PROCEDURES MANUAL OCCUPATIONAL HEALTH & SAFETY

Issued: SD Checked: WF Approved: HF

system to control OH&S risks and improve OH&S performance. 4.3

Individual health and safety programs cover the prevention of injury; the prevention of ill health; and the reduction of hazards are detailed in action plans: •

18WI-433-001 – Prevention of injury,

18WI-433-002 – Prevention of ill health, and

18WI-433-003 –Reduction of hazards.

4.4

Additional health and safety programs may result from the assessment and identification worksheets used in 18AP-431 and EHAP-432. Such programs are similarly detailed in action plans & timing charts where action plan instructions 18WI-434-040, etc are reserved for this purpose.

4.5

The department heads are responsible to develop and detail the required action plans, taking into consideration following project management items such as: •

An objective and measurable target

Action items to be taken

Responsibility for the project

Start and target completion dates for action item

The results expected to be achieved

The identification of milestone/significant dates

A time frame for regular planned progress reviews

4.6

The development of the health and safety programs and project details are provided on action plan & timing chart form F-434-002. At the project management level, the activities incorporate a Plan-Do-Check-Act continual improvement philosophy.

5.0

Reviews of objectives and targets for OH&S programs

5.1

For the developing OH&S system, the QMS / EMS / OHS steering team reviews on a monthly basis. 5.1.1

The progress of each relevant level and function in achieving the objectives and targets for OH&S programs. Should reviews indicate unsatisfactory progress, the QMS / EMS / OHS management rep directs the appropriate unit/department head to institute corrective and preventive action, per procedure QEH-QP-852.

5.1.2

The appropriateness of OH&S programs as a result of changing requirements, new identified hazards, nonconforming incidents, emergency events, regulatory requirements, and corporate change.

5.2

For the operating OH&S, the OH&S programs are reviewed during management reviews, with the procedure QEH-AP-560.

6.0

Records

Procedures Manual Occupational Health & Safety Date printed 8/30/12 6:05 PM