1 minute read

RPMC XII visits six projects during 3rd quarter monitoring

By: Lucy Mae L. Ruben, NEDA XII

Regional Project Monitoring Committee (RPMC) XII monitored six projects that were implemented in the province of Sultan Kudarat on August 15-16, 2022. The team was accompanied by representatives from the Department of Public Works and Highways (DPWH) XII, Sultan Kudarat 1st and 2nd District Engineering Offices, and NIA Sultan Kudarat Irrigation Management Office. The pertinent field monitoring reports were the subject of deliberation and problem-solving session of RPMC XII during its 3rd quarter meeting on 02 September 2022.

Advertisement

Road Widening-Awang-Upi-LebakKalamansig-Palimbang-Sarangani Road Lebak Integrated River Irrigation Project (LIRIP) CY 2022

Paving of Unpaved Roads - SNA-Lebak-Kalamansig Road

Construction of River Bank Protection and Flood Control at Hinalaan River Construction of Flood Control Structure Ala River (Panas-Bambad Section)

Construction of Flood Mitigation and Control Structure Ala River (Dansuli Section)

This article is from: