4 minute read

ARCHITECTURAL WORKS Academic Works

the contemplations

Waste Recovery Centre - Waste Management Area in Putri Cempo Landfill Surakarta Final Architecture Design Studio | Universitas Sebelas Maret Surakarta

Advertisement

Typology Location Supervisors

+ Panelists

Masterplan, Ecology, Revitalization TPA Putri Cempo Surakarta Complex, Central Java Dr. Ir. Musyawaroh, M.T. Ir. Sumaryoto, M.T. Dr. Yosafat Winarto, S.T, M.T. Amin Sumadyo, S.T, M.T. Realrich Sjarief (Realrich Architecture Workshop - RAW ) Ariko Andikabina (Secretary General of IAI - Ikatan Arsitek Indonesia)

This is the last academic project that I made, I started from a background that is not defined by others and try to create a new paradigm by trying to connect existing possibilities and future context.

Very grateful that this project completed and appreciated not only by the campus, but also APTARI. This work passed curation for the best national student work and I got the opportunity to present and display this final project in public and architect as a panelist. The selected panelists were Realrich Sjarief and also Ariko Andikabina, they were quite appreciative of the extraordinary ideas as well as the visualizations that I created.

- Waste Recovery Center is a waste management area that aims to solve downstream-waste problem. Through its varieties of functions, it integrates traditional and modern facilities as an innovation in the existing processing-method in Putri Cempo’s landfill, Surakarta (open dumping method), changing the paradigm of urban society towards waste.

Exhibited & Presented at AFAIR UI 2020 - Student Curated Works by APTARI (Asosiasi Pendidikan Arsitektur Indonesia) x AFAIR UI 2020

What about, if we see waste from another perspective by paying attention to the existing context not as affected or impacted,

But as potential space?

WASTE

2020 - The Beginning The Effort to Distinguished the Arrival and the Existing of the Waste

The planning of these three zones is immediately needed because the urgent to deal with the significant amount of waste that enters and to attempt to eliminate the existing landfill waste throughout the existing Putri Cempo TPA

HASTE

2025 - The Contemplation Changing People Habit and the way they Respond the Waste

The design of phase II is a complementary and refinement program as an effort to change the lifestyle of the community in dealing with waste and changing their waste-cycle behavior

TASTE

2030 - Recovery Era Surakarta as Pilot Project of the New Waste City

All of ecological aspects grow naturally and the symbiosis of the region is formed by itself. Completion of municipal solid waste is completed without the need for more landfills. In the future, this Waste Recovery Center can become a model for other cities.

WASTE SORTING & WASTE BANK HABITUATE PEOPLE & EASE THE WASTE INPUT

Z 5

INTRODUCING WASTE TO PUB;IC

AS A WAY TO AWARE AND UNDERSTANDING THE IMPACT

Z 3

ZONE 1

INNER PERSPECTIVE

ZONE 5

PARK PERSPECTIVE

interior scene at Z1 (waste drop & sort), transitional space at Z3 (quarantine cattle cage)

This article is from: