1 minute read

0 Planning Policy 30

Lakeside House

To be read in conjunction with

Advertisement

AV Architects drawings

• 20007 - SIT - 001 - Location plan • 20007 - SIT - 002 - Existing site plan • 20007 - SIT - 003 - Proposed site plan • 20007 - SIT - 010 - Site sections

• 20007 - SIT - 011 - Site sections

• 20007 - EXT - 001 - Existing boathouse • 20007 - GEA - 001 - Proposed basement plan • 20007 - GEA - 002 - Proposed ground floor plan • 20007 - GEA - 003 - Proposed first floor plan • 20007 - GEA - 004 - Proposed second floor plan • 20007 - GEA - 005 - Proposed roof plan • 20007 - GEA - 006 - Proposed boathouse • 20007 - GEA - 010 - Proposed south elevation • 20007 - GEA - 011 - Proposed west elevation • 20007 - GEA - 012 - Proposed north elevation • 20007 - GEA - 013 - Proposed east elevation • 20007 - GEA - 014 - Proposed east elevation - Main dwelling • 20007 - GEA - 015 - Proposed elevations of pavilion A • 20007 - GEA - 016 - Proposed elevations of pavilion B • 20007 - LAN - 001 - Proposed landscape plan • 20007 - LAN - 002 - Proposed landscape plan

Arboriculture Report

• Excerpts from The Mayhew Consultancy Ltd Tree Survey from December 2018.

Ecology

• Excerpts from The Ecology Co-op Environmental Consultants Great Crested Newt

Presence / Absence environmental DNA Assessment from July 2015. • The Ecology Co-op Environmental Consultants Reptile Survey Report from

September 2015.

Heritage

• Landscape Heritage Statement prepared by Askew Nelson Ltd dated October 2018 • Management and Maintenance Plan prepared by Askew Nelson Ltd dated June 2019

Landscape and Architecture

• Document prepared by AV Architects dated May 2021

Lighting

• Lighting strategy document prepared by Alan Tulla Lighting dated April 2021

This article is from: