Seajacks Scylla
Leviathan sailing
Zaratan installing monopile
range of support and services for the project, including scour protection. DolWin Alpha Convertor Platform – Seajacks Zaratan has been providing installation assistance to the crews installing the DolWin Alpha Convertor Platform. This platform will connect 3 wind farms - MEG Offshore 1, Borkum Riffgrund 1 and Borkum West 2, a total of 160 wind turbines.
This latest maintenance project adds to Seajacks’ growing portfolio of successful O&M campaigns. Seajacks were noted in a recent case study from The Crown Estate, Jack Up Vessel Optimisation, which explained how jack up activities for O&M work can be optimised in the offshore wind sector. Seajacks are always looking at ways to develop their success further with providing fixed solutions that reduces cost and risks of maintaining offshore wind farms.
From Seajacks’ current strong position within the O&M market, Seajacks are developing O&M solutions across a large customer base for the provision of O&M services, the early development engagement will happen over the winter period with a view to establishing an O&M Jack Up solution from Spring 2015. Contact Seajacks for: • O&M work • T&I Services • EPCI Services For more information about the services Seajacks offer call: +44 1493 841 400
111
Spring Campaign – O&M work was successfully undertaken by Leviathan on offshore wind farms off the East Anglian coast. The wind farm owners worked together to share the costs of vessel mobilisation and in return their WTGs were maintained and downtime was significantly reduced. Seajacks
NG2500X vessels are suited to the O&M industry as they are capable of working in water depths of up to 55 metres with crane capacities up to 800t.
Hydra at SylWin Alpha