Build Up Oshkosh
8
10
9
Indicates a new listing
Build Up
Oshkosh
11
8 - 3500 N. Main St., Oshkosh Bemis Healthcare Packaging, a 162,790-sq. ft. addition to the existing manufacting facility and office complex. Project completion expected in late 2015. 9 - 1530 S. Koeller St., Oshkosh Noodles & Company, Sports Authority and Ross Dress for Less, a 42,200-sq. ft. multi-tenant retail center. Project completion expected in May. General contractor is Bayland Buildings of Green Bay. 10 - 1500 S. Washburn St., Oshkosh FloorQuest, a multi-tenant retail building to include a flooring store. 11 - 2601 Badger Ave., Oshkosh Tube Fabrication & Color, a 7,500-sq. ft. addition to the existing manufacturing facility. Project completion expected in January. General contractor is Frontier Builders & Consultants of Kaukauna. Projects completed since our December issue: • Holiday Ford, 390 N. Rolling Meadows Dr., Fond du Lac. • Love’s Travel Stop & Country Store/Subway Restaurant, 191 W. Rolling Meadows Dr., Fond du Lac. • Agnesian Healthcare/Fond du Lac Regional Clinic South, 321 Camelot Dr., Fond du Lac. • City of Oshkosh Public Works, 639 Witzel Ave., Oshkosh.
DESIGN/BUILD AND GENERAL CONTRATORS 5521 COUNTY ROAD BB • APPLETON, WI 54914 920-739-6521 • 800-331-6521 PRE-ENGINEERED METAL • MASONRY • PRECAST • CONVENTIONAL
R&R Steel Construction Co., Inc. provides a 3 Year Warranty on all work and materials, including all work and products supplied by our Sub-Contractors and Suppliers. R&R Steel Construction will repair, replace or correct defects, as per industry standards. This applies to all work performed by R&R Steel Construction Co. , Inc. and our Sub-Contractors.
RRSTEELCONSTRUCTION.COM www.newnorthb2b.com
NNB2B | January 2015 | 11