Neumann/Smith Historic Preservation + Adaptive Reuse

Page 29

The goal with this renovation was to activate the lobby by showcasing its beauty. To do this, the dropped ceiling was removed to expose the ornate, original décor.

Bedrock Detroit

First National Building Renovations As part of a dramatic renovation of the historic First National Building, Neumann/Smith was selected to modernize the landmark building’s main lobbies and a central concourse between the two, which runs through 15,000 sf of new retail space. The design was inspired by the rich architectural heritage of Detroit and the ornate décor of the original ceiling which was exposed and incorporated as an important design element. This helped us respect the existing building even while we used new materials and exposed the space to vibrant and collaborative trends, which are essentially modern. Revitalization of the lobbies included the addition of a barrier-free entrance off of Woodward, a new video display wall, custom-designed LED lighting features, and eye-catching wrap-around LED lighting panels encompassing two elevator lobbies. New marble wall features not only enhance existing marble elements, but act as a backdrop for decorative metal wall panels. On the exterior, four new canopies add decorative elements reminiscent of the building’s original era. Underneath a more ornate design, and more reflective of a “new” Detroit, LED lights with metal screening complement lobby finishes and detail.


Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.