02B-635744dp5.dgn FP-635744-013-VER 1.0 AT A2 SIZE SCALE:1:2000 20 0 100 118°6'25" 52.942 179°30'37" 173.972 177°38'33" 63.982 173°57'37" 51.422 173°35'26"40.737 175°26'47" 45.917 174°11'28" 4 5 6 2 7 177°43'29" 12.897 173°2'12" 2 0157 187°24'24" 7 2 5 9 7 153°18'33" 24.487 120°16'11 " 4395 1 7 6 1 9 5 2 " 319199 90°7' 3 8 2 4 7 2 269°52'47" 312486 SEE SHEET 3 1 DP 69382 D R I V E R R O A D MIRRABOOKA A V E N U E DP 42990 AVENUEROSEMARY 728 727 726 725 724 723 722 721 720 A P P R O A C H M A N D E R S T O N DP 422508 (8) DP 36178 FURNISS ROAD LIMITED IN DEPTH TO 609.6 METRES PARKWAY TRAQUAIR CULZEAN STREET SEE SHEET 4 90°7' 3 2 0 0 1 ATTADALE AVENUE ESMERELDA PASS 507 713 DP 34904 DP 42988 DP 42989 CHASE LAVENDER 714 715 716 717 718 719 369.675 SEE SHEET 3
www.veris.com.au (08) 6241 3333 VERIS 234 235 236 237 238 239 240 241 242 243 244 245 246 247 211 200 193 182 181 9003 5 0 25 3 423249 DEPOSITED PLAN OF ADDITIONAL SHEETS Survey Sheet(s) VERSION NUMBER SHEET SHEETS 4 2 V:\PROJECTS\06\635\635744\04-Spatial\SD\DP423249-S02B-635744dp5\DP423249-S02B-635744dp5.dgn FP-635744-013-VER 1.0 AT A2 SIZE SCALE:1:500 425m² 354m² 353m² 424m² 423m² 421m² 436m² 435m² 434m² 361m² 360m² 431m² 15 2 8 3 5 15 15 2 8 3 1 8 15 125 2 8 2 9 1 125 125 2 8 2 6 5 125 15 2 8 2 3 2 15 15 2 8 2 15 957 8.5 2 2 1 5 7 15582 2 3 1 5 8.5 9569 15.579 15 2 8 9 8 6 15 2 9 0 7 2 15 2 8 9 15 125 2 8 8 2 9 12.5 125 2 8 7 5 8 12.5 15 2 8 6 7 2 15 15 15 1 5 90° 90° 89°52'39" 90° 89°52'39" 90° 89°52'39" 90° 89°52'39" 90° 89°52'39" 135°0'6 " 135°0'6" 90°7'9" 89°52'39" 134°59'54"134°59'54" 90° 89°40'36" 90° 89°40'23" 90° 89°40'23" 90° 89°40'23" 90° 89°40'23" 90° 89°40'23" 89°40'23" E S M E R E L D A P A S S CULZEAN 155.579 155.582 90° 90° ( 2 9 1 5 7 ) 7 270° 15 270° 1 5 90° 6345 DP 422508 DP 422508 90° 1 5 270°36'38" 15.001 269°23'22" 1 5 90° DP 422508 31725 A P P R O A C H M A N D E R S T O N DP 422508 DP 422508 1 5 90° 270^ 31725 90° 3 2 0 0 1 R O A D D R I V E R SEE SHEET 2 STREET 171°58'58" 8324166°27'51" 8.338 164°58'50" 3.885160°46'34" 4.142 171°33'59" 6.223 173°2'58 " 1 6 03 2 ' 2 9 3.389 29.302 273°44'49" 2 0 0 4 3 266°15'11" 35.9 89°53'37" 5.6 1 0063 10.065 3.637 2.192 2.154 171°17'21" 167°29'56" 163°40'18" 164°3'8"168°15'28"155°20'12" 369.675 507 DP 34904 ATTADALE AVENUE 3 7 ( 2 6 8 5 ) SEE SHEET 4 LIMITED IN DEPTH TO 609.6 METRES SEE SHEET 2 SEE SHEET 2 713 DP 42988
www.veris.com.au (08) 6241 3333 VERIS 227 228 229 230 231 232 233 234 252 253 247 248 249 250 251 235 246 9003 5 0 25 4 423249 DEPOSITED PLAN OF ADDITIONAL SHEETS Survey Sheet(s) VERSION NUMBER SHEET SHEETS 4 2 V:\PROJECTS\06\635\635744\04-Spatial\SD\DP423249-S02B-635744dp5\DP423249-S02B-635744dp5.dgn FP-635744-013-VER 1.0 AT A2 SIZE SCALE:1:500 365m² 365m² 449m² 427m² 427m² 355m² 355m² 425m² 443m² 365m² 429m² 357m² 356m² 426m² 425m² 8.5 601 6 0 1 1 2 5 0 1 292 1 2 5 292 1 2 4 9 9 292 1 2 5 9 9 9 8.5 2319 1 6 15 2 8 4 6 8 15 2 8 5 15 2 8 4 3 6 15 125 2 8 4 0 9 125 125 2 8 3 8 2 125 15 2 8 3 5 15 15 15 2319 9 7 6 3 1 5 7 7 3 292 1 2 5 292 15 2 8 6 7 2 15 15 2 8 5 8 7 15 125 2 8 5 1 5 12.5 125 2 8 4 4 4 12.5 15 2 8 3 5 9 15 15 2 8 2 7 3 15 6 0 1 601 1 5 14 9 3 9 7 8 14 90° 90°0'10" 90° 90° 90° 90°0'10" 90° 90° 90° 89°52'39" 90° 89°52'39" 90° 89°52'39" 90° 89°52'39" 90° 89°52'39" 89°52'39" 90° 89°59'33" 90°0'27" 90° 90° 89°40'23" 90° 89°40'23" 90° 89°40'23" 90° 89°40'23" 90° 89°40'23" 90° 89°40'23" 90° 270° 1 2 5 0 4 PARKWAY TRAQUAIR STREET 155.579 155.582 9 6 9 9 89°59'50" 90° 270°0'27" 135^3'36 " 8.5 134^53'30" 1 5 135^6'30" 8.5 224^56'24" 8 9 1 3 90^ 14 90^ 3 5 9 3 4 33a C 33b A 90^ 43.2 SEE SHEET 2 CULZEAN SEE SHEET 3 LIMITED IN DEPTH TO 609.6 METRES 90°19'37"

Appendix B: Structure Plan

Galt Environmental Pty Ltd www.galtenv.com.au 50 Edward Street OSBORNE PARK WA 6017 ABN: 96 520 810 622
234 291 501 507 713 505 297 250 714 202 12 1648 1653 50 1661 459 18 728 1659 725 20 14 17 448 1660 49 1654 1652 1656 444 19 13 1658 16 720 1655 7 15 39 455 2 381 35 456 451 396 529 555 515 546 465 545 528 514 554 ESMERELDA LAVENDER CRISTATA TERRACE DRIVE HEATHFIELD SUMNER MEWS ROSEMARY AVENUE JENKYN CIRCLE MIRRABOOKA AVENUE PARADE EVERGLADES WATERFORD PARADE DRIVER ROAD ROAD GARDENS TULLOW GARDENS FURNISS HENSLEY LOOP DORNEYWOOD WAY 24.71ha WAY CARLOW PARADE 502503504 292 293 294 295 296 452 453 454 14624 715716717718719 721722723724 726727 1 DRIVER ROAD 23LOTS 20LOTS 23LOTS 23LOTS 9LOTS 37LOTS 17 LOTS 5LOTS 23LOTS 23LOTS 8LOTS 19LOTS 19LOTS 4LOTS PUBLICOPENSPACE-AREA6M BUSINESSPRECINCT 15M ROAD RESERVE 15M ROAD RESERVE 15M ROAD RESERVE 15M ROAD RESERVE 15M ROAD 13.2M ROAD RESERVE 20M ROAD RESERVE 18.2M RESERVE 13.2M ROAD RESERVE 15M ROAD RESERVE 15M ROAD RESERVE 15M ROAD RESERVE 15M ROAD RESERVE 15M ROAD RESERVE DRAINAGE RESERVE 50 45 55 50 45 40 40 40 40 55 45 40 45 45 50 40 40 45 45 50 50 50 50 55 40 40 40 50 55 55 55 ROAD 8LOTS 9LOTS 15M RR 8725m² 3928m² 8909m² 521m² 1882m² 1.0554ha 1.0403ha 7853m² 1.0465ha 9317m² 1465m² 1387m² 4338m² 2661m² 1.0644ha 1.0651ha 1.1221ha 1.8486ha (30m) (56m) (30m) (56m) (63m) (63m) (30m) (30m) (60m) (60m) (50m) (30m) (30m) 4.8142ha (60m) (60m) (50m) (30m) (30m) 1.1379ha 3809m² 8LOTS (30m) GROUPHOUSINGSITE 8.4 38.4 61.2 104.1 30 164 56.9 DRAINAGE 980m² CONCEPTPLAN LOT2(No.26)DRIVERROAD DARCH 8997-CON-02-H 62.5 1:2500 N:\TOWN PLANNING\8000-8999\8997\DRAFTING\A-CAD WILLIAM CLEMENTS 2019.10.09 Whilst all care has been taken in the compilation of this document, Rowe Group disclaim any responsibility for any errors or omissions. This document is and remains the property of Rowe Group and may not be reproduced or transmitted, in whole or in part, without the written consent of Rowe Group. All areas and dimensions are subject to survey. 8997_CON02H_20191009 Darch (Concept Plan) DRAWN: W. CLEMENTS DATE CREATED: 2019.10.09 · PROJECTION: MGA50 GDA94 · AERIAL: NEARMAP 20190223 0 m SCALE@A3: ROWE GROUP DESIGN NORTH LOTSUMMARY RESIDENTIALR20 ~10.41ha RESIDENTIALR30 ~1.12ha RESIDENTIALR60-SINGLERESIDENTIAL ~0.28ha RESIDENTIALR60-GROUPEDHOUSING ~1.13ha BUSINESSPRECINCT ~1.85ha PUBLICOPENSPACE ~4.8142ha TOTALDWELLINGS ~278LOTS SITEAREA ~24.71ha 7 LEGEND SUBJECTSITE CONTOURS EXISTINGBOUNDARIES EXISTINGLOTNUMBERS 2 RESIDENTIALR20 BUSINESSPRECINCT PUBLICOPENSPACE RESIDENTIALR30 RESIDENTIALR60 165 134 11 4

Appendix C: Previous Reports

Galt Environmental Pty Ltd www.galtenv.com.au 50 Edward Street OSBORNE PARK WA 6017 ABN: 96 520 810 622

PREVIOUS REPORTS

Soil & Rock Engineering Pty Ltd, Quality Plan for Filling Operations, Landsdale Non-Organic Waste Facility (Soil Rock 2000)

Soil & Rock Engineering Pty Ltd, Audit Report No.1 Landsdale Non-Organic Landfill Development (Soil Rock 2001)

RPS Bowman Bishaw Gorman (RPS), Preliminary Site Investigation – Lot 1441 Driver Road (RPS 2005)

WSP Environmental Pty Ltd, Preliminary Site Investigation, 50 Driver Road, Darch (WSP 2008a).

WSP Environmental Pty Ltd, 50 Driver Road – Summary of Landfill Gas Data from Perimeter Monitoring Wells (WSP 2008b)

WSP Environmental Pty Ltd, Tier 1 Risk Assessment - 50 Driver Road, Darch (WSP 2009a)

WSP Environmental Pty Ltd, Sampling, Analysis and Quality Plan - 50 Driver Road, Darch (WSP 2009b).

WSP Environmental Pty Ltd, Landfill Gas Monitoring Report 1 - 50 Driver Road, Darch (WSP 2009c)

WSP Environmental Pty Ltd, Landfill Gas Monitoring Report 2 - 50 Driver Road, Darch (WSP 2009d)

WSP Environmental Pty Ltd, Landfill Gas Monitoring Report 3 - 50 Driver Road, Darch (WSP 2009e).

WSP Environmental Pty Ltd, Groundwater Monitoring Report - 50 Driver Road, Darch (WSP 2009f)

WSP Environmental Pty Ltd, 50 Driver Road – Strategy for Monitoring Landfill Gas (WSP 2010)

WSP, 2011 Annual Landfill Gas Monitoring Report (WSP 2012a).

WSP, Groundwater Monitoring Report – 50 Driver Road, Darch (WSP 2012b)

Environmental Strategies (ES), 2013 Landfill Gas Monitoring – 50 Driver Road, Darch (ES 2013)

Golder Associates, Furniss Road Landfill, Darch – Data Gaps Analysis and Preliminary Conceptual Site Model (Golder 2014). Strategen, 2018, Environmental Due Diligence Report – 26 Driver Road, Darch WA (Strategen 2018)

Galt Geotechnics, 2019, Geotechnical Assessment – Stage 1, Proposed Mixed-use Development, 26 Driver Road, Darch. (Galt Geotechnics, 2019).

Galt Environmental, 2019, Preliminary Site Investigation and Data Gap Analysis, Lot 2 Driver Road, Darch. (Galt Environmental, 2019a)

Galt Environmental, 2019, Sampling Analysis and Quality Plan, Lot 2 Driver Road, Darch. (Galt Environmental, 2019b).

Galt Environmental, 2021, Detailed Site Investigation – Part I – Landfill Gas, Lot 2 Driver Road, Darch. (Galt Environmental, 2021a)

Galt Environmental, 2021, Detailed Site Investigation – Part II – Groundwater Assessment, Lot 2 Driver Road, Darch. (Galt Environmental, 2021b)

Galt Environmental, 2021, Detailed Site Investigation – Part III – Soil Assessment, Lot 2 Driver Road, Darch. (Galt Environmental, 2021c).

Galt Environmental, 2021, Remediation Options Appraisal, Lot 2 Driver Road, Darch. (Galt Environmental, 2021d)

The Environmental Protection Group (Aust) Pty Ltd, 2022, Technical Specification for Gas Risk Mitigation System. (EPG, 2022a)

The Environmental Protection Group (Aust) Pty Ltd, 2022, Construction Quality Assurance Plan for Gas Mitigation System. (EPG, 2022b).

The Environmental Protection Group (Aust) Pty Ltd, 2022, Conceptual Design of Building Gas Protection Measures – Lot 2, 26 Driver Road Darch. (EPG, 2022c).

The Environmental Protection Group (Aust) Pty Ltd, 2022, Development Specific Landfill Gas Risk Assessment, Former Landfill, Lot 2, 26 Driver Road, Darch. (EPG, 2022d).

The Environmental Protection Group (Aust) Pty Ltd, 2022, Landfill Gas Generation Assessment, Former Landfill, Lot 2, 26 Driver Road, Darch. (EPG, 2022e).

Galt Environmental, 2022, Addendum Study, Former Underground Storage Tanks, Workshops, Sheds, Equipment Storage Areas and House, Proposed Mixed-Use Development, Lot 2 Driver Road, Darch. (Galt Environmental, 2022a).

Galt Environmental, 2022, Remediation Action Plan, Proposed Mixed-Use Development. Lot 2 Driver Road, Darch. (Galt Environmental, 2023a);

Galt Environmental, 2022, Remediation and Validation Report – Stages 1B & 2 Kinmore Green Residential Estate (Galt Environmental, 2023b).

www.galtenv.com.au

50 Edward Street OSBORNE PARK WA 6017

T: +61 (8) 6272-0200 ABN:

Galt Environmental Pty Ltd
96 520 810 622

Appendix D: As Constructed Drawings –Limestone Raft and GRMS

Galt Environmental Pty Ltd www.galtenv.com.au 50 Edward Street OSBORNE PARK WA 6017 ABN: 96 520 810 622
507 713 714 715 716 717 717 719 720 721 722 291-DRAIN 274 275 276 207 206 205 265 266 277 278 254 255 256 257 258 259 260 261 262 263 279 280 281 282 283 284 285 286 287 288 264 211 210 209 208 203 202 201 200 228 229 230 231 232 233 234 235 236 237 238 239 240 252 253 241 242 243 244 245 246 247 248 249 250 251 ROSEMARY TERRACE ESMERELDA LAVENDER TRAQUAIR CHASE PASS CULZEAN STREET AVENUE PARKWAY
ATTADALE N A1 ISSUE DRAWINGNUMBER 14WickhamStreet,EastPerthWA6004 0894255900einfo@tabec.com.au www.tabec.com.au TABECPTYLTD ACN090796204
AsConExtents-Stage1B 2407-SK-023A A
Stage1B
Earthworks-HDPEGeomembrane

Stage2A

Earthworks-HDPEGeomembrane

AsConExtents-Stage2A

2407-SK-023C

291 252 234 14772 294 293 292 288 251 250 235 236 291-DRAIN 267 269 270 271 272 273 274 275 276 189 188 187 186 207 206 205 204 265 266 277 278 268 262 263 279 280 264 193 192 191 190 185 184 183 182 181 211 210 209 208 203 202 201 200 236 237 238 239 240 241 242 243 244 245 196 195 194 180 179 214 213 212 199 198 197 215 216 217 218 219 WESTPORTPARADE CARLOWWAY ATTADALE MANDERSTON APPROACH FALKIRK PASS CULZEAN ROAD
ATTADALE N A1 ISSUE DRAWINGNUMBER 14WickhamStreet,EastPerthWA6004 0894255900einfo@tabec.com.au www.tabec.com.au TABECPTYLTD ACN090796204
A
274 275 276 207 206 205 265 266 277 278 254 255 256 257 258 259 260 261 262 263 279 280 281 282 283 284 285 286 287 288 264 211 210 209 208 203 202 201 200 228 229 230 231 232 233 234 235 236 237 238 239 240 252 253 241 242 243 244 245 246 247 248 249 250 251 227 214 213 212 199 198 197 226 215 216 217 218 219 220 221 222 223 224 225 177 178 TRAQUAIR FALKIRK ROAD CHASE PASS CULZEAN STREET AVENUE PARKWAY
ATTADALE N A1 ISSUE DRAWINGNUMBER 14WickhamStreet,EastPerthWA6004 0894255900einfo@tabec.com.au www.tabec.com.au TABECPTYLTD ACN090796204 Earthworks-HDPEGeomembrane AsConExtents-Stage2B 2407-SK-023B A
Stage2B

Appendix E: Restrictive Covenants

Galt Environmental Pty Ltd www.galtenv.com.au 50 Edward Street OSBORNE PARK WA 6017 ABN: 96 520 810 622

Appendix F: Lot Plans

Galt Environmental Pty Ltd www.galtenv.com.au 50 Edward Street OSBORNE PARK WA 6017 ABN: 96 520 810 622
SCALE 1:250 7.05 0 5m nbn 254 365m² 29.2 1 2. 5 292 1 2. 5 90° 90° 90° 90° 90° 89°40'23" 90°19'37" 52.77 50.00 51.00 52.00 n b n nbn 52.30 52.77 255 256 49.81 52.77 635744 August 2023 CONNECTION CONNECTION Street Light Retaining Wall Lot Level Footpath Power Dome Sewer Service MANHOLE HYDRANT VALVE NBN Pit Water Service Drainage Vehicle Access Restriction Stairs Garage Locations No Build Zone (1m wide) GRMS Extent T R A Q U A I R P A R K W A Y ATTADALE AVENUE
N SCALE 1:250 7.05 0 5m nbn n b n 255 439m² 292 9 . 4 8 8.5 23.23 1 5. 8 90° 135°19'17" 135°19'17" 89°21'26" 90° 90° 90°38'34" 52.77 50.00 51.00 52.00 nbn 52.30 52.77 254 51.66 256 49.81 52.77 253 635744 August 2023 CONNECTION CONNECTION Street Light Retaining Wall Lot Level Footpath Power Dome Sewer Service MANHOLE HYDRANT VALVE NBN Pit Water Service Drainage Vehicle Access Restriction Stairs Garage Locations No Build Zone (1m wide) GRMS Extent ATTADALE
T R A Q U A I R P A R K W A Y
AVENUE
NoBuildZone 1mWide SCALE 1:250 7.05 0 5m nbn 256 425m² 15 2 8 . 3 8 2 8 . 3 15 89°21'26" 90°19'37" 89°40'23" 90°38'34" 90°19'37" 90°19'37" 89°40'23 " 49.81 48.00 49.00 50.00 51.00 nbn 52.77 255 51.66 257 48.70 50.92 52.77 254 52.77 635744 August 2023 CONNECTION CONNECTION Street Light Retaining Wall Lot Level Footpath Power Dome Sewer Service MANHOLE HYDRANT VALVE NBN Pit Water Service Drainage Vehicle Access Restriction Stairs Garage Locations No Build Zone (1m wide) GRMS Extent ATTADALE
AVENUE
NoBuildZone 1mWide SCALE 1:250 7.05 0 5m nbn nbn 257 355m² 2 8 . 3 8 12.5 2 8 . 4 5 12.5 90°19'37" 89°21'26" 90°38'34" 90°38'34" 89°40 '23 " 90°19'37" 89°40 '23 " 48.70 47.00 48.00 49.00 50.00 nbn 49.81 256 51.66 258 47.96 50.92 50.18 635744 August 2023 CONNECTION CONNECTION Street Light Retaining Wall Lot Level Footpath Power Dome Sewer Service MANHOLE HYDRANT VALVE NBN Pit Water Service Drainage Vehicle Access Restriction Stairs Garage Locations No Build Zone (1m wide) GRMS Extent ATTADALE AVENUE
NoBuildZone 1mWide SCALE 1:250 7.05 0 5m nbn 258 356m² 2 8 . 4 5 12.5 2 8 . 5 2 12.5 89°21'26" 90°38'34" 89°40 '23 " 90°19'37" 89°40 '23 " 47.96 46.00 47.00 48.00 49.00 nbn nbn 48.70 257 49.44 259 47.22 50.92 50.18 635744 August 2023 CONNECTION CONNECTION Street Light Retaining Wall Lot Level Footpath Power Dome Sewer Service MANHOLE HYDRANT VALVE NBN Pit Water Service Drainage Vehicle Access Restriction Stairs Garage Locations No Build Zone (1m wide) GRMS Extent ATTADALE AVENUE
NoBuildZone 1mWide SCALE 1:250 7.05 0 5m nbn 259 357m² 2 8 . 5 2 12.5 2 8 . 5 9 12.5 89°21'26" 90°38'34" 89°40 '23 " 90°19'37" 89°40 '23 " 90°19'37" 47.22 46.00 47.00 48.00 nbn nbn 47.96 258 49.44 260 46.11 49.07 50.18 635744 August 2023 CONNECTION CONNECTION Street Light Retaining Wall Lot Level Footpath Power Dome Sewer Service MANHOLE HYDRANT VALVE NBN Pit Water Service Drainage Vehicle Access Restriction Stairs Garage Locations No Build Zone (1m wide) GRMS Extent ATTADALE AVENUE
NoBuildZone 1mWide SCALE 1:250 7.05 0 5m nbn 260 429m² 46.11 45.00 46.00 47.00 nbn nbn 47.22 259 49.44 261 45.37 49.07 48.33 2 8 . 5 9 15 2 8 . 6 7 15 89°21'26" 90°38'34" 90°38'34" 89°40 '23 " 90°19'37" 89°40 '23 " 635744 August 2023 CONNECTION CONNECTION Street Light Retaining Wall Lot Level Footpath Power Dome Sewer Service MANHOLE HYDRANT VALVE NBN Pit Water Service Drainage Vehicle Access Restriction Stairs Garage Locations No Build Zone (1m wide) GRMS Extent ATTADALE AVENUE
NoBuildZone 1mWide SCALE 1:250 7.05 0 5m nbn 261 431m² 2 8 . 6 7 15 2 8 . 7 5 15 89°21'26" 90°38'34" 89°40 '23 " 90°19'37" 89°40 '23 " 45.37 44.00 45.00 46.00 nbn nbn 46.11 260 47.59 262 44.63 49.07 48.33 635744 August 2023 CONNECTION CONNECTION Street Light Retaining Wall Lot Level Footpath Power Dome Sewer Service MANHOLE HYDRANT VALVE NBN Pit Water Service Drainage Vehicle Access Restriction Stairs Garage Locations No Build Zone (1m wide) GRMS Extent ATTADALE AVENUE
NoBuildZone 1mWide SCALE 1:250 7.05 0 5m nbn 262 360m² 2 8 . 7 5 12.5 2 8 . 8 2 12.5 89°21'26" 90°38'34" 90°38'34" 89°40 '23 " 90°19'37" 89°40 '23 " 44.63 44.00 45.00 nbn nbn 45.37 261 47.59 263 44.26 46.85 48.33 635744 August 2023 CONNECTION CONNECTION Street Light Retaining Wall Lot Level Footpath Power Dome Sewer Service MANHOLE HYDRANT VALVE NBN Pit Water Service Drainage Vehicle Access Restriction Stairs Garage Locations No Build Zone (1m wide) GRMS Extent ATTADALE AVENUE
NoBuildZone 1mWide SCALE 1:250 7.05 0 5m nbn 263 361m² 2 8 . 8 2 12.5 2 8 . 8 9 12.5 89°21'26" 90°38'34" 89°40 '23 " 90°19'37" 89°40 '23 " 44.26 43.00 44.00 nbn 44.63 262 47.59 264 43.52 46.85 46.11 635744 August 2023 CONNECTION CONNECTION Street Light Retaining Wall Lot Level Footpath Power Dome Sewer Service MANHOLE HYDRANT VALVE NBN Pit Water Service Drainage Vehicle Access Restriction Stairs Garage Locations No Build Zone (1m wide) GRMS Extent ATTADALE AVENUE
NoBuildZone 1mWide SCALE 1:250 7.05 0 5m nbn 264 362m² 2 8 . 8 9 12.5 2 8 . 9 6 12.5 89°21'26" 90°38'34" 90°38'34" 89°40 '23 " 90°19'37" 89°40 '23 " 43.52 43.00 44.00 nbn nbn 44.26 263 45.74 265 43.15 46.85 46.11 635744 August 2023 CONNECTION CONNECTION Street Light Retaining Wall Lot Level Footpath Power Dome Sewer Service MANHOLE HYDRANT VALVE NBN Pit Water Service Drainage Vehicle Access Restriction Stairs Garage Locations No Build Zone (1m wide) GRMS Extent ATTADALE AVENUE
NoBuildZone 1mWide SCALE 1:250 7.05 0 5m nbn 265 435m² 2 8 . 9 6 15 2 9 . 0 4 15 89°21'26" 90°38'34" 90°19'37" 89°40 '23 " 90°19'37" 43.15 43.00 42.00 nbn 43.52 264 45.74 266 43.52 45.37 46.11 635744 August 2023 CONNECTION CONNECTION Street Light Retaining Wall Lot Level Footpath Power Dome Sewer Service MANHOLE HYDRANT VALVE NBN Pit Water Service Drainage Vehicle Access Restriction Stairs Garage Locations No Build Zone (1m wide) GRMS Extent ATTADALE AVENUE
SCALE 1:250 7.05 0 5m nbn 42.00 42.00 43.00 42.50 n bn bn n nbn 43.15 265 45.74 45.37 266 482m² 2 9 . 0 4 3.39 6.22 4.14 3.88 8.34 8.32 3 . 7 20.58 1.8 89°21'26" 173°3'1 " 171°33'59"160°46'34"164°58'50" 166°27'51" 171°58'58" 90°19'24" 9 0° 3 8' 3 4" 1 60°32'26" 89°40'23" 90°19'37" 43.52 635744 August 2023 CONNECTION CONNECTION Street Light Retaining Wall Lot Level Footpath Power Dome Sewer Service MANHOLE HYDRANT VALVE NBN Pit Water Service Drainage Vehicle Access Restriction Stairs Garage Locations No Build Zone (1m wide) GRMS Extent ATTADALE AVENUE PASS E S M E R E L D A
NoBuildZone 1mWide SCALE 1:250 7.05 0 5m nbn nbn nbn 277 509m² 5.6 1 0.06 10.06 3.642.192.15 8.4 30 19.56 171°17'21" 167°29'56" 163°40'18" 164°3'8"168°15'28"155°20'12" 90° 90° 89°53'37" 42.30 41.50 42.00 278 42.67 41.50 635744 August 2023 CONNECTION CONNECTION Street Light Retaining Wall Lot Level Footpath Power Dome Sewer Service MANHOLE HYDRANT VALVE NBN Pit Water Service Drainage Vehicle Access Restriction Stairs Garage Locations No Build Zone (1m wide) GRMS Extent ATTADALE AVENUE PASS E S M E R E L D A
NoBuildZone 1mWide SCALE 1:250 7.05 0 5m nbn 278 375m² 30 30 12.5 12.5 90° 90° 90° 90° 90° 90° 42.67 43.00 42.00 nbn nbn nbn 42.30 277 279 43.41 42.60 41.50 635744 August 2023 CONNECTION CONNECTION Street Light Retaining Wall Lot Level Footpath Power Dome Sewer Service MANHOLE HYDRANT VALVE NBN Pit Water Service Drainage Vehicle Access Restriction Stairs Garage Locations No Build Zone (1m wide) GRMS Extent ATTADALE AVENUE
NoBuildZone 1mWide SCALE 1:250 7.05 0 5m nbn nbn 279 450m² 15 30 15 30 90° 90° 90° 90° 90° 90° 43.41 43.00 42.00 44.00 nbn 42.67 278 280 44.15 42.60 41.50 635744 August 2023 CONNECTION CONNECTION Street Light Retaining Wall Lot Level Footpath Power Dome Sewer Service MANHOLE HYDRANT VALVE NBN Pit Water Service Drainage Vehicle Access Restriction Stairs Garage Locations No Build Zone (1m wide) GRMS Extent ATTADALE AVENUE
NoBuildZone 1mWide SCALE 1:250 7.05 0 5m nbn n b n 280 488m² 30 10.9 8.5 23.98 16.86 90° 134°56'55 " 134°56'55" 90°6'9" 90° 90° 44.15 43.00 44.00 nbn 43.00 43.80 43.41 279 42.60 635744 August 2023 CONNECTION CONNECTION Street Light Retaining Wall Lot Level Footpath Power Dome Sewer Service MANHOLE HYDRANT VALVE NBN Pit Water Service Drainage Vehicle Access Restriction Stairs Garage Locations No Build Zone (1m wide) GRMS Extent ATTADALE AVENUE L A V E N D E R C H A S E
NoBuildZone 1mWide SCALE 1:250 7.05 0 5m nbn 281 493m² 24 8.5 10.99 30 17.05 135°3'5" 135°3'5" 90° 90° 89°53'51 " 46.00 45.00 46.00 nbn 43.00 43.80 46.74 282 44.10 45.75 635744 August 2023 CONNECTION CONNECTION Street Light Retaining Wall Lot Level Footpath Power Dome Sewer Service MANHOLE HYDRANT VALVE NBN Pit Water Service Drainage Vehicle Access Restriction Stairs Garage Locations No Build Zone (1m wide) GRMS Extent ATTADALE AVENUE L A V E N D E R C H A S E
NoBuildZone 1mWide SCALE 1:250 7.05 0 5m nbn nbn 282 450m² 30 15 30 15 90° 90° 90° 90° 90° 90° 46.74 45.00 46.00 47.00 nbn 47.48 283 281 46.00 44.10 45.75 46.90 635744 August 2023 CONNECTION CONNECTION Street Light Retaining Wall Lot Level Footpath Power Dome Sewer Service MANHOLE HYDRANT VALVE NBN Pit Water Service Drainage Vehicle Access Restriction Stairs Garage Locations No Build Zone (1m wide) GRMS Extent ATTADALE AVENUE
NoBuildZone 1mWide SCALE 1:250 7.05 0 5m nbn 283 450m² 30 15 30 15 90° 90° 90° 90° 90° 90° 47.48 46.00 47.00 48.00 nbn nbn 48.59 284 282 46.74 48.50 45.75 46.90 635744 August 2023 CONNECTION CONNECTION Street Light Retaining Wall Lot Level Footpath Power Dome Sewer Service MANHOLE HYDRANT VALVE NBN Pit Water Service Drainage Vehicle Access Restriction Stairs Garage Locations No Build Zone (1m wide) GRMS Extent ATTADALE AVENUE
NoBuildZone 1mWide SCALE 1:250 7.05 0 5m nbn 284 450m² 30 15 30 15 90° 90° 90° 90° 90° 48.59 47.00 48.00 49.00 nbn 49.70 285 283 47.48 48.50 46.90 635744 August 2023 CONNECTION CONNECTION Street Light Retaining Wall Lot Level Footpath Power Dome Sewer Service MANHOLE HYDRANT VALVE NBN Pit Water Service Drainage Vehicle Access Restriction Stairs Garage Locations No Build Zone (1m wide) GRMS Extent ATTADALE AVENUE
NoBuildZone 1mWide SCALE 1:250 7.05 0 5m nbn 285 450m² 30 15 30 15 90° 90° 90° 90° 90° 90° 49.70 48.00 49.00 50.00 51.00 nbn 50.81 286 284 48.59 48.50 50.00 635744 August 2023 CONNECTION CONNECTION Street Light Retaining Wall Lot Level Footpath Power Dome Sewer Service MANHOLE HYDRANT VALVE NBN Pit Water Service Drainage Vehicle Access Restriction Stairs Garage Locations No Build Zone (1m wide) GRMS Extent ATTADALE AVENUE
NoBuildZone 1mWide SCALE 1:250 7.05 0 5m nbn 286 450m² 30 15 30 15 90° 90° 90° 90° 90° 90° 90° 50.81 49.00 50.00 51.00 52.00 nbn 51.55 287 285 49.70 51.10 50.00 635744 August 2023 CONNECTION CONNECTION Street Light Retaining Wall Lot Level Footpath Power Dome Sewer Service MANHOLE HYDRANT VALVE NBN Pit Water Service Drainage Vehicle Access Restriction Stairs Garage Locations No Build Zone (1m wide) GRMS Extent ATTADALE AVENUE
NoBuildZone 1mWide SCALE 1:250 7.05 0 5m nbn 287 510m² 30 17 30 17 90° 90° 90° 90° 90° 90° 51.55 50.00 51.00 52.00 nbn 52.66 288 286 50.81 51.10 52.60 635744 August 2023 CONNECTION CONNECTION Street Light Retaining Wall Lot Level Footpath Power Dome Sewer Service MANHOLE HYDRANT VALVE NBN Pit Water Service Drainage Vehicle Access Restriction Stairs Garage Locations No Build Zone (1m wide) GRMS Extent ATTADALE AVENUE
NoBuildZone 1mWide SCALE 1:250 7.05 0 5m nbn 288 561m² 30 18.71 30 18.71 90° 90° 90° 90° 90° 90° 52.66 51.00 52.00 53.00 287 51.55 52.60 PARKING CAR 54.06 635744 August 2023 CONNECTION CONNECTION Street Light Retaining Wall Lot Level Footpath Power Dome Sewer Service MANHOLE HYDRANT VALVE NBN Pit Water Service Drainage Vehicle Access Restriction Stairs Garage Locations No Build Zone (1m wide) GRMS Extent ATTADALE AVENUE
181 476m² 1 5 1 5 3173 31.73 90° 90° 90° 90° 90° 90° 90° 90° 44.98 SCALE 1:250 7.05 0 5m nbn n b n 44.40 44.90 194 180 182 44.98 45.35 45.72 635744 August 2023 CONNECTION CONNECTION Street Light Retaining Wall Lot Level Footpath Power Dome Sewer Service MANHOLE HYDRANT VALVE NBN Pit Water Service Drainage Vehicle Access Restriction Stairs Garage Locations No Build Zone (1m wide) GRMS Extent D R I V E R R O A D
182 476m² 1 5 1 5 31.73 3173 90° 90° 90° 90° 90° 90° 90° 44.98 SCALE 1:250 7.05 0 5m nbn n b n 44.40 45.35 193 181 44.98 183 44.61 635744 August 2023 CONNECTION CONNECTION Street Light Retaining Wall Lot Level Footpath Power Dome Sewer Service MANHOLE HYDRANT VALVE NBN Pit Water Service Drainage Vehicle Access Restriction Stairs Garage Locations No Build Zone (1m wide) GRMS Extent D R I V E R R O A D
183 476m² 1 5 1 5 3173 31.73 90° 90° 90° 90° 90° 90° 90° 90° 90° 44.61 SCALE 1:250 7.05 0 5m nbn n b n n b n 44.00 44.40 44.98 192 182 44.98 184 44.61 635744 August 2023 CONNECTION CONNECTION Street Light Retaining Wall Lot Level Footpath Power Dome Sewer Service MANHOLE HYDRANT VALVE NBN Pit Water Service Drainage Vehicle Access Restriction Stairs Garage Locations No Build Zone (1m wide) GRMS Extent D R I V E R R O A D
184 476m² 1 5 1 5 31.73 3173 90° 90° 90° 90° 90° 90° 90° 90° 90° 90° 44.61 SCALE 1:250 7.05 0 5m nbn n b n 44.00 44.61 191 183 44.61 185 44.24 635744 August 2023 CONNECTION CONNECTION Street Light Retaining Wall Lot Level Footpath Power Dome Sewer Service MANHOLE HYDRANT VALVE NBN Pit Water Service Drainage Vehicle Access Restriction Stairs Garage Locations No Build Zone (1m wide) GRMS Extent D R I V E R R O A D
185 476m² 1 5 1 5 3173 31.73 90° 90° 90° 90° 90° 90° 90° 90° 44.24 SCALE 1:250 7.05 0 5m nbn n b n nbn 43.80 44.00 44.24 190 184 43.87 187 44.61 186 43.87 635744 August 2023 CONNECTION CONNECTION Street Light Retaining Wall Lot Level Footpath Power Dome Sewer Service MANHOLE HYDRANT VALVE NBN Pit Water Service Drainage Vehicle Access Restriction Stairs Garage Locations No Build Zone (1m wide) GRMS Extent D R I V E R R O A D
190 476m² 3173 1 5 31.73 1 5 12.5 90° 90° 90° 90° 90° 90° 90° 90° 44.24 SCALE 1:250 7.05 0 5m nbn 43.00 n b n nbn 44.40 44.20 44.24 185 191 43.50 189 44.61 188 43.87 187 43.87 635744 August 2023 CONNECTION CONNECTION Street Light Retaining Wall Lot Level Footpath Power Dome Sewer Service MANHOLE HYDRANT VALVE NBN Pit Water Service Drainage Vehicle Access Restriction Stairs Garage Locations No Build Zone (1m wide) GRMS Extent M A N D E R S T O N A P P R O A C H
191 476m² 3173 1 5 3173 1 5 90° 90° 90° 90° 90° 90° 90° 90° 44.61 SCALE 1:250 7.05 0 5m nbn n b n 44.40 44.20 44.61 184 192 44.24 190 44.98 635744 August 2023 CONNECTION CONNECTION Street Light Retaining Wall Lot Level Footpath Power Dome Sewer Service MANHOLE HYDRANT VALVE NBN Pit Water Service Drainage Vehicle Access Restriction Stairs Garage Locations No Build Zone (1m wide) GRMS Extent M A N D E R S T O N A P P R O A C H
192 476m² 3173 1 5 3173 1 5 90° 90° 90° 90° 90° 90° 44.98 SCALE 1:250 7.05 0 5m nbn n b n 44.20 45.00 44.61 183 193 44.61 191 45.35 635744 August 2023 CONNECTION CONNECTION Street Light Retaining Wall Lot Level Footpath Power Dome Sewer Service MANHOLE HYDRANT VALVE NBN Pit Water Service Drainage Vehicle Access Restriction Stairs Garage Locations No Build Zone (1m wide) GRMS Extent M A N D E R S T O N A P P R O A C H
193 476m² 31.73 1 5 3173 1 5 90° 90° 90° 90° 90° 90° 90° 45.35 SCALE 1:250 7.05 0 5m nbn n b n 44.20 45.00 44.98 182 194 44.98 192 45.72 635744 August 2023 CONNECTION CONNECTION Street Light Retaining Wall Lot Level Footpath Power Dome Sewer Service MANHOLE HYDRANT VALVE NBN Pit Water Service Drainage Vehicle Access Restriction Stairs Garage Locations No Build Zone (1m wide) GRMS Extent M A N D E R S T O N A P P R O A C H
N o B u i l d Z o n e 1 m W i d e SCALE 1:250 7.05 0 5m nbn 227 365m² 292 1 2. 5 29.2 1 2. 5 2 8 . 1 6 90° 90° 90° 90° 90° 90° 90° 89°52'39" 53.79 nbn 53.20 53.70 226 225 53.42 228 53.05 54.16 635744 August 2023 CONNECTION CONNECTION Street Light Retaining Wall Lot Level Footpath Power Dome Sewer Service MANHOLE HYDRANT VALVE NBN Pit Water Service Drainage Vehicle Access Restriction Stairs Garage Locations No Build Zone (1m wide) GRMS Extent T R A Q U A I R P A R K W A Y
SCALE 1:250 7.05 0 5m nbn 228 365m² 292 1 2. 5 292 1 2. 5 90° 90° 90° 90° 90° 90° 53.42 nbn nbn 52.00 52.30 52.70 53.20 227 53.79 51.57 230 53.42 229 635744 August 2023 CONNECTION CONNECTION Street Light Retaining Wall Lot Level Footpath Power Dome Sewer Service MANHOLE HYDRANT VALVE NBN Pit Water Service Drainage Vehicle Access Restriction Stairs Garage Locations No Build Zone (1m wide) GRMS Extent T R A Q U A I R P A R K W A Y CULZEAN STREET
SCALE 1:250 7.05 0 5m nbn 229 449m² 29.2 9 . 9 9 8.5 2399 1 6 2 8 . 5 90° 135° 135° 90° 90° 90° 53.42 nbn nbn 52.00 52.30 52.70 53.20 228 53.42 51.57 230 635744 August 2023 CONNECTION CONNECTION Street Light Retaining Wall Lot Level Footpath Power Dome Sewer Service MANHOLE HYDRANT VALVE NBN Pit Water Service Drainage Vehicle Access Restriction Stairs Garage Locations No Build Zone (1m wide) GRMS Extent E
E L D A P A S S CULZEAN STREET
S M E R
NoBuildZone 1mWide SCALE 1:250 7.05 0 5m nbn 230 427m² 15 2 8 . 4 7 2 8 . 5 15 90° 90° 90° 90°7'21" 89°52'39" 90° 89°52'39" 90°7'21" 89°52'39" 51.57 nbn 51.00 52.00 225 50.83 231 53.42 229 228 53.42 53.05 635744 August 2023 CONNECTION CONNECTION Street Light Retaining Wall Lot Level Footpath Power Dome Sewer Service MANHOLE HYDRANT VALVE NBN Pit Water Service Drainage Vehicle Access Restriction Stairs Garage Locations No Build Zone (1m wide) GRMS Extent CULZEAN STREET
NoBuildZone 1mWide SCALE 1:250 7.05 0 5m nbn 231 427m² 2 8 . 4 7 15 2 8 . 4 4 15 90° 90°7'21" 89°52'39" 90° 89°52'39" 90°7'21" 89°52'39" 50.83 nbn nbn 49.50 51.00 224 50.46 232 51.57 230 52.68 635744 August 2023 CONNECTION CONNECTION Street Light Retaining Wall Lot Level Footpath Power Dome Sewer Service MANHOLE HYDRANT VALVE NBN Pit Water Service Drainage Vehicle Access Restriction Stairs Garage Locations No Build Zone (1m wide) GRMS Extent CULZEAN STREET
NoBuildZone 1mWide SCALE 1:250 7.05 0 5m nbn 232 355m² 2 8 . 4 4 125 2 8 . 4 1 125 90° 90°7'21" 89°52'39" 90° 89°52'39" 90°7'21" 89°52'39" 89°52'39" 50.46 nbn nbn 49.50 51.00 223 49.72 233 50.83 231 51.94 635744 August 2023 CONNECTION CONNECTION Street Light Retaining Wall Lot Level Footpath Power Dome Sewer Service MANHOLE HYDRANT VALVE NBN Pit Water Service Drainage Vehicle Access Restriction Stairs Garage Locations No Build Zone (1m wide) GRMS Extent CULZEAN STREET
NoBuildZone 1mWide SCALE 1:250 7.05 0 5m nbn 233 355m² 2 8 . 4 1 12.5 2 8 . 3 8 125 90°7'21" 90° 90°7'21" 89°52'39" 90° 89°52'39" 90°7'21" 89°52'39" 49.72 nbn nbn 48.50 49.50 222 48.98 234 50.46 232 51.57 635744 August 2023 CONNECTION CONNECTION Street Light Retaining Wall Lot Level Footpath Power Dome Sewer Service MANHOLE HYDRANT VALVE NBN Pit Water Service Drainage Vehicle Access Restriction Stairs Garage Locations No Build Zone (1m wide) GRMS Extent CULZEAN STREET
NoBuildZone 1mWide SCALE 1:250 7.05 0 5m nbn 234 425m² 2 8 . 3 8 15 2 8 . 3 5 15 90° 90°7'21" 89°52'39" 90° 89°52'39" 90°7'21" 89°52'39" 89°52'39" 48.98 nbn nbn 48.50 49.50 48.24 235 49.72 233 51.20 221 635744 August 2023 CONNECTION CONNECTION Street Light Retaining Wall Lot Level Footpath Power Dome Sewer Service MANHOLE HYDRANT VALVE NBN Pit Water Service Drainage Vehicle Access Restriction Stairs Garage Locations No Build Zone (1m wide) GRMS Extent CULZEAN STREET
NoBuildZone 1mWide SCALE 1:250 7.05 0 5m nbn 235 425m² 2 8 . 3 5 15 2 8 . 3 2 15 90° 90°7'21" 89°52'39" 90° 89°52'39" 90°7'21" 89°52'39" 48.24 nbn nbn 47.00 48.50 220 47.87 236 48.98 234 50.83 635744 August 2023 CONNECTION CONNECTION Street Light Retaining Wall Lot Level Footpath Power Dome Sewer Service MANHOLE HYDRANT VALVE NBN Pit Water Service Drainage Vehicle Access Restriction Stairs Garage Locations No Build Zone (1m wide) GRMS Extent CULZEAN STREET
NoBuildZone 1mWide SCALE 1:250 7.05 0 5m nbn 236 354m² 2 8 . 3 2 12.5 2 8 . 2 9 125 90° 90° 90°7'21" 89°52'39" 90° 89°52'39" 90°7'21" 89°52'39" 89°52'39" 47.87 nbn nbn 47.00 48.50 219 47.13 237 48.24 235 50.09 635744 August 2023 CONNECTION CONNECTION Street Light Retaining Wall Lot Level Footpath Power Dome Sewer Service MANHOLE HYDRANT VALVE NBN Pit Water Service Drainage Vehicle Access Restriction Stairs Garage Locations No Build Zone (1m wide) GRMS Extent CULZEAN STREET
NoBuildZone 1mWide SCALE 1:250 7.05 0 5m nbn 237 353m² 2 8 . 2 9 125 2 8 . 2 7 125 90° 90°7'21" 89°52'39" 90° 89°52'39" 90° 90°7'21" 90°7'21" 89°52'39" 47.13 nbn nbn 45.50 47.00 218 46.39 238 47.87 236 49.72 635744 August 2023 CONNECTION CONNECTION Street Light Retaining Wall Lot Level Footpath Power Dome Sewer Service MANHOLE HYDRANT VALVE NBN Pit Water Service Drainage Vehicle Access Restriction Stairs Garage Locations No Build Zone (1m wide) GRMS Extent CULZEAN STREET
NoBuildZone 1mWide SCALE 1:250 7.05 0 5m nbn 238 424m² 2 8 . 2 7 15 2 8 . 2 3 15 90° 90°7'21" 89°52'39" 90° 89°52'39" 90°7'21" 89°52'39" 46.39 nbn nbn 45.50 47.00 45.65 239 47.13 237 49.35 217 635744 August 2023 CONNECTION CONNECTION Street Light Retaining Wall Lot Level Footpath Power Dome Sewer Service MANHOLE HYDRANT VALVE NBN Pit Water Service Drainage Vehicle Access Restriction Stairs Garage Locations No Build Zone (1m wide) GRMS Extent CULZEAN STREET
SCALE 1:250 7.05 0 5m nbn 239 423m² 2 8 . 2 3 15 2 8 . 2 15 90° 90°7'21" 89°52'39" 90° 89°52'39" 90° 90°7'21" 89°52'39" 89°52'39" 45.65 nbn n b n nbn 45.50 216 46.39 240 46.39 238 48.61 635744 August 2023 CONNECTION CONNECTION Street Light Retaining Wall Lot Level Footpath Power Dome Sewer Service MANHOLE HYDRANT VALVE NBN Pit Water Service Drainage Vehicle Access Restriction Stairs Garage Locations No Build Zone (1m wide) GRMS Extent CULZEAN STREET
SCALE 1:250 7.05 0 5m nbn 240 421m² 2 8 . 2 9.57 8.5 2 2. 1 6 1558 90° 90°7'21" 135°0'6 " 135°0'6" 90°7'9" 89°52'39 " 90° 90°7'21" 89°52'51 " 89°52'39" 46.39 n b n n b n nbn 44.40 46.20 45.50 215 45.65 239 48.24 635744 August 2023 CONNECTION CONNECTION Street Light Retaining Wall Lot Level Footpath Power Dome Sewer Service MANHOLE HYDRANT VALVE NBN Pit Water Service Drainage Vehicle Access Restriction Stairs Garage Locations No Build Zone (1m wide) GRMS Extent E S M E R E L D A P A S S CULZEAN STREET
SCALE 1:250 7.05 0 5m nbn 241 436m² 2 3 . 1 5 8.5 957 2 9 . 0 7 15.58 90°19'24" 134°59'54" 134°59'54" 90° 90°19'37" 89°40'36" 89°40'23" 45.37 43.00 nbn n bn n b n 44.40 45.50 45.74 242 43.52 266 635744 August 2023 CONNECTION CONNECTION Street Light Retaining Wall Lot Level Footpath Power Dome Sewer Service MANHOLE HYDRANT VALVE NBN Pit Water Service Drainage Vehicle Access Restriction Stairs Garage Locations No Build Zone (1m wide) GRMS Extent E S M E R E L D A P A S S CULZEAN STREET
SCALE 1:250 7.05 0 5m nbn 242 435m² 2 9 . 0 7 15 2 8 . 9 9 15 90° 90°19'37" 89°40'23" 90° 45.74 nbn 45.50 43.15 265 241 45.37 46.11 243 43.52 266 635744 August 2023 CONNECTION CONNECTION Street Light Retaining Wall Lot Level Footpath Power Dome Sewer Service MANHOLE HYDRANT VALVE NBN Pit Water Service Drainage Vehicle Access Restriction Stairs Garage Locations No Build Zone (1m wide) GRMS Extent CULZEAN STREET
NoBuildZone 1mWide SCALE 1:250 7.05 0 5m nbn 243 434m² 2 8 . 9 9 15 2 8 . 9 15 90° 90°19'37" 89°40'23" 90° 46.11 nbn nbn 45.50 47.00 43.15 265 242 45.74 46.85 244 43.52 264 635744 August 2023 CONNECTION CONNECTION Street Light Retaining Wall Lot Level Footpath Power Dome Sewer Service MANHOLE HYDRANT VALVE NBN Pit Water Service Drainage Vehicle Access Restriction Stairs Garage Locations No Build Zone (1m wide) GRMS Extent CULZEAN STREET
NoBuildZone 1mWide SCALE 1:250 7.05 0 5m nbn 244 361m² 2 8 . 9 12.5 2 8 . 8 3 12.5 90°19'37" 90° 90°19'37" 89°40'23" 90° 46.85 nbn 45.50 47.00 44.26 263 243 46.11 47.59 245 43.52 264 635744 August 2023 CONNECTION CONNECTION Street Light Retaining Wall Lot Level Footpath Power Dome Sewer Service MANHOLE HYDRANT VALVE NBN Pit Water Service Drainage Vehicle Access Restriction Stairs Garage Locations No Build Zone (1m wide) GRMS Extent CULZEAN STREET
NoBuildZone 1mWide SCALE 1:250 7.05 0 5m nbn 245 360m² 2 8 . 8 3 12.5 2 8 . 7 6 12.5 90° 90°19'37" 90° 90°19'37" 89°40'23" 90° 47.59 nbn nbn 47.00 48.50 44.26 263 244 46.85 48.33 246 44.63 262 635744 August 2023 CONNECTION CONNECTION Street Light Retaining Wall Lot Level Footpath Power Dome Sewer Service MANHOLE HYDRANT VALVE NBN Pit Water Service Drainage Vehicle Access Restriction Stairs Garage Locations No Build Zone (1m wide) GRMS Extent CULZEAN STREET
SCALE 1:250 7.05 0 5m nbn 246 431m² 2 8 . 7 6 15 2 8 . 6 7 15 90°19'37" 90° 90°19'37" 89°40'23" 90° 48.33 nbn nbn 47.00 48.50 45.37 261 245 47.59 49.07 247 44.63 262 NoBuildZone 1mWide 635744 August 2023 CONNECTION CONNECTION Street Light Retaining Wall Lot Level Footpath Power Dome Sewer Service MANHOLE HYDRANT VALVE NBN Pit Water Service Drainage Vehicle Access Restriction Stairs Garage Locations No Build Zone (1m wide) GRMS Extent CULZEAN STREET
NoBuildZone 1mWide SCALE 1:250 7.05 0 5m nbn 247 429m² 2 8 . 6 7 15 2 8 . 5 9 15 90°19'37" 90° 90°19'37" 89°40'23" 90° 49.07 nbn nbn 48.50 49.50 45.37 261 246 48.33 49.44 248 46.11 260 635744 August 2023 CONNECTION CONNECTION Street Light Retaining Wall Lot Level Footpath Power Dome Sewer Service MANHOLE HYDRANT VALVE NBN Pit Water Service Drainage Vehicle Access Restriction Stairs Garage Locations No Build Zone (1m wide) GRMS Extent CULZEAN STREET
NoBuildZone 1mWide SCALE 1:250 7.05 0 5m nbn 248 357m² 2 8 . 5 9 12.5 2 8 . 5 2 12.5 90°19'37" 90° 90°19'37" 89°40'23" 90° 89°40'23" 49.44 nbn nbn 48.50 49.50 47.22 259 247 49.07 50.18 249 46.11 260 635744 August 2023 CONNECTION CONNECTION Street Light Retaining Wall Lot Level Footpath Power Dome Sewer Service MANHOLE HYDRANT VALVE NBN Pit Water Service Drainage Vehicle Access Restriction Stairs Garage Locations No Build Zone (1m wide) GRMS Extent CULZEAN STREET
NoBuildZone 1mWide SCALE 1:250 7.05 0 5m nbn 249 356m² 2 8 . 5 2 12.5 2 8 . 4 4 12.5 90°19'37" 90° 90°19'37" 89°40'23" 90° 50.18 nbn nbn 49.50 51.00 47.22 259 248 49.44 50.92 250 47.96 258 635744 August 2023 CONNECTION CONNECTION Street Light Retaining Wall Lot Level Footpath Power Dome Sewer Service MANHOLE HYDRANT VALVE NBN Pit Water Service Drainage Vehicle Access Restriction Stairs Garage Locations No Build Zone (1m wide) GRMS Extent CULZEAN STREET
NoBuildZone 1mWide SCALE 1:250 7.05 0 5m nbn 250 426m² 2 8 . 4 4 15 15 2 8 . 3 6 90°19'37" 90° 90°19'37" 89°40'23" 90° 89°40'23" 50.92 nbn nbn 49.50 51.00 48.70 257 249 50.18 51.66 251 47.96 258 635744 August 2023 CONNECTION CONNECTION Street Light Retaining Wall Lot Level Footpath Power Dome Sewer Service MANHOLE HYDRANT VALVE NBN Pit Water Service Drainage Vehicle Access Restriction Stairs Garage Locations No Build Zone (1m wide) GRMS Extent CULZEAN STREET
NoBuildZone 1mWide SCALE 1:250 7.05 0 5m nbn 251 425m² 15 2 8 . 2 7 15 2 8 . 3 6 90°19'37" 90° 90°19'37" 89°40'23" 90° 51.66 nbn 51.00 52.00 49.81 256 250 50.92 52.77 252 52.77 253 635744 August 2023 CONNECTION CONNECTION Street Light Retaining Wall Lot Level Footpath Power Dome Sewer Service MANHOLE HYDRANT VALVE NBN Pit Water Service Drainage Vehicle Access Restriction Stairs Garage Locations No Build Zone (1m wide) GRMS Extent CULZEAN STREET
N SCALE 1:250 7.05 0 5m nbn 252 443m² 23.19 8.5 9 . 7 6 29.2 1 5. 7 7 2 8 . 2 7 135 ° 135° 90° 90° 90° 52.77 52.00 nbn nbn 52.00 52.30 52.77 253 251 51.66 635744 August 2023 CONNECTION CONNECTION Street Light Retaining Wall Lot Level Footpath Power Dome Sewer Service MANHOLE HYDRANT VALVE NBN Pit Water Service Drainage Vehicle Access Restriction Stairs Garage Locations No Build Zone (1m wide) GRMS Extent T R A Q U A I R P A R K W A Y CULZEAN STREET
N o B u i l d Z 1 m W i d e SCALE 1:250 7.05 0 5m nbn 253 365m² 29.2 1 2. 5 29.2 1 2. 5 2 8 . 2 7 90° 90° 90° 90° 90° 90° 89°40'23" 52.77 52.00 nbn 52.00 52.30 52.77 254 251 51.66 52.77 252 635744 August 2023 CONNECTION CONNECTION Street Light Retaining Wall Lot Level Footpath Power Dome Sewer Service MANHOLE HYDRANT VALVE NBN Pit Water Service Drainage Vehicle Access Restriction Stairs Garage Locations No Build Zone (1m wide) GRMS Extent T R A Q U A I R P A R K W A Y CULZEAN STREET

Appendix G: Groundwater and Landfill Gas Sampling Analysis and Quality Plan

Galt Environmental Pty Ltd www.galtenv.com.au 50 Edward Street OSBORNE PARK WA 6017 ABN: 96 520 810 622

TECHNICAL MEMORANDUM

J1801113 028 TM Rev6

To: Steve Claudio e-mail: steve@parcelproperty.com

Cc: Vanessa Bryant

10 August 2023

Cc email: : vanessa.bryant@senversa.com.au

From: Brad Palmer Sender’s email: brad.palmer@galtenv.com.au

SAMPLING, ANALYSIS AND QUALITY PLAN

KINMORE GREEN RESIDENTIAL ESTATE 46 DRIVER ROAD, DARCH

Dear Steve,

1. INTRODUCTION

This report presents Galt Environmental Pty Ltd’s (Galt’s) sampling, analysis, and quality plan (SAQP) for groundwater (GW) and landfill gas (LFG) monitoring at the mixed-use development located at 46 Driver Road, Darch (the site). The site relative to the surrounding area is shown on Figure 1.

This SAQP should be read in conjunction with the remediation action plan (RAP) and ongoing site management plan (OSMP) for the site.

2. OBJECTIVES

The objectives of the SAQP are as follows:

to ensure that the GRMS is not significantly altering the existing ground gas regime; to ensure that the remediation measures are protective of environmental and human health; provide a methodology to assess the impacts of the gas membrane and fill soils on the distribution of ground gasses on a stage -by-stage basis;

to ensure the remediation objectives with respects to LFG and GW as outlined in the remediation action plan (RAP) are met; and ensure concentrations of contaminants of potential concern (COPC) in groundwater remain, at a minimum, consistent with the current understanding of groundwater quality beneath the site; and ensure short- and long-term protection of identified receptors from COPC in groundwater.

3. OVERVIEW

This SAQP forms part of the overall RAP and OSMP for the site. As part of the RAP and OSMP, GW and LFG will require ongoing assessment in the following scenarios:

1. Stage specific monitoring post installation of the gas risk mitigation system (GRMS) to verify that efficacy of the system.

2. Long-term monitoring of the LFG over the entirety of the site

3. Long term monitoring of the GW across the site.

www.galtenv.com.au

50 Edward Street OSBORNE PARK WA 6017

T: +61 (8) 6272-0200

ABN: 96 520 810 622

Environmental Pty Ltd
Galt

Stage-Specific LFG Monitoring

LFG monitoring is required to confirm prevailing site-wide gas regime and identify any changes to these conditions (and the overall site risk) after the construction of the GRMS as the stages are developed.

CIRIA C665 (2007) Assessing risks posed by hazardous ground gases to buildings indicates the following monitoring requirements are applicable to developments on LFG sites:

monitoring is carried out and reported in a completion report for all sites; aims to confirm that the soil gas regime remains within the design parameters of the protective measures (in this case the GRMS); and

ground gas monitoring program should have a defined date of cessation.

Long-term LFG Monitoring

Elevated methane and carbon dioxide concentrations are present at the site (as a result of historical landfilling) and may pose risk to receptors if left unmanaged. As part of commitments of Parcel Darch Pty Ltd, ongoing LFG monitoring is required until CS1 rating is achieved for a 12-month period across all wells within a stage area

Additionally, long-term monitoring is required to assess changes to the LFG regime (if any) as each stage of the development is completed. The long-term monitoring program will continue to evaluate the LFG regime at the site boundaries, particularly the southern and eastern boundaries adjacent to existing residents to ensure that offsite receptors are not adversely impacted in the event the gas regime changes.

Long-term Groundwater

Given that groundwater beneath the site is not considered suitable for drinking water of residential irrigation purposes, registration of a memorial with Landgate restricting groundwater abstraction will be place on each certificate of title of lots sold within the residential portion of the site.

Implementation of a groundwater monitoring program is required to ensure: concentrations of COPC in groundwater remain, at a minimum, consistent with the current understanding of groundwater quality beneath the site; and short- and long-term protection of identified receptors from COPC in groundwater.

Ongoing groundwater monitoring will also provide additional information relating to the suitability of groundwater for beneficial uses (i.e. irrigation of POS).

4. DATA QUALITY OBJECTIVES

4.1 Overview

The following data quality objectives (DQOs) are considered appropriate for the project and are consistent with the processes set out in Australian Standard (AS) 4482.1 and NEPM (2013). The DQOs have been incorporated into the OSMP as discussed throughout the remainder of this document.

4.2 Step 1 – State the Problem

The key problems to be addressed are as follows:

What is the ongoing groundwater contamination status at the site?

J1801113 028 TM Rev6 10 August 2023 Galt Environmental Pty Ltd www.galtenv.com.au 50 Edward Street OSBORNE PARK WA 6017 Page | 2 ABN: 96 520 810 622

Is the soil gas regime remaining within the design parameters of the protective measures post installation of the GRMS?

Is LFG present at concentrations, flow rates and composition that present a risk or require further assessment and control measures after development of the site?

What is the long-term LFG trend across the site?

4.3 Step 2 – Identify the Decision

The key decisions for the SAQP are as follows:

Completeness of contaminant source-pathway-receptor linkages.

Determination on whether the quantity and quality of field and laboratory data is considered appropriate to address the requirements of the assessment.

The requirement for additional work (i.e. investigations, remediation or management) to ensure the site is suitable for the purposes of the development an doesn’t pose human or ecological health risks above acceptable. Management of potential off-site migration of contaminants.

The presence of off-site sources/impacts that may be migrating on to the site (i.e. groundwater and/or LFG).

4.4 Step 3 – Identify Inputs to the Decision

There are a number of parameters that are considered to be likely to influence the outcomes of the GW and LFG monitoring

These parameters are considered to be as follows:

type and distribution of COPC within the groundwater at the site; toxicity of the COPC and their persistence; sufficient quantity and distribution of sampling locations; robust field and laboratory QA/QC data to assess data suitability; national association of testing authorities (NATA) accredited laboratory methods used for analytical testing; assessment of analytical data against appropriate assessment criteria (for the proposed land use) as stipulated by regulatory authorities and guidance documents.

The media identified as requiring assessment at the site are summarised in Table 1.

Table 1: Media Requiring Assessment

Media Yes No

Justification

Air x Assessment of ground gas above the GRMS post-installation and across the site in the long-term.

Surface Water x No surface water bodies are present on site. Adjacent water bodies such as drainage swamps are not considered to be hydraulically connected to the superficial aquifer.

Groundwater x Assessment of the ongoing groundwater conditions at the site is required.

4.5 Step 4 – Define the Study Boundary

The study boundary for the groundwater and long-term LFG monitoring (including eastings/northings) are shown on Figure 1 of the RAP The stages that will be monitored as part of the stage-specific LFG verification monitoring are also presented on Figure 2 of the RAP

The lateral and vertical extent of the long-term investigation is limited to the location and maximum depth of LFG/groundwater monitoring wells. The location and extent of the verification wells are limited to the depth of the GRMS, which is designed at 2.2 m below ground level (BGL).

J1801113 028 TM Rev6 10 August 2023 Galt Environmental Pty Ltd www.galtenv.com.au 50 Edward Street OSBORNE PARK WA 6017 Page | 3 ABN: 96 520 810 622

The temporal boundary of the groundwater and long-term LFG monitoring is at least until completion of all stages of the Kinmore Green Estate (currently estimated at 2025 but likely subject to change). The temporal boundary of the stage-specific LFG verification monitoring is from completion of the relevant stage until approximately 3 months thereafter.

4.6 Step 5 – Develop a Decision Rule

The decision rules for the project will be based on an analysis of the land use and potential receptors.

The decision rules in addressing the objective of the investigation are as follows:

the applicable groundwater and LFG assessment criteria will be adopted based on the site use; groundwater analytical results along with LFG field data and calculated GSVs will be assessed against the adopted assessment criteria; exceedances of assessment criteria will trigger a review of the potential risks to human health and the environment, and possible implementations of mitigation procedures; the QA/QC data will be evaluated with respect to the acceptable ranges outlined in the RAP; and the accuracy and precision of the field and laboratory data will be scrutinised for possible errors or anomalies.

4.7 Step 6 – Specify Limits on Decision Errors

The DQOs define how the quality of data collected through the phases of investigation is to be assessed. The evaluation criteria are summarised in Table 2 below.

Table 2: Evaluation Criteria of Each Aspect of the Investigation Data Quality Indicators Evaluation Criteria

Documentation and data completeness

Site conditions accurately described. Sampling locations accurately described. Completion of field notes, calibration certificates, chain-of-custody documentation and laboratory test certificates. Samples collected from all areas of potential environmental concern. Samples are scheduled for analysis of all COPC.

Use of appropriate techniques for sampling, storage and transport of samples.

Data comparability

Data representativeness

Precision for sampling and analysis

Use of National Association of Testing Authorities (NATA) accredited primary and secondary laboratories

Collection of quality control samples for comparative purposes.

Collection of representative samples from each sampling location and across the site.

Use of appropriate techniques for sampling, storage and transport of samples.

Use of properly trained and qualified personnel. Use of duplicate samples collected at a minimum rate of 1 in 20 (i.e. 5%). Assessment of the relative percentage difference (RPD) between primary, and duplicate samples.

Acceptable recovery of laboratory matrix spikes. Acceptable quality of rinsate blanks.

J1801113 028 TM Rev6 10 August 2023 Galt Environmental Pty Ltd www.galtenv.com.au 50 Edward Street OSBORNE PARK WA 6017 Page | 4 ABN: 96 520 810 622

Data Quality Indicators

Accuracy

4.8 Step 7 – Optimise the Design

Evaluation Criteria

Correct application of assessment criteria for the proposed land use providing an accurate benchmark for data comparison. Statistical analysis (where required) to understand whether results conform to the assessment criteria/standards and the presence of any data set outliers that may affect interpretation of results. Undertaking the assessment in accordance with correct regulations, guidelines and procedures as outlined above to provide an accurate site condition/contamination status.

The GW and LFG sampling locations are typically grid-based aimed to characterise the nature and extent of COPC at the site and identify any potential “hot spots”. As the development proceeds, additional monitoring location will be required to replace wells damaged or destroyed during construction. The location of replacement wells will be evaluated to ensure approximately the same distribution and density of locations will be maintained.

5. SAMPLING, ANALYSIS & QUALITY PLAN

5.1 Landfill Gas

5.1.1. LFG Verification Monitoring

Temporary LFG monitoring wells will be installed at selected locations targeting the following: immediately above the GRMS typically within a lot (and in the lower lot in Situation B on Inline Image 2); and passive venting zones (Situation A, B and C as shown on Inline Images 1-3)

In addition, selected utility boxes within each new stage will be sampled to ensure LFG are not accumulating within these spaces.

The purpose of these monitoring locations is to:

1) Provide verification that the GRMS has been correctly installed whereby negligible concentrations of CH4 or CO2 are detected.

2) Verify that the passive venting zones are functioning as intended whereby CH4 and CO2 should be detected at concentrations consistent with the pre-development LFG regime.

3) Demonstrate that LFG is not accumulating in utility boxes/trenches that may be accessed by maintenance workers.

J1801113 028 TM Rev6 10 August 2023 Galt Environmental Pty Ltd www.galtenv.com.au 50 Edward Street OSBORNE PARK WA 6017 Page | 5 ABN: 96 520 810 622

Inline Image

Verification Monitoring (Situation A) – passive venting zone with low retaining wall

LFG well (lower) Gas consistent with existing regime

LFG well (upper) Gas consistent with existing regime

Inline

Verification Monitoring (Situation B) – passive venting with high retaining wall

J1801113 028 TM Rev6 10 August 2023 Galt Environmental Pty Ltd www.galtenv.com.au 50 Edward Street OSBORNE PARK WA 6017 Page | 6 ABN: 96 520 810 622
1: Image 2:

Inline Image 3: Verification Monitoring (Situation C) – passive venting along southern boundary Assessment Criteria

In accordance with DWER (2021) Assessment and Management of Contaminated Sites, adopted assessment criteria for LFG and vapour management have been derived from the following guideline documents:

CIRIA C665 (2007); and

New South Wales Environmental Protection Authority (2020). Assessment and management of hazardous ground gases. Contaminated Land Guidelines.

Additionally, assessment criteria have also been derived from the following standards and guidance:

Safe Work Australia (2019). Workplace exposure standards for airborne contaminants. DoH (2022) Hydrogen sulfide and public health https://ww2.health.wa.gov.au/Articles/F_I/Hydrogen-sulfide-and-publichealth.

Adopted LFG assessment criteria are presented in Table 3

J1801113 028 TM Rev6 10 August 2023 Galt Environmental Pty Ltd www.galtenv.com.au 50 Edward Street OSBORNE PARK WA 6017 Page | 7 ABN: 96 520 810 622

Verification wells (above GRMS)

Verification wells (passive venting zones)

Values consistent with ambient background

Values equal to or less than predevelopment gas regime

Notes: 1. LEL – lower explosive limit

Table 3: LFG Assessment Criteria

Assessment Criteria

Values consistent with ambient background

Values equal to or less than predevelopment gas regime

Values consistent with ambient background

Values consistent with predevelopment gas regime

Values consistent with ambient background

Values consistent with predevelopment gas regime

Values consistent with predevelopment gas regime

Nil

Values equal to or less than predevelopment gas regime

Ambient background concentrations will be recorded using a GA5000 in open air during each monitoring event. These values will then be adopted as suitable criteria for assessment of data collected from verification wells located directly above the GRMS.

Pre-development gas values for each verification well were derived from LFG well previously located in the areas of the same stage of those wells which are being monitored and for which historical data is available.

The adopted assessment criteria have been derived to ensure protection of onsite and offsite receptors following construction works and into the future. In the event an exceedance of assessment criteria is noted, comparison of the results with historical monitoring data will be undertaken. This will ensure that the implementation of management controls/contingencies has been done so appropriately.

Spacing

Based on CIRIA guidance documentation (Table 4.2), the site is considered to be a moderate gas hazard, given its use as a landfill site with limited putrescible wastes and historical sand quarrying activities. While this table applies to the investigation of landfill sites where the gas regime is unknown, it is considered that this is also suitable to provide the same assessment after the installation of the GRMS. As the site is proposed to be developed for residential, with and underlaying GRMS the end sensitivity of the site is considered to be moderate Based on this initial spacing of LFG monitoring wells should be 25-50 m within residential areas and 50-75 m in commercial and POS areas

The spatial distribution of LFG verification well locations will be chosen to ensure ‘Situation’ scenarios were evaluated within each Stage. Additionally, verification wells will be located directly above the GRMS in each Stage area to evaluate LFG conditions directly within the anticipated building footprint of further houses. For the majority of residential stages (Stage 3-10) where the land overlays uncontrolled fill this will consist of:

3 passive venting wells (minimum) which represent either situation A, B, & C depending on the nature of the installation of retaining wall and GRMS installation in a stage-by stage basis. It is noted that in some stages, certain ‘Situation’

J1801113 028 TM Rev6 10 August 2023 Galt Environmental Pty Ltd www.galtenv.com.au 50 Edward Street OSBORNE PARK WA 6017 Page | 8 ABN: 96 520 810 622
Methane Carbon Dioxide Carbon Monoxide Hydrogen Sulfide Flow Rate Monitoring Location Designated site boundary wells 1.25 % v/v 5 % of LEL
development gas
ppm STEL:
ppm
30 ppm TWA:
ppm STEL:
ppm
ppm
Values consistent with pre-
regime TWA: 5000
30,000
Values consistent with predevelopment gas regime
30
34
2
TWA: 10 ppm STEL: 15 ppm

scenarios will not be present due to the civil design. Therefore, a formation of three verification wells reflecting the civil design or another similar methodology which allows for assessment of passive venting must be conducted.

3 wells above the GRMS

At least one utility box within the new stage area.

Indicative LFG verification monitoring locations are shown on Figure 2.

Duration and Frequency

Wells should be installed within 1 month of the completion of the GRMS, with at least monitoring occurring on a weekly basis until completion of construction in the stage. The weekly monitoring events will include selected bores located on adjacent stages Should any exceedances be noted, additional monitoring events will be undertaken. Due to the very low risk nature on the site and as suggested in section 10.6 of the CIRIA guidelines, post construction monitoring should take place before the sale of the occupation of the site. A minimum of 5 monitoring events will be conducted for the verification monitoring.

Installation

The LFG monitoring wells will be installed in accordance with the following specifications:

50 mm polyvinyl chloride (PVC) Class 18 blank and screened casings; screened casing slots 0.4 mm in width located across the thickness of uncontrolled fill material; blank and screened PVC casing connected by flush mounted factory-threaded joints; chemically inert primary filter pack material with a high coefficient of uniformity, extending at least 0.5 m above the screened PVC casing; bentonite pellets as an annular sealant, extending 0.5 m above the filter pack; wells cement-grouted at the surface; fitted with quick connect single gas taps; and wells finished at approximately 20 cm above ground level

LFG monitoring wells will be installed in boreholes advanced with a drilling rig to exactly 2 m, 0.2 m above the GRMS.

Monitoring

LFG monitoring was undertaken with reference to the procedures outlined in CIRIA C665 (CIRIA, 2007) and NSW EPA (2012) Guidelines for the Assessment and Management of Site Impacted by Hazardous Ground Gases guideline documents

LFG monitoring was undertaken using intrinsically safe handheld monitoring equipment. The designation of intrinsically safe monitoring equipment ensures the equipment was appropriate to be used in potentially hazardous atmospheres.

Landfill gas and vapour monitoring was undertaken using a Geotech (QED) GA5000.

All monitoring equipment used for LFG monitoring was externally calibrated prior to use on site.

Monitoring data was stored electronically on the device and downloaded at the completion of each monitoring event.

Monitoring in the field recorded the following parameters:

methane; carbon dioxide; oxygen; carbon monoxide; hydrogen sulphide;

J1801113 028 TM Rev6 10 August 2023 Galt Environmental Pty Ltd www.galtenv.com.au 50 Edward Street OSBORNE PARK WA 6017 Page | 9 ABN: 96 520 810 622

atmospheric pressure; and gas flow

The following general meteorological conditions will also be recorded for each field event: date; barometric pressure range; barometric pressure change (ie falling, rising, steady); rainfall; temperature range; and general weather conditions.

5.1.2. Long-Term LFG Monitoring

Long-term monitoring of a selection of wells in non-earth worked sections across the entire site adjacent which have historical monitoring data must be completed with regularity and after the construction if each stage. Additionally, monitoring long-term monitoring wells in completed stages immediately adjacent to the latest stage completed will be included in the monitoring program. This is required to show that the GRMS and earthworks are not affecting the site-wide gas regime nor adjacent stages that have been completed. Where long-term wells are destroyed by construction works, suitable replacement locations will be selected for new wells.

It should be noted that selected ‘Situation B’ verification wells will be included in the monitoring program. Additionally, selected utility boxes will be monitored as part of the long-term program to verify that LFG is not accumulating in these areas.

The locations for LFG monitoring wells have been selected based on the following factors:

must provide adequate coverage across the site; wherever possible are located in publicly accessible locations; and not interfere with buried services.

Indicative locations for long-term LFG monitoring wells once construction is complete at the estate are shown on Figure 3.

Assessment Criteria

LFG monitoring assessment criteria have been adopted from the following documents (as specified in Department of Water and Environment Regulation (2014) Contaminated Sites Guidelines:

CIRIA C665 (CIRIA, 2007); and NSW EPA (2012) Guidelines for the Assessment and Management of Site Impacted by Hazardous Ground Gases.

Ground gases concentrations and gas screening values (GSV) will be compared again criteria as outlined Table 8.5 of CIRIA (2007). GSV use both gas concentrations and borehole flow rates to define a characteristic situation for a site based on the limiting borehole gas volume for flow for methane and carbon dioxide. The ‘worst case’ is adopted and therefore, the GSV calculations presented will be based upon maximum (peak) concentrations of methane and carbon dioxide recorded.

CIRIA C665 does not present screening values for other gases such as hydrogen sulfide and carbon monoxide. Where required, hydrogen sulfide and carbon monoxide gas concentrations will be compared to the following guidelines:

DoH (2009) Environmental Health Guide: Hydrogen Sulfide and Public Health; and National Occupational Health and Safety Commission (NOHSC) (1995) Adopted National Exposure Standards for Atmospheric Contaminants in the Occupational Environment.

J1801113 028 TM Rev6 10 August 2023 Galt Environmental Pty Ltd www.galtenv.com.au 50 Edward Street OSBORNE PARK WA 6017 Page | 10 ABN: 96 520 810 622

Spacing - Residential

Based on CIRIA guidance documentation (Table 4.2), the site is considered to be a moderate gas hazard, given its use as a landfill site with limited putrescible wastes and historical sand quarrying activities As the site is proposed to be developed for residential, with and underlaying GRMS the end sensitivity of the site is considered to be moderate. Based on this factor, initial spacing of LFG monitoring wells should be 25 to 50 m Wells from adjacent stages can be considered when making this assessment, provided the spacing is less than 50 m. Indicative locations for monitoring wells throughout the Estate are shown on Figure 3. These locations include selected ‘Situation B’ wells for each completed stage from the verification monitoring program.

Spacing – Commercial and POS

Based on CIRIA guidance documentation (Table 4.2), the site is considered to be a moderate gas hazard, given its use as a landfill site with limited putrescible wastes and historical sand quarrying activities As the site is proposed to be developed for commercial use, the end sensitivity of the site is considered to be low Based on this initial spacing of LFG monitoring wells should be 50 to 75 m Indicative locations for monitoring wells throughout the Estate are shown on Figure 3.

Duration and Frequency

LFG monitoring will be undertaken on a monthly basis following the completion of site works. Where possible monitoring will be undertaken during ‘worst case’ atmospheric conditions as defined by NSW EPA (2010). LFG monitoring will be ongoing until a CS1 rating achieved for 12-month period on a stage-by-stage basis.

Where construction works on a new stage are ongoing, long-term monitoring wells in adjacent completed stages will be included monitored on a weekly basis as part of the verification monitoring protocol outlined in Section 5.1.1.

Installation

The LFG monitoring wells will be installed in accordance with the following specifications:

50 mm polyvinyl chloride (PVC) Class 18 blank and screened casings; screened casing slots 0.4 mm in width located across the thickness of uncontrolled fill material; blank and screened PVC casing connected by flush mounted factory-threaded joints; chemically inert primary filter pack material with a high coefficient of uniformity, extending at least 0.5 m above the screened PVC casing;

bentonite pellets as an annular sealant, extending 0.5 m above the filter pack; wells cement-grouted at the surface; fitted with quick connect single gas taps; and wells finished at ground level with lockable steel risers.

LFG monitoring wells will be installed in boreholes advanced with a drilling rig through the entire thickness of the landfill body. Boreholes will be advanced until natural sands are encountered to ensure full penetration of the landfill material.

Monitoring

LFG monitoring will be undertaken with reference to the procedures outlined in CIRIA C665 (CIRIA, 2007) and NSW EPA (2012) Guidelines for the Assessment and Management of Site Impacted by Hazardous Ground Gases guideline documents

Monitoring in the field will be undertaken using a Geotech GA5000 portable infra-red gas analyser with internal flow pod and PID for the following:

methane; carbon dioxide;

J1801113 028 TM Rev6 10 August 2023 Galt Environmental Pty Ltd www.galtenv.com.au 50 Edward Street OSBORNE PARK WA 6017 Page | 11 ABN: 96 520 810 622

oxygen; carbon monoxide; hydrogen sulphide; atmospheric pressure; and gas flow

Ambient background concentrations will be recorded during each monitoring event with measurements to be taken from an offsite location and away from any ongoing works that may affect the readings.

The NSW EPA (20120) advises that monitoring should:

Include measurements undertaken during falling atmospheric pressure but that requirements are otherwise site specific depending on sensitivity of site use, ground gases of concern and generation potential of the source (i.e. not prescriptive - professional judgement based on a sound conceptual site model). The key requirement should be to capture the worst-case meteorological scenario. For infrequent slow-moving weather systems, a longer period of monitoring is likely to be required to capture worst case conditions (the guidance states a 5th percentile 3-hour pressure decrease rate based on a 2-year dataset from the nearest Bureau of Meteorology (BoM) site with continuous pressure recording can be used to estimate a worst case).

Monitoring Well Replacement

Monitoring wells will be replaced at a rate broadly consistent with pre-development density. The wells will be replaced at a minimum within 6 months of civil earthworks completion and all services installed, and before homes are built and inhabited.

5.2 Groundwater Location

At a minimum the groundwater bores must be stablished for each Stage area including the POS and the commercial precinct, upon completion such that there is:

one upgradient bore to establish the quality of groundwater entering the site (one for each aquifer or geological unit of interest); and

two or three bores to monitor groundwater quality immediately downgradient and also lateral to each contaminant source (for each aquifer or geological unit of interest).

COPC

The following COPCs should be tested in the soil bores across the entirety of the site:

heavy metals

TRH

BTEXN

PAH

VOCs

PFAS/PFOA

dissolved methane (groundwater)

C1 to C4 gases

major anions and cations

total organic carbon

J1801113 028 TM Rev6 10 August 2023 Galt Environmental Pty Ltd www.galtenv.com.au 50 Edward Street OSBORNE PARK WA 6017 Page | 12 ABN: 96 520 810 622

Assessment Criteria

We understand a restriction on groundwater use at the site will likely be applicable as part of the final site contamination classification. However, beneficial off-site uses of groundwater are likely to be for irrigation and non-potable purposes.

Assessment criteria for groundwater contamination have been adopted from the following documents:

NEPM (2013); DER (2014); Australian and New Zealand Environment and Conservation Council (ANZECC) (2000) Australian and New Zealand Guidelines for Fresh and Marine Water Quality; Department of Health (DoH) (2014) Contaminated Sites ground and surface water chemical screening guidelines; and Department of Water and Environment Regulation (DWER) (2017) Interim Guideline on the Assessment and Management of Perfluoroalkyl and Polyfluoroalkyl Substances (PFAS).

Specific groundwater assessment criteria adopted for the commercial precinct are as follows:

groundwater investigation levels - fresh waters (FW); non-potable use of groundwater (NPUG); long term irrigation (LTI); and non-potable and recreational uses.

Installation

One groundwater monitoring well is proposed to be installed in the proposed commercial precinct (in addition to the existing monitoring wells).

Groundwater monitoring wells are proposed to be dual purpose and also serve as LFG monitoring locations. The depth and screened interval of each well will be dependent upon onsite conditions including depth to groundwater and the thickness of the landfill body.

Wells will be constructed using 50 mm, class 18 flush-threaded PVC. The screened interval will be installed so that a minimum of 2 m of screen is below the water table, however the screened interval will continue through the entire thickness of the landfill body (until the sand cap layer). Gravel pack will be placed in the annulus around the screened portion of the standpipe with a minimum 0.5 m (thickness) bentonite plug placed above the gravel pack. The wells will be fitted with a lockable gas monitoring cap and the well head will be protected by a lockable steel riser. Each groundwater monitoring well will be developed to remove fine sediment from the well and gravel pack. Wells will be sampled no sooner than 7 days after installation and development to allow equilibration of the well with the surrounding aquifer.

Monitoring

Groundwater samples will be collected from the groundwater wells in accordance with the following Australian Standards:

AS 5667.1:1998 Water Quality Sampling. Part I – Guidance on the Design of Sampling Programs, Sampling Techniques and the Preservation and Handling of Samples;

AS 5667.11:1998 Water Quality Sampling. Part II – Guidance on the Sampling of Groundwater; and Heads of Environmental Protection Agencies (HEPA) Australia and New Zealand (2018) PFAS National Environmental Management Plan.

Recovery of groundwater samples will be undertaken utilising low flow techniques

J1801113 028 TM Rev6 10 August 2023 Galt Environmental Pty Ltd www.galtenv.com.au 50 Edward Street OSBORNE PARK WA 6017 Page | 13 ABN: 96 520 810 622

Spacing

It is anticipated that monitoring wells previously used during the DSI will be progressively removed as construction works commence. As such, additional wells will be installed across the estate to facilitate monitoring during the construction works. Well spacing must be broadly consistent with pre-development levels, and must accommodate the locations presented above to allow for upstream and downstream sampling of the various stages and the POS.

Indicative groundwater monitoring locations are shown on Figure 4.

Frequency and Duration

Groundwater monitoring will be undertaken bi-annually in order to capture post summer and post winter aquifer conditions. Once the seasonal variation is considered to be understood and reasonably classified, annual monitoring can be considered.

Monitoring Well Replacement

Monitoring wells will be replaced at a rate broadly consistent with pre-development density. The wells will be replaced at a minimum within 6 months of civil earthworks completion and all services installed, and before homes are built and inhabited.

6. REPORTING

LFG

GRMS Verification

An LFG GRMS verification monitoring report (GRMS VMR) must be produced post-monitoring period prior on a stage-by stage basis. This is to ensure that the GRMS has been installed correctly prior to any outlay of costs on the next stage of development, reducing any economic impact on the Lot owners, and health impact on site workers. The GRMS VMR will be prepared by Galt or a suitably experienced environmental consultant for review by the principal, CSA and DWER.

The remediation validation management report will include the following:

scope of works performed, including verification well installation methodology; evidence of compliance of methodology with this SAQP; monitoring records (air, gas); relevant testing plans; verification well monitoring data; historical versus post GRMS monitoring data; data of existing wells to show that the site-wide gas regime hasn’t changed significantly as a result of site-works.

Annual

On an annual basis an ongoing validation report (VR) will be produced confirming that the groundwater sampling and LFG works were undertaken in accordance with this SAQP. The VR will be prepared by Galt or a suitably experienced environmental consultant for review by the principal, CSA and DWER.

The remediation validation management report will be prepared in accordance with DWER guidelines and will include the following:

scope of works performed; site records; evidence of compliance with this RAP during development/remedial works; monitoring records (air, groundwater, gas); relevant sampling plans;

J1801113 028 TM Rev6 10 August 2023 Galt Environmental Pty Ltd www.galtenv.com.au 50 Edward Street OSBORNE PARK WA 6017 Page | 14 ABN: 96 520 810 622

validation results; and chain of custody laboratory analysis documentation; tabulated analytical results and detailed review of QA/QC results.

7. CLOSURE

We draw your attention to Attachment B of this report, “Understanding your Report”. The information provided within is intended to inform you as to what your realistic expectations of this report should be. This information is provided not to reduce the level of responsibility accepted by Galt, but to ensure that all parties who rely on this report are aware of the responsibilities each assumes in so doing.

Yours Faithfully,

GALT ENVIRONMENTAL PTY LTD

Brad Palmer

Environmental Scientist

Attachments:

A – Figures

B – Understanding Your Report

https://galtgeo.sharepoint.com/sites/WAG180113/Shared

028 TM
2023 Galt Environmental Pty Ltd
J1801113
Rev6 10 August
Street OSBORNE PARK
6017 Page | 15 ABN: 96
622
www.galtenv.com.au 50 Edward
WA
520 810
Documents/01 Parcel Advice/03 Correspondence/J1801113 028 TM Rev6.docx
Galt Environmental Pty Ltd www.galtenv.com.au 50 Edward Street OSBORNE PARK WA 6017 ABN: 96 520 810 622
ATTACHMENT A Figures
C O P Y R G H T 2 3 T H S F G U R E A N D T S C O N T E N T S R E M A N S T H E P R O P E R Y O F G A L T E N V R O N M E N T A L P T Y L T D A N D M A Y N O T B E R E P R O D U C E D W H O U T P R O R A P P R O V A L T H S F G U R E S H O U D B E R E A D N C O N U N C T O N W T H T H E A C C O M P A N Y N G R E P O R T ACN Te Ad dre ss 16 1 7 08 9 98 +6 1 (0)8 6 27 2-02 00 Ga t Env o nme n a P y L d 5 0 Ed wa d S re e Osb orn e Pa rk WA 6 01 7 SCALE DRAWN CHECK ED DATE DRAWN DATE CHE CKE D GDA 1994 MGA Zone 50 PRO EC T ON BP 10 0 8 2 0 23 DAC A3 ) 10 0 8 2 0 23 STAG E 01C STAG E 02A STAG E 0 8 STAG E 0 9 STAG E 01Comm erc ia l STAG E 0 3 STAG E 0 4 STAG E 0 5 STAG E 0 6 STAG E 0 7 STAG E 01- PO S STAG E 01A STAG E 01B STAG E 02B 39 1 2 00 39 1 2 00 39 1 4 00 39 1,4 00 39 1 6 00 39 1 6 00 39 1 8 00 39 1,8 00 6 4 8 0 0 0 0 6 4 8 0 2 0 0 6 4 8 0 2 0 0 6 4 8 0 4 0 0 6 4 8 0 4 0 0 6 4 8 0 6 0 0 6 4 8 0 6 0 0 R a n g e v i e w R d K n g sw ay Fu rn iss R d D r i v e r R d Abbotsw o o d D r E v a n d a l e R d M i r r a b o o k a A v Queen s w a y Rd Gnangara R d Hart m a n D r The Broadview PE RT H Avon R v er Wanne roo S T E L OCAT IO N Legen d Site B ou nda ry Stag e Bo un da ry Lot Bo un da r es ± 0 40 0 20 160 200 Me e O o b 0 1 J 1 0 1 1 1 3 - P a c e A e D c h 0 9 G S 0 4 M X D 0 8 R J 1 0 1 1 1 3 - 0 2 8 - S A Q P - 0 0 1 m x D a m o C a r k 0 0 8 2 2 3 2 5 0 2 P M 1 2 5 00 N OTE S A e a m a g e y a n d C a d a s e o u c e d o m L a n d g a e S L P A Re F g No C L EN T PR O E C T O C AT O N TL E o b N o PARCE L DARCH PTY LTD SA MPL ING A NALY S IS A ND Q UA LITY P LA N STAG E S 1B & 2 K INMO RE G RE EN RES IDENTIA L ES TATE SITE A ND LO CATIO N P LA N FIG URE 1 J1 80 1113
C O P Y R G H T 0 2 3 H S F G U R E A N D T S C O N E N S R E M A N S T H E P R O P E R T Y O F G A L T E N V R O N M E N T A L P T Y L T D A N D M A Y N O T B E R E P R O D U C E D W T H O U T P R O R A P P R O V A L T H S F G U R E S H O U L D B E R E A D N C O N U N C T O N W T H T H E A C C O M P A N Y N G R E P O R T ACN Te Ad d e ss 16 1 7 08 9 98 +6 1 (0 8 6 27 2-02 00 Ga Env ro nme n a P y L d 5 0 Ed ward St e e Osb orn e Pa rk WA 6 01 7 A Re F g No C L EN T PR O E C T O C AT O N TL E o b N o PARCE L DARCH PTY LTD MON TORING W ELL VE RIFICATIO N REP O RT STAG E S 1B & 2 K INMO RE G RE EN RES IDENTIA L ES TATE LFG V ER F CATIO N M ONITO RING FIG URE 2 J1 80 1113 SCALE DRAWN CHECK ED DATE DRAWN DATE CHE CKE D GDA 1994 MGA Zone 50 PRO EC T ON BP 10 0 8 2 0 23 DAC A3 ) 10 0 8 2 0 23 ! " ! " ! " ! " ! " ! " ! " ! " ! " ! " ! " ! " ! " ! " ! " ! Ñ + + ! Ñ + + ! Ñ + + ! Ñ + + ! Ñ + ! Ñ + ! Ñ + ! Ñ + ! Ñ + ! Ñ + ! Ñ + + ! Ñ + STAG E 02A STAG E 01B STAG E 02B LG 4 1 LG 4 2 LG 4 3 LG 4 4 VW0 1 VW0 2 VW0 3 VW0 4 VW0 5 VW0 6 VW0 7 VW0 8 VW0 9 VW1 0 VW11 DDW10 DDW12 G2 8 G4 1 G4 2 LG 0 6 LG 0 9 LG 1 0 LG 1 3 LG 1 4 LG 1 5 MW05 39 1 2 00 39 1 2 00 39 1 4 00 39 1,4 00 6 4 8 0 0 0 0 6 4 8 0 0 0 0 6 4 8 0 2 0 0 6 4 8 0 2 0 0 hT e B r oadview Kingsway Fu rn ss R d Mirrabooka Av E v a n d a l e R d M o s e y S t D r i v e r R d R a n g e v i e w R d PE RT H Avon R v er Wanne roo S T E L OCAT O N Legen d Site B ou nda ry Stag e Bo un da ry ! " Lon g- te rm mon tor ng ! " Ve r fica t o n o G RMS Insta l ation ! " Ve r fica t o n o P assive Ven ting ( S tu ation ! " Ve r fica t o n o P assive Ven ting ( S tu ation B ) ! " Ve r fica t o n o P assive Ven ting ( S tu ation C ) His toric al Wells ! Ñ + + Ga s Mo ni o r ng We l ± 0 20 40 60 80 100 Me e O o b 0 1 J 1 0 1 1 1 3 - P a c e A e D c h 0 9 G S 0 4 M X D 0 8 R J 1 0 1 1 1 3 - 0 2 8 - S A Q P - 0 0 2 m x D a m o C a r k 0 0 8 2 2 3 2 5 2 0 P M 1 1 5 00 N OTE S A e a m a g e y a n d C a d a s e o u c e d o m L a n d g a e S L P
C O P Y R G H T 2 3 T H S F G U R E A N D T S C O N T E N T S R E M A N S T H E P R O P E R Y O F G A L T E N V R O N M E N T A L P T Y L T D A N D M A Y N O T B E R E P R O D U C E D W H O U T P R O R A P P R O V A L T H S F G U R E S H O U D B E R E A D N C O N U N C T O N W T H T H E A C C O M P A N Y N G R E P O R T ACN Te Ad dre ss 16 1 7 08 9 98 +6 1 (0)8 6 27 2-02 00 Ga t Env o nme n a P y L d 5 0 Ed wa d S re e Osb orn e Pa rk WA 6 01 7 SCALE DRAWN CHECK ED DATE DRAWN DATE CHE CKE D GDA 1994 MGA Zone 50 PRO EC T ON BP 10 0 8 2 0 23 DAC A3 ) 10 0 8 2 0 23 ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! STAG E 01C STAG E 02A STAG E 0 8 STAG E 0 9 STAG E 01Comm erc ia l STAG E 0 3 STAG E 0 4 STAG E 0 5 STAG E 0 6 STAG E 0 7 STAG E 01- PO S STAG E 01A STAG E 01B STAG E 02B 39 1 2 00 39 1 2 00 39 1 4 00 39 1,4 00 39 1 6 00 39 1 6 00 39 1 8 00 39 1,8 00 6 4 8 0 0 0 0 6 4 8 0 2 0 0 6 4 8 0 2 0 0 6 4 8 0 4 0 0 6 4 8 0 4 0 0 6 4 8 0 6 0 0 6 4 8 0 6 0 0 R a n g e v i e w R d K n g sw ay Fu rn iss R d D r i v e r R d Abbotsw o o d D r E v a n d a l e R d M i r r a b o o k a A v Queen s w a y Rd Gnangara R d Hart m a n D r The Broadview PE RT H Avon R v er Wanne roo S T E L OCAT IO N Legen d Site B ou nda ry Stag e Bo un da ry Lot Bo un da r es ! In dica t ve LFG Mo ni to r n g Lo cat on s ± 0 40 0 20 160 200 Me e O o b 0 1 J 1 0 1 1 1 3 - P a c e A e D c h 0 9 G S 0 4 M X D 0 8 R J 1 0 1 1 1 3 - 0 2 8 - S A Q P - 0 0 3 m x D a m o C a r k 0 0 8 2 2 3 2 5 3 5 P M 1 2 5 00 N OTE S A e a m a g e y a n d C a d a s e o u c e d o m L a n d g a e S L P A Re F g No C L EN T PR O E C T O C AT O N TL E o b N o PARCE L DARCH PTY LTD SA MPL ING A NALY S IS A ND Q UA LITY P LA N STAG E S 1B & 2 K INMO RE G RE EN RES IDENTIA L ES TATE INDICATIV E L ANDFILL G A S MO NITOR ING LO CATIO NS FIG URE 3 J1 80 1113
C O P Y R G H T 2 3 T H S F G U R E A N D T S C O N T E N T S R E M A N S T H E P R O P E R Y O F G A L T E N V R O N M E N T A L P T Y L T D A N D M A Y N O T B E R E P R O D U C E D W H O U T P R O R A P P R O V A L T H S F G U R E S H O U D B E R E A D N C O N U N C T O N W T H T H E A C C O M P A N Y N G R E P O R T ACN Te Ad dre ss 16 1 7 08 9 98 +6 1 (0)8 6 27 2-02 00 Ga t Env o nme n a P y L d 5 0 Ed wa d S re e Osb orn e Pa rk WA 6 01 7 SCALE DRAWN CHECK ED DATE DRAWN DATE CHE CKE D GDA 1994 MGA Zone 50 PRO EC T ON BP 10 0 8 2 0 23 DAC A3 ) 10 0 8 2 0 23 " " " " " " ) " " ) " " " " ) " ) " " ) STAG E 01C STAG E 02A STAG E 0 8 STAG E 0 9 STAG E 01Comm erc ia l STAG E 0 3 STAG E 0 4 STAG E 0 5 STAG E 0 6 STAG E 0 7 STAG E 01- PO S STAG E 01A STAG E 01B STAG E 02B 39 1 2 00 39 1 2 00 39 1 4 00 39 1,4 00 39 1 6 00 39 1 6 00 39 1 8 00 39 1,8 00 6 4 8 0 0 0 0 6 4 8 0 2 0 0 6 4 8 0 2 0 0 6 4 8 0 4 0 0 6 4 8 0 4 0 0 6 4 8 0 6 0 0 6 4 8 0 6 0 0 R a n g e v i e w R d K n g sw ay Fu rn iss R d D r i v e r R d Abbotsw o o d D r E v a n d a l e R d M i r r a b o o k a A v Queen s w a y Rd Gnangara R d Hart m a n D r The Broadview PE RT H Avon R v er Wanne roo S T E L OCAT IO N Legen d Site B ou nda ry Stag e Bo un da ry Lot Bo un da r es " In dica t ve Gro un dwa te r Mon tor ing L oca t o n ± 0 40 0 20 160 200 Me e O o b 0 1 J 1 0 1 1 1 3 - P a c e A e D c h 0 9 G S 0 4 M X D 0 8 R J 1 0 1 1 1 3 - 0 2 8 - S A Q P - 0 0 4 m x D a m o C a r k 0 0 8 2 2 3 2 5 5 0 P M 1 2 5 00 N OTE S A e a m a g e y a n d C a d a s e o u c e d o m L a n d g a e S L P A Re F g No C L EN T PR O E C T O C AT O N TL E o b N o PARCE L DARCH PTY LTD SA MPL ING A NALY S IS A ND Q UA LITY P LA N STAG E S 1B & 2 K INMO RE G RE EN RES IDENTIA L ES TATE INDICATIV E G ROUND WATE R M ONITO RING L OCAT ONS FIG URE 4 J1 80 1113

Appendix H: Parcel Darch Pty Ltd Letters of Commitment

Galt Environmental Pty Ltd www.galtenv.com.au 50 Edward Street OSBORNE PARK WA 6017 ABN: 96 520 810 622

7 March 2023

Dear Andrew,

RE: LOT 2 DRIVER ROAD, DARCH

Further to my letter dated 17 February 2023, we have received feedback from Department of Health in relation to Parcel Darch Pty Ltd ongoing commitment to the monitoring and post development mitigation (if required).

Based on this feedback from the Department of Health, Parcel Darch Pty Ltd commits to ongoing monitoring until a CS1 level is achieved for a 12 month period within each stage. The monitoring locations were specified in Figure 6 of the Remediation Action Plan and will be incorporated in future Site Management Plans. These may likely be amended following review to align with open space and accessibility as provided in the Kinmore Green Sales Plan. The nominated monitoring locations are within road reserves and rear of lots to be retained by Parcel Darch Pty Ltd until CS1 levels are observed for 12 months of each stage

This monitoring plan, included in the RAP, addresses the Estate as a whole. Further monitoring bores will be installed in consultation with the project consultant team and Auditor. These final locations will be placed in future Site Management Plans. Any bores that may be damaged will be reinstated immediately to ensure continuity of the data. The monitoring commitment will continue for the balance of the site.

Yours sincerely,

JEREMY CORDINA

– Parcel Property

POA: O127582 Parcel Darch Pty Ltd

Cc: Penny Woodberry | Penny.Woodberry@dwer.wa.gov.au David Jackson | David.Jackson@health.wa.gov.au

Encl: Ongoing monitoring bore plan provided within Site Management Plan

Updated monitoring bore plan to align with retained lots, car parks and road reserves

Letter from Parcel Darch Pty Ltd dated 17th February 2023

T +61 8 9200 4000 info@parcelproperty.com.au 301 Vincent Street, Leederville WA 6007 PO Box 175, Leederville WA 6903
C O P Y R G H T 2 0 2 2 T H S F G U R E A N D T S C O N T E N T S R E M A N S T H E P R O P E RT Y O F G A LT E N V R O N M E N TA L P T Y LT D A N D M AY N O T B E R E P R O D U C E D W T H O U T P R O R A P P R O VA L T H S F G U R E S H O U L D B E R E A D N C O N U N C T O N W T H T H E A C C O M PA N Y N G R E P O R T ACN Tel A re s :161708998 :+61(0)86272-0200 G ltEnvironm ent a lPtyLt :50E w rd Street O b orne P a rk A6017 A Rev Fig No Job No FIGURE6 J1801113-18 SCALE DRA N CHECKED DATEDRA N DATECHECKED GDA1994 GAZ one 50 PROJECTION BP 8/12/2022 DAC (A3) 8/12/2022 STAGE 01C STAGE 02A STAGE 08 STAGE 09 STAGE 01Commercial STAGE 03 STAGE 04 STAGE 05 STAGE 06 STAGE 07 STAGE 01-POS STAGE 01A STAGE 01B STAGE 02B STAGE WAPC 159333 391,200 391,200 391,400 391,400 391,600 391,600 391,800 391,800 6 4 8 0 0 0 0 6 4 8 0 2 0 0 6, 4 8 0, 2 0 0 6 4 8 0 4 0 0 6, 4 8 0, 4 0 0 6 4 8 0 6 0 0 6, 4 8 0, 6 0 0 R a n g e v i e w R d Kingsway Furn ss Rd M o s e y S t D r i v e r R d Abbotswo o d D r E v a n d a l e R d M i r r a b o o k a A v Queensway Rd Gnangara Rd Hart m a n D r The Broadview PE RTH Avon River Wa nneroo SITE LOCATION Legend Sit e Bound a ry Stge Bound a ry I n ic a tive Ground w ter &L a nd fillGa M onitoring Loc a tion 0 40 0 20 1 0 2 0 Me s O o b 2 0 1 8 J 1 8 0 1 3 - P a c A v c e D a c 0 9 G S 0 4 M X D 1 8 J 1 8 0 111 3 - 0 1 8 - R A P - 0 6 m x d D a m o n C a k 8 1 2 0 2 2 11 0 9 0 A M 1:2500 NOTES CL EN T PROJECT LOCAT ON PARC EL PROPE RTY PROPOSED M IXED USESUBDI V ISION 26DRI V ERROAD,DARCH RE M EDIALACTIONPLAN STAGE1&2 INDICATI V EGROUNDW ATERANDLANDFILLGASM ONITORING LOCATIONS
267 269 270 271 272 273 274 275 276 196 195 194 193 192 191 190 189 188 187 186 185 184 183 182 181 180 179 214 213 212 211 210 209 208 207 206 205 204 203 202 201 200 199 198 197 226 227 228 229 230 231 232 233 234 235 236 237 238 239 240 215 216 217 218 219 220 221 222 223 224 225 252 253 254 255 256 257 258 259 260 261 262 263 264 265 266 241 242 243 244 245 246 247 248 249 250 251 277 279 280 281 282 283 284 285 286 287 288 173 174 175 176 177 178 39 40 41 42 43 44 45 46 47 48 62 61 60 59 58 57 56 55 54 53 52 51 50 49 72 71 70 69 68 67 66 65 64 63 86 85 84 83 82 81 80 79 78 77 76 75 74 73 96 95 94 93 92 91 90 89 88 87 112 111110108109 107 106 105 104 103 102 101 100 99 98 97 123 122 121 120 119 118 117 116 115 114 113 142141140139138137136 135 134 133 132 131 130 129 128 127 126 125 124 155 154 153 152 151 150 149 148 147 146 145 144 143 172 171 170 169 168 167 166 165 164 163 162 161 160 159 158 157 156 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 1 2 3 4 5 6 7 8 278 268 DISTRICT OPEN SPACE RESERVE DRAIN RESERVE DRAIN 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 Strata Access Way 272625 30 31 32 2928 33 34 20 19 21 22 23 24 B B B Stage 2B BAL 12.5 BAL 19 BAL 29 Stage 6 Stage 3 Stage 2A Stage 4 Stage 7 Stage 8 Commercial Stage 1C Group Housing Stage 9 Future Subdivision Stage 5 Existing Residential FUTURE SUBDIVISION FUTURE SUBDIVISION FUTURE SUBDIVISION FUTURE SUBDIVISION FUTURE SUBDIVISION EXISTING RESIDENTIAL EXISTING RESIDENTIAL EXISTING RESIDENTIAL EXISTING RESIDENTIAL EXISTING RESIDENTIAL FURNISS ROAD MIRRABOOKA AVENUE DRIVER R O A D ESMERELDA PASS LAVENDER CHASE Stage 1B ESMERELDA PASS MANDERSTON APPROACH TRAQUAIR PARKWAY ATTADALE AVENUE CULZEAN STREET FALKIRK ROAD COATBRIDGE PARKWAY LEVENLANE MANDERSTON APPROACH LEVENLANE T R A QU A I R P A R K W A Y DUMFRIES ROAD BLANTYRE ROAD CULROSS WAY COATBRIDGE PARKW AY Restriction of Access Stage 1A Display Village 498m² 425m² 425m² 425m² 425m² 425m² 360m² 360m² 407m² 542m² 476m² 476m² 476m² 476m² 476m² 476m² 500m² 383m² 458m² 486m² 476m² 476m² 476m² 476m² 476m² 476m² 540m² 542m² 476m² 476m² 476m² 476m² 476m² 476m² 566m² 374m² 376m² 496m² 476m² 476m² 476m² 476m² 476m² 476m² 540m² 440m² 365m² 365m² 449m² 427m² 427m² 355m² 355m² 425m² 425m² 354m² 353m² 424m² 423m² 421m² 421m² 422m² 422m² 352m² 352m² 422m² 422m² 352m² 352m² 422m² 422m² 443m² 365m² 365m² 439m² 425m² 355m² 356m² 357m² 429m² 431m² 360m² 361m² 362m² 435m² 482m² 436m² 435m² 434m² 361m² 360m² 431m² 429m² 357m² 356m² 426m² 425m² 509m² 450m² 488m² 493m² 450m² 450m² 450m² 450m² 450m² 510m² 561m² 535m² 440m² 365m² 365m² 365m² 418m² 450m² 450m² 375m² 375m² 375m² 375m² 375m² 450m² 448m² 547m² 420m² 365m² 365m² 467m² 450m² 450m² 450m² 450m² 450m² 375m² 450m² 450m² 450m² 465m² 467m² 450m² 450m² 450m² 375m² 450m² 450m² 450m² 450m² 450m² 420m² 438m² 438m² 420m² 450m² 450m² 450m² 450m² 450m² 375m² 450m² 450m² 450m² 470m² 472m² 450m² 450m² 450m² 375m² 450m² 450m² 450m² 450m² 450m² 263m ² 162m ² 162m ² 162m ² 162m ² 326m² 417m² 435m² 450m² 450m² 375m² 450m² 450m² 450m² 450m² 434m² 435m² 450m² 450m² 450m² 450m² 375m² 450m² 450m² 435m² 407m² 377m² 256m ² 162m ² 162m ² 162m ² 162m ² 162m ² 239m ² 379m² 375m² 403m² 387m² 417m² 437m² 450m² 375m² 450m² 450m² 450m² 433m² 435m² 450m² 450m² 450m² 375m² 409m² 372m² 415m² 406m² 397m² 356m² 375m² 383m² 511m² 456m² 496m² 450m² 450m² 450m² 501m² 375m² 486m² 450m² 450m² 517m² 387m² 471m² 476m² 468m² 473m² 600m² 600m² 500m² 500m²420m²420m²500m² 500m² 600m² 500m² 500m²420m²420m²500m² 500m² 600m² 500m² 500m²420m²420m²500m² 500m² 600m² 500m² 500m²420m²420m²500m² 500m² 603m² 1600m² 1840m² 1600m² 1840m² 1600m² 1840m² 1600m² 2798m² 375m² 433m² 22 8 4 4 4 4 3.84 6 15.1 12.5 34 12.5 12.5 34 24 15 24 24 15 0.7716.86.1 7 7 7 22.1 317 31 7 1 5 317 15 15 317 15 317 317 317 24 4 85 11 30 6 17 12.5 125 6 91 15 166.56.5 55 9 15 8 189 15 317 317 7 317 15 317 15 317 317 317 1 7 1 317 317 317 7 317 15 317 15 317 317 0 7 10 7 363.9 11 214 12.5 30 12 12.5 125 11 8.5 17 317 31 1 5 15 317 15 15 317 317 317 317 317 232 8.5 9 7 292 5 292 292 12 85 232 16 15 2 8 5 28 5 15 125 125 28 4 15 15 125 2 8 3 125 15 15 96 8.5 2 2 2 8.5 96 156 15 15 15 15 5 125 125 125 28 2 15 15 15 15 125 12 2 5 15 15 15 2 8 2 15 28 2 232 8.5 9 8 292 12 5 292 2 5 292 8.5 23.2 15 8 15 2 8 3 12.5 12.5 12.5 2 8 5 12.5 12.5 12.5 15 15 15 2 8 15 12.5 12.5 12.5 12.5 12.5 12.5 15 15 346.24.1 3.9 8 3 3 7 20.6 1.8 23 1 8.5 96 15.6 15 15 15 9 15 125 12.5 12.5 15 28 7 15 15 2 8 6 15 125 12.5 12 28 4 12.5 15 15 15 15 28 0 1 10 1 3.62.2 22 8.4 30 15 10.9 85 24 24 8.5 11 15 15 30 15 30 15 15 17 17 18.7 18.7 5 22 11 11 62 6 1 5 29.2 1 5 1 292 12 5 292 2 5 292 12 292 12 5 85 232 15 30 1 5 30 30 3 12 5 12 0 1 2 5 1 2 5 30 30 7 294 7 4 7 4 62 84 8444 22 85 9 2 9 2 1 125 125 106 2 2 9 125 12.1 6.2 8 3 1 8 20 15 30 15 30 15 30 30 30 30 15 2 5 30 12 5 15 30 30 30 85 4 24 85 10 2 15 30 30 30 30 15 30 15 30 30 30 30 2 3 2 85 29 2 15 1 1 15 15 9 8.5 23 2 15 30 30 15 30 15 30 30 12 5 30 30 30 30 85 24 24 85 1 5 30 30 30 1 2 5 30 1 5 30 15 30 15 30 30 15 30 30 7.14 5 169 8.5 46 27 6 27 6 6 27 6 6 27 6 6 27 6 1 92 32 16 23.7 51 6 1 30 8 8 12 4 30 5 30 1 5 1 5 30 1 12 30 30 30 30 1 5 1 5 30 1 5 9 8.5 24 24 8.5 30 1 30 1 5 30 30 30 30 4 30 7 1 6 28.5 296 11 5 4 25.5 7.24 3 18 8.5 4.3 27 6 27 6 6 27 6 6 27 6 6 27 6 6 27 6 3.6 8 5 177 4.27.1 22.1 4 5 11 25 16 15 25 15 12 259 0 4 272 7 285 15 298 5 1 15 30 1 2 2 1 2 5 30 30 30 8.5 24 1 5 1 24 85 1 5 30 15 30 30 30 7 292 30 13 286 12 15 3 279 1 4 1 6 12 3 262 16 5 243 15 6 8 1 25 13 1 25 15 13 9 4 22.1 14 1 17 30 171 30 152 30 152 91 5 30 7 4 107 15 30 15 15 30 15 12 2 7 302 14 5 30 18 4 2 5 30 12 5 7 7 3 30 5 8 9 15 30 15 30 15 5 307 4 5 311 1 2 5 1 5 316 31 6 303 10 7 85 231 7 3 5 15 15 15 4 0 15 125 125 125 4 0 125 05 0 10 10 105 125 4 0 125 125 125 15 15 125 4 0 5 12 125 105 105 105 4 0 105 125 125 125 4 0 125 15 4 0 12 125 125 4 0 125 105 105 105 105 125 4 0 125 25 12 15 15 125 4 0 125 125 125 105 4 0 105 105 0 105 5 12 125 4 0 125 151 15 40 40 46 46 0 40 46 46 40 40 46 6 40 40 4 0 2 44 245 707 40 12.5 126 12.5 53 1 2 5 1.8 289m² 238m² 238m² 270m² 270m² 270m² 270m² 270m² 270m² 270m² 270m² 270m² 458m² 291m ² 263m ² 263m ² 385m ² 318m² 181m² 181m² 181m² 181m² 181m² 227m² 209m² 235m² 193m² 4.957 9.5 8.4 7.5 1.16.5 7.5 7.5 7.5 7.5 8.5 8.5 8.5 8.5 8.5 8.5 8.5 8.5 8.5 8.5 8.5 8.5 18.3 4 2 158 57 10.1 2.7 10 309 227 8.5 309 8.5 30.9 9.3 6 6 6 6 6 7.5 7.5 7.5 10 10.4 61.5 302 13.4 6 6 3.9 8.5 8.5 31 6 15.6 15 6 6 7.5 29.7 16.5 8.4 11.1 6 6 21 11.7 6 6 31.8 31.8 31.8 31.8 30.2 30.2

Friday, 17 February 2023

Andrew Miller

Sites

Prime House, 8 Davidson Terrace, Joondalup WA 6027

Dear Andrew,

Thank you for the letter to DWER’s contaminated sites auditor Servensa in relation to Lot 2 Driver Road, Darch dated 17 February 2023 enclosed to this letter.

Within this letter, DWER have requested additional information and confirmation of the developer's commitment to the site following the issue of title. Whilst Servensa will respond to the request for additional information, Parcel Darch Pty Ltd (the Developer) would like to provide the following commitment to DWER and our customers beyond the issue of title for stages currently complete.

Lot 2, 2 Driver Road Development is a 321 lot development of which the first 70 lots are complete. The forecast development timeframe for the balance of the development is 5 years and Parcel Darch Pty Ltd commits to the ongoing monitoring of the completed lots to ensure mitigation measures are performing as intended. The first stage of the development was completed in April 2022 and since this time, post-development monitoring has demonstrated the effectiveness of the mitigation measures.

Parcel Darch Pty Ltd also commits to additional remediation measures should post-development monitoring demonstrate an unacceptable risk to human health on or off-site with the intent of ensuring that buildings within and adjacent to the development are suitable for occupation.

Based on the exhaustive information and validation provided over the past 18 months Parcel Darch Pty Ltd is hopeful that this letter along with the information requested in your letter, to be provided by Servensa will allow DWER to release the required clearances for the site.

If you have any concerns or questions with the information outlined above do not hesitate to contact the undersign on 0437 399 994.

Yours sincerely

POA: O127582 Parcel Darch Pty Ltd

Cc: Penny Woodberry | penny.woodberry@dwer.wa.gov.au

T +61 8 9200 4000 info@parcelproperty.com.au 301 Vincent Street, Leederville WA 6007 PO Box 175, Leederville WA 6903

Our ref: DMO2765, DEC7644/5

Enquiries: Penny Woodberry, Ph 6364 7197

Email: penny.woodberry@dwer.wa.gov.au

Email: vanessa.bryant@senversa.com.au

MANDATORY AUDITOR’S REPORT – LOT 2 DRIVER ROAD, DARCH

Thank you for submitting the report ‘Mandatory Auditor’s Report 26 Driver Road, Darch, Western Australia’ (Senversa, 16 December 2022) (the MAR) and supporting consultants’ reports to the Department of Water and Environmental Regulation (the department). The MAR and reports were received on 19 December 2022. The addendum to the MAR providing supplementary information was received on 18 January 2023.

It is understood that the MAR and addendum were prepared to satisfy Condition 1 of the Western Australian Planning Commission (WAPC) subdivision approval no. 159221 set for Lot 2 Driver Road, Darch on 6 April 2021. The MAR and addendum follow the submission of previous milestone MARs in June 2021, April 2022 and June 2022.

Following a preliminary review of the MAR, the department and the Department of Health (DoH) agreed that further review of the GasSim modelling supporting the landfill gas risk assessment was warranted. This is because of the complexity and sensitivity of the proposed development, and the significant reliance of the risk assessment on this modelling work. As such, the department requested additional details of the experience of the auditor’s supporting expert and the level of review of the GasSim model carried out by the supporting expert. The requested details were provided by the auditor as part of the addendum to the MAR.

In addition, internal advice was sought from the department’s Industry Regulation, Waste Industries branch (Industry Regulation) with experience in the use and review of GasSim modelling in landfill gas risk assessment. The response to the internal advice request indicated that GasSim is broadly used, and is the most common model for applications assessed by Industry Regulation for existing and proposed landfill cells. The model is commonly referenced in extra jurisdictional landfill guidelines and standards. In addition, Industry Regulation indicated that the inputs applied in the model are in accordance with the GasSim requirements.

Industry Regulation highlighted the following aspects which have the potential to influence the accuracy and appropriateness of the outputs and resultant measures:

• Material characterisation:

The Landfill Gas Generation Assessment1 states that deposited uncontrolled materials are representative of a relatively inert landfill that is not significantly biochemically active. Industry Regulation notes that the Geotechnical Reports2,3 used to develop inputs into GasSim do not provide detailed and comprehensive characterisation of the waste types within the uncontrolled fill areas. Given the sensitivity of the proposed land use, a Detailed Geological Assessment for the full extent of the historical waste body would provide a higher level of certainty for the model input values and estimates.

The level of conservativeness and relevant rationale built into the inputs and resulting mitigation methods is noted, however, Industry Regulation is unable to provide specific advice on whether this conservativeness is sufficient to account for the uncertainties in the material properties of the waste body.

• Settlement / stability:

The Geotechnical Reports characterise the lots as ‘locally loose, deep (up to 25m) uncontrolled fill containing putrescible material’. Noting that overall and differential settlement due to the heterogeneity in waste composition and degradation represent a risk to liner integrity in the gas mitigation membrane, the Geotechnical Reports include recommendations for manual compaction of the exposed waste via a vibratory roller prior to placement of remedial layers and the membrane. This recommendation does not appear to have been proposed in the Conceptual Design4 or Technical Specification5 .

Where the auditor queries the expected settlement and associated membrane resilience (in the MAR Appendix A), the quoted values of 0 to 20 millimetres appear to represent the lower end of the suggested range within the geotechnical reports for well compacted fill. The consultant states that the reinforced limestone raft underlying the membrane is designed to mitigate differential settlement and associated strains on the membrane. There does not appear to be robust demonstration of the ability of the limestone raft layer to fulfil this function.

1 Landfill Gas Generation Assessment, Former Landfill Lot 2, 26 Driver Road Darch WA (Core Environmental Projects, 17 November 2022)

2 Geotechnical Assessment – Stage 1 Proposed Mixed-Use Development 26 Driver Road, Darch (Galt Geotechnics, 17 September 2019)

3 Geotechnical Assessment Proposed Mixed-Use Development 26 Driver Road, Darch. (Galt Geotechnics, 21 October 2019)

4 Conceptual Design of Building Gas Protection Measures, Lot 2, 26 Driver Road Darch (Core Environmental Projects, 17 November 2022)

5 Technical Specification for Gas Risk Mitigation System, Stage 1 & 2, 26 Driver Road Darch WA (Core Environmental Projects, 23 May 2022)

Assurance:

The Construction Quality Assurance Plan6 includes only manufacturer’s quality assurance, on-site visual inspection and non-destructive weld tests for installation. This may be sufficient for separation geotextiles but for an HDPE membrane as part of a critical containment landfill cap proposal, Industry Regulation generally require the CQA plan to include on-site post-delivery CQA conformance testing (including destructive tests for materials and welds) with the requirement for submission of a detailed validation report assessing compliance with values and tolerances within the plan, including laboratory results. Sub-grade and interface stability assessments may be required depending on the siting and geometry of the waste body.

The department requests that further discussion is provided for each of the above aspects responding to the points raised by Industry Regulation.

The department recognises that it is likely not possible to remove all uncertainty in the landfill gas risk assessment carried out. Therefore, the department requests confirmation of the proponent’s commitment to implement necessary contingency actions to address potential unacceptable risks to human health post-development on or off-site, and to ensure that residences and buildings within or adjacent to the development are suitable for occupation. This includes the Stage 1A development where the department understands that civil works are now complete.

The department looks forward to the receipt of additional information addressing the above. The MAR, addendum to the MAR and the technical advice received from Industry Regulation has been referred to the DoH for review, who may have additional questions or points for clarification.

In closing, the department reiterates the previous recommendation for communication and data sharing between the different parties progressing development of Lot 1 Furniss Rd and Lot 2 Driver Rd to ensure consistency in approach to risk assessment and remedial planning in the context of the proposed development as a whole. Given the potential for the separate development plans of Lot 1 and Lot 2 to impact the other, alignment between the different parties is likely to ensure the best outcome for future site users and adjacent receptors in relation to effective long-term management of the potential risks to human health associated with ground gas.

If you have any queries in the interim, please contact Manager Contaminated Sites, Penny Woodberry, on 6364 7197

Yours sincerely

17 February 2023

6 Construction Quality Assurance Plan for Gas Risk Mitigation System, Stage 1 & 2, 26 Driver Road Darch (Core Environmental Projects, 23 May 2022)

• Construction Quality

Friday, 17 February 2023

Andrew Miller

Sites

Prime House, 8 Davidson Terrace, Joondalup WA 6027

Dear Andrew,

Thank you for the letter to DWER’s contaminated sites auditor Servensa in relation to Lot 2 Driver Road, Darch dated 17 February 2023 enclosed to this letter.

Within this letter, DWER have requested additional information and confirmation of the developer's commitment to the site following the issue of title. Whilst Servensa will respond to the request for additional information, Parcel Darch Pty Ltd (the Developer) would like to provide the following commitment to DWER and our customers beyond the issue of title for stages currently complete.

Lot 2, 2 Driver Road Development is a 321 lot development of which the first 70 lots are complete. The forecast development timeframe for the balance of the development is 5 years and Parcel Darch Pty Ltd commits to the ongoing monitoring of the completed lots to ensure mitigation measures are performing as intended. The first stage of the development was completed in April 2022 and since this time, post-development monitoring has demonstrated the effectiveness of the mitigation measures.

Parcel Darch Pty Ltd also commits to additional remediation measures should post-development monitoring demonstrate an unacceptable risk to human health on or off-site with the intent of ensuring that buildings within and adjacent to the development are suitable for occupation.

Based on the exhaustive information and validation provided over the past 18 months Parcel Darch Pty Ltd is hopeful that this letter along with the information requested in your letter, to be provided by Servensa will allow DWER to release the required clearances for the site.

If you have any concerns or questions with the information outlined above do not hesitate to contact the undersign on 0437 399 994.

Yours sincerely

POA: O127582 Parcel Darch Pty Ltd

Cc: Penny Woodberry | penny.woodberry@dwer.wa.gov.au

T +61 8 9200 4000 info@parcelproperty.com.au 301 Vincent Street, Leederville WA 6007 PO Box 175, Leederville WA 6903

Our ref: DMO2765, DEC7644/5

Enquiries: Penny Woodberry, Ph 6364 7197

Email: penny.woodberry@dwer.wa.gov.au

Email: vanessa.bryant@senversa.com.au

MANDATORY AUDITOR’S REPORT – LOT 2 DRIVER ROAD, DARCH

Thank you for submitting the report ‘Mandatory Auditor’s Report 26 Driver Road, Darch, Western Australia’ (Senversa, 16 December 2022) (the MAR) and supporting consultants’ reports to the Department of Water and Environmental Regulation (the department). The MAR and reports were received on 19 December 2022. The addendum to the MAR providing supplementary information was received on 18 January 2023.

It is understood that the MAR and addendum were prepared to satisfy Condition 1 of the Western Australian Planning Commission (WAPC) subdivision approval no. 159221 set for Lot 2 Driver Road, Darch on 6 April 2021. The MAR and addendum follow the submission of previous milestone MARs in June 2021, April 2022 and June 2022.

Following a preliminary review of the MAR, the department and the Department of Health (DoH) agreed that further review of the GasSim modelling supporting the landfill gas risk assessment was warranted. This is because of the complexity and sensitivity of the proposed development, and the significant reliance of the risk assessment on this modelling work. As such, the department requested additional details of the experience of the auditor’s supporting expert and the level of review of the GasSim model carried out by the supporting expert. The requested details were provided by the auditor as part of the addendum to the MAR.

In addition, internal advice was sought from the department’s Industry Regulation, Waste Industries branch (Industry Regulation) with experience in the use and review of GasSim modelling in landfill gas risk assessment. The response to the internal advice request indicated that GasSim is broadly used, and is the most common model for applications assessed by Industry Regulation for existing and proposed landfill cells. The model is commonly referenced in extra jurisdictional landfill guidelines and standards. In addition, Industry Regulation indicated that the inputs applied in the model are in accordance with the GasSim requirements.

Industry Regulation highlighted the following aspects which have the potential to influence the accuracy and appropriateness of the outputs and resultant measures:

• Material characterisation:

The Landfill Gas Generation Assessment1 states that deposited uncontrolled materials are representative of a relatively inert landfill that is not significantly biochemically active. Industry Regulation notes that the Geotechnical Reports2,3 used to develop inputs into GasSim do not provide detailed and comprehensive characterisation of the waste types within the uncontrolled fill areas. Given the sensitivity of the proposed land use, a Detailed Geological Assessment for the full extent of the historical waste body would provide a higher level of certainty for the model input values and estimates.

The level of conservativeness and relevant rationale built into the inputs and resulting mitigation methods is noted, however, Industry Regulation is unable to provide specific advice on whether this conservativeness is sufficient to account for the uncertainties in the material properties of the waste body.

• Settlement / stability:

The Geotechnical Reports characterise the lots as ‘locally loose, deep (up to 25m) uncontrolled fill containing putrescible material’. Noting that overall and differential settlement due to the heterogeneity in waste composition and degradation represent a risk to liner integrity in the gas mitigation membrane, the Geotechnical Reports include recommendations for manual compaction of the exposed waste via a vibratory roller prior to placement of remedial layers and the membrane. This recommendation does not appear to have been proposed in the Conceptual Design4 or Technical Specification5 .

Where the auditor queries the expected settlement and associated membrane resilience (in the MAR Appendix A), the quoted values of 0 to 20 millimetres appear to represent the lower end of the suggested range within the geotechnical reports for well compacted fill. The consultant states that the reinforced limestone raft underlying the membrane is designed to mitigate differential settlement and associated strains on the membrane. There does not appear to be robust demonstration of the ability of the limestone raft layer to fulfil this function.

1 Landfill Gas Generation Assessment, Former Landfill Lot 2, 26 Driver Road Darch WA (Core Environmental Projects, 17 November 2022)

2 Geotechnical Assessment – Stage 1 Proposed Mixed-Use Development 26 Driver Road, Darch (Galt Geotechnics, 17 September 2019)

3 Geotechnical Assessment Proposed Mixed-Use Development 26 Driver Road, Darch. (Galt Geotechnics, 21 October 2019)

4 Conceptual Design of Building Gas Protection Measures, Lot 2, 26 Driver Road Darch (Core Environmental Projects, 17 November 2022)

5 Technical Specification for Gas Risk Mitigation System, Stage 1 & 2, 26 Driver Road Darch WA (Core Environmental Projects, 23 May 2022)

Assurance:

The Construction Quality Assurance Plan6 includes only manufacturer’s quality assurance, on-site visual inspection and non-destructive weld tests for installation. This may be sufficient for separation geotextiles but for an HDPE membrane as part of a critical containment landfill cap proposal, Industry Regulation generally require the CQA plan to include on-site post-delivery CQA conformance testing (including destructive tests for materials and welds) with the requirement for submission of a detailed validation report assessing compliance with values and tolerances within the plan, including laboratory results. Sub-grade and interface stability assessments may be required depending on the siting and geometry of the waste body.

The department requests that further discussion is provided for each of the above aspects responding to the points raised by Industry Regulation.

The department recognises that it is likely not possible to remove all uncertainty in the landfill gas risk assessment carried out. Therefore, the department requests confirmation of the proponent’s commitment to implement necessary contingency actions to address potential unacceptable risks to human health post-development on or off-site, and to ensure that residences and buildings within or adjacent to the development are suitable for occupation. This includes the Stage 1A development where the department understands that civil works are now complete.

The department looks forward to the receipt of additional information addressing the above. The MAR, addendum to the MAR and the technical advice received from Industry Regulation has been referred to the DoH for review, who may have additional questions or points for clarification.

In closing, the department reiterates the previous recommendation for communication and data sharing between the different parties progressing development of Lot 1 Furniss Rd and Lot 2 Driver Rd to ensure consistency in approach to risk assessment and remedial planning in the context of the proposed development as a whole. Given the potential for the separate development plans of Lot 1 and Lot 2 to impact the other, alignment between the different parties is likely to ensure the best outcome for future site users and adjacent receptors in relation to effective long-term management of the potential risks to human health associated with ground gas.

If you have any queries in the interim, please contact Manager Contaminated Sites, Penny Woodberry, on 6364 7197

Yours sincerely

17 February 2023

6 Construction Quality Assurance Plan for Gas Risk Mitigation System, Stage 1 & 2, 26 Driver Road Darch (Core Environmental Projects, 23 May 2022)

• Construction Quality

Appendix I: Information Brochure For Residents and Stakeholders

Galt Environmental Pty Ltd www.galtenv.com.au 50 Edward Street OSBORNE PARK WA 6017 ABN: 96 520 810 622

SITE MANAGEMENT PLAN

Congratulations on your recent purchase!

This leaflet has been created to help you understand siteworks and building on your block and any future endeavours you might undertake.

Welcome to Kinmore Green, an estate surrounded by everything you need. Life here feels just right.

The site is classified as ‘Remediated for restricted use’ under the Contaminated Sites Act 2003.

The site is COMPLETELY SAFE FOR YOU AND YOUR FAMILY based on extensive remediation done by the developer.

The Developer has lodged a Restrictive Covenant on each title within Kinmore Green which outlines all of the restrictions contained in this brochure.

SITE RISKS ARE MITIGATED BY INSTALLATION OF A GAS-PROOF MEMBRANE DEEP BELOW THE GROUND.

This membrane has been engineered to provide a factor of safety many times higher than required to provide piece of mind for residents.

The membrane is located more than 2m below each lot. Therefore you can safely excavate up to 2m for a swimming pool or spa (subject to council approval).

This classification is very common for residential estates and ensures that all health risks appropriately mitigated through certain restrictions on what you can do at your property. Remediated for Restricted use.

More information can be sourced from Parcel, DWER (Department of Water and Environmental Regulation) or the Kinmore Green website, www.kinmoregreen.com.au

YOU CANNOT BUILD ON THE PASSIVE VENTING ZONE

YOU MAY NOT DIG DEEPER THAN 2M

The location of the membrane and passive venting zone is shown on each owner’s lot plan. The passive venting zone can not have habitable structures or sealed surfaces on it. kinmoregreen.com.au

YOU CAN NOT INSTALL AN IRRIGATION BORE

Galt Environmental Pty Ltd www.galtenv.com.au 50 Edward Street OSBORNE PARK WA 6017 ABN: 96 520 810 622
Appendix J: Understanding Your Report

UNDERSTANDING YOUR REPORT

1. EXPECTATIONS OF THE REPORT

This document has been prepared to clarify what is and is not provided in your report. It is intended to inform you of what your realistic expectations of this report should be and how to manage your risks associated with the conditions on site.

Geotechnical engineering and environmental science are less exact than other engineering and scientific disciplines. We include this information to help you understand where our responsibilities begin and end. You should read and understand this information. Please contact us if you do not understand the report or this explanation. We have extensive experience in a wide variety of projects and we can help you to manage your risk.

2. THIS REPORT RELATES TO PROJECT-SPECIFIC CONDITIONS

This report was developed for a unique set of project-specific conditions to meet the needs of the nominated client. It took into account the following:

the project objectives as we understood them and as described in this report; the specific site mentioned in this report; and the current and proposed development at the site.

It should not be used for any purpose other than that indicated in the report. You should not rely on this report if any of the following conditions apply:

the report was not written for you;

the report was not written for the site specific to your development; the report was not written for your project (including a development at the correct site but other than that listed in the report); or

the report was written before significant changes occurred at the site (such as a development or a change in ground conditions).

You should always inform us of changes in the proposed project (including minor changes) and request an assessment of their impact.

Where we are not informed of developments relevant to your report, we cannot be held responsible or liable for problems that may arise as a consequence.

Where design is to be carried out by others using information provided by us, we recommend that we be involved in the design process by being engaged for consultation with other members of the project team. Furthermore, we recommend that we be able to review work produced by other members of the project team that relies on information provided in our report.

Galt Environmental Pty Ltd www.galtenv.com.au 50 Edward Street OSBORNE PARK WA 6017 Page | 1 ABN: 96 520 810 622
GALT FORM PMP29 Rev3

3. DATA PROVIDED BY THIRD PARTIES

Where data is provided by third parties, it will be identified as such in our reports. We necessarily rely on the completeness and accuracy of data provided by third parties in order to draw conclusions presented in our reports. We are not responsible for omissions, incomplete or inaccurate data associated with third party data, including where we have been requested to provide advice in relation to field investigation data provided by third parties.

4. SOIL LOGS

Our reports often include logs of intrusive and non-intrusive investigation techniques. These logs are based on our interpretation of field data and laboratory results. The logs should only be read in conjunction with the report they were issued with and should not be re-drawn for inclusion in other documents not prepared by us.

5. THIRD PARTY RELIANCE

We have prepared this report for use by the client. This report must be regarded as confidential to the client and the client’s professional advisors. We do not accept any responsibility for contents of this document from any party other than the nominated client. We take no responsibility for any damages suffered by a third party because of any decisions or actions they may make based on this report. Any reliance or decisions made by a third party based on this report are the responsibility of the third party and not of us.

6. CHANGE IN SUBSURFACE CONDITIONS

The recommendations in this report are based on the ground conditions that existed at the time when the study was undertaken. Changes in ground conditions can occur in numerous ways including anthropogenic events (such as construction or contaminating activities on or adjacent to the site) or natural events (such as floods, groundwater fluctuations or earthquakes). We should be consulted prior to use of this report so that we can comment on its reliability. It is important to note that where ground conditions have changed, additional sampling, testing or analysis may be required to fully assess the changed conditions.

7. SUBSURFACE CONDITIONS DURING CONSTRUCTION

Practical constraints mean that we cannot know every minute detail about the subsurface conditions at a particular site. We use professional judgement to form an opinion about the subsurface conditions at the site. Some variation to our evaluated conditions is likely and significant variation is possible. Accordingly, our report should not be considered as final as it is developed from professional judgement and opinion.

The most effective means of dealing with unanticipated ground conditions is to engage us for construction support. We can only finalise our recommendations by observing actual subsurface conditions encountered during construction. We cannot accept liability for a report’s recommendations if we cannot observe construction.

8. ENVIRONMENTAL AND GEOTECHNICAL ISSUES

Unless specifically mentioned otherwise in our report, environmental considerations are not addressed in geotechnical reports Similarly, geotechnical issues are not addressed in environmental reports. The investigation techniques used for geotechnical investigations can differ from those used for environmental investigations. It is the client’s responsibility to satisfy themselves that geotechnical and environmental considerations have been taken into account for the site.

Form PMP29 Rev3 30 November 2017 Galt Environmental Pty Ltd www.galtenv.com.au 50 Edward Street OSBORNE PARK WA 6017 Page | 2 ABN: 96 520 810 622

Geotechnical advice presented in a Galt Environmental report has been provided by Galt Geotechnics under a sub-contract agreement. Similarly, environmental advice presented in a Galt Geotechnics report has been provided by Galt Environmental under a sub-contract agreement.

Unless specifically noted otherwise, no parties shall draw any inferences about the applicability of the Western Australian state government landfill levy from the contents of this document. O:\Administration\Standard

Form PMP29 Rev3 30 November 2017 Galt Environmental Pty Ltd www.galtenv.com.au 50 Edward Street OSBORNE PARK WA 6017 Page | 3 ABN: 96 520 810 622
Env Logo.docx
Forms and Documents\GEPL Forms\PMP29-Rev4 Understanding your Report
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.