Portafolio Nadia Rodriguez Valdiviezo

Page 1

DESIGN PORTFOLIO Nadia Rodriguez Valdiviezo

+64 22 093 2007 nrodriguezv@pucp.pe


RESUME Education

Nadia Rodriguez Valdiviezo

Architect and Urban Planner

Pontifical Catholic University of Peru (PUCP) 2009 - 2015 Faculty of Architecture and Urbanism (FAU) Merit grade in graduate thesis “Comunidad” Czech Technical University in Prague (CVUT) 2013 - 2014 Faculty of Architecture Academic Exchange

Work Experience Architectural Graduated at Michael Cooper Architects Auckland, New Zealand Feb 2021 - Present

Profile Architect by the Pontifical Catholic University of Peru. Five years of professional experience in architecture studies, social works and independent projects.

Contact +64 22 093 2007 nrodriguezv@pucp.pe linkedin.com/in/nadia.rodriguez-valdiviezo issuu.com/nadiar.valdiviezo

Development of resindential projects from concept to construction, including consenting. Main point of contact for clients and builders. Effectively work as part of a team and manage individual projects independently. Architect at Reynaldo Ledgard Architects Lima, Peru Jan 2017 - Jul 2019 Development of architectural projects at the level of conceptual design and construction detail. Coordination with customers and suppliers. Compatibilization with the different specialties. 2018 - 2019

Britanico in Santa Anita. Lima, Peru. (completed)

2018 - 2019

Pre-University Center and Peruvian Agriculture Museum UNALM. Lima, Peru. (project delivered)

2018 - 2019

Second stage of Colegio de Ingenieros CIP. Lima, Peru. (project delivered)

2017 - 2019

First stage of Colegio de Ingenieros CIP. Lima, Peru. (completed)

2017 - 2019

USIL in Arequipa, Peru. (project delivered)

2018 - 2019

School Pool CSIR. Lima, Peru. (under construction)


Architect for Women Emergency Center (CEM) Ministry of the Interior Lima, Peru Oct 2018 - Dec 2018 Development of the 70 centers for the integral attention of cases of violence against women, family group members and sexual violence. Design Team leader: oversaw the development, execution of project plans. Delivered to the ministry in February 2019. Construction Supervisor at Durabuild S.A.C. Lima, Peru Mar 2016 - Dec 2016

Technical Skills CAD Programs: AutoCad, Revit, SketchUp Adobe Creative Suite: Photoshop, Ilustrator, InDesign Microsoft Office: Word, Excel, Power Point Laser cutting Hand drafting Model making

Languages Spanish English French

Durabuild is a supplier and installers of drywall (gypsum board) and acoustic ceiling tile systems. Produced product specification based on architectural plans. On-site supervision of construction team. Intern Architect at DESSIN TECHNISCH Lima, Peru Mar 2015 - Dec 2015 Project development. Architectural plans validation for international firms and development of single-family housing projects in London. Intern Architect of GYPLAC for ETEX GROUP Lima, Peru May 2014 - Feb 2015 Development of technical specifications for cultural, commercial and multi-family housing buildings.

International Workshops Workshop Juan Herreros at San Sebastian University (USS) Santiago de Chile, Chile Oct 2016 LIMAPOLIS 2012 at Pontifical Catholic University of Peru (PUCP) Lima, Peru Mar 2012 SOS CIUDADES Iquitos, Peru Apr 2011



DESIGN


Auckland, New Zealand Michael Cooper Architects.


Prasad & Sargam Seelam Project development

2021 - Present 3 Kumukumu Road Long Bay in Auckland, New Zealand State _ BC Set MICHAEL COOPER ARCHITECTS Lead Architect Michael Cooper

Prasad & Sargam Seelam is a 200sm residencial project. The house consists of: a dining/living room, kitchen, 4 bedrooms, 2 bathrooms, a family room and a prayer room. The client wanted a simple house but with an elaborate facade, he wanted to be visible and stand out within the complex of the townhouses and high ceilings. This project was one of the first projects that I was commissioned to develop in NZ. My responsabilities included the development of the project, the delivery of the building consent, and all the documentation. I worked under the lead architect, he checked the work weekly before sending all the drawings to the clients for a final review.


Side View

Front view


SOUTH ELEVATION

E

D

C

B

A

A

18/1

PROJECT

21025 SITE

3 KUM LONG CLIENT

PRAS

DRAWING

ELEV

DRAWING

A20

EAST ELEVATION

East Elevation

DRAWING

18/10/

1

2

3

4

A

B

C D

E

A

Ground Floor Plan

18/10/2021 BUILDING CONSE

PROJECT NUMBER

GROUND FLOOR PLAN

21025 SITE

3 KUMUKUMU ROAD LONG BAY CLIENT

PRASAD & SARGAM S

DRAWING

GROUND FLOOR PLA

DRAWING NO

A300

DRAWING DATE

18/10/2021

REV

A

SC

1:


Andrew & Kalena Lobb Project development

2021 - Present 3 Pheasant Lane Waimauku in Auckland, New Zealand State _ BC Set MICHAEL COOPER ARCHITECTS Lead Architect Michael Cooper

I joined the project right after the design was finished and Michael Cooper, the lead architect, was finalizing some changes with the clients. I have worked with the lead architect since them. I have been responsible for the client’s day-today, project reports, and documentation delivery. I have tried to develop a routine in the project during the quarantine. I have morning meetings with the lead architect very useful, set targets and goals for the day. As well as weekly meetings with the clients. to keep them updated on the projects. Under the direction of a principal, I have dealt efficiently with many variations the client requested throughout the house.


6

7

3

4

2

1

NORTH ELEVATION

North Elevation A

1

5

2

C

B

3

4

5

D

6

7

A

22/10/2021 BUILDING CONSENT ISSUE

PROJECT NUMBER

21035 SITE

3 PHEASANT LANE WAIMAUKU CLIENT

ANDREW AND KALENA LOBB

DRAWING

ELEVATIONS

A

WEST ELEVATION

DRAWING NO

A200

DRAWING DATE

22/10/2021

REV

A

SCALE AT A3

1:100

B

C D

Ground Floor Plan

GROUND FLOOR PLAN

LEGEND A

22/10/2021 BUILDING CONSENT ISSUE

PROJECT NUMBER

21035 SITE

3 PHEASANT LANE WAIMAUKU CLIENT

ANDREW AND KALENA LOBB

DRAWING

GROUND FLOOR PLAN

DRAWING NO

A300

DRAWING DATE

22/10/2021

REV

A

SCALE AT A3

1:100


Britanico / Santa Anita completed Project development and detailed design for the new building Britanico in Santa Anita.

2017 - 2019 Britanico Santa Anita in Lima, Peru State _ Completed REYNALDO LEDGARD ARCHITECTS Lead Architect Reynaldo Ledgard with Daniela Beraún Paola Nicolacci Roberto Villalobos

We obtained first place in the competition for the new building of Asociación Cultural Peruano - Britain (Britanico) in the district of Santa Anita in Lima, Peru. The required program consisted of 60 classrooms, a library, an auditorium, an art gallery, a cafeteria and a staff room. The main challenges of the project were working with a very compact site with no adjacent buildings. Currently, the project has been delivered to the client and is in use. The main strategy was to put all the public uses on the ground level and therefore fit the 60 classrooms, from the first to the fourth floor. The structural solution includes variations in the columns between the basements, the first floor and the upper levels to be able to solve the parking in 3 basement levels. The result is a very compact but efficient building.

The ground level was designed very transparent towards the outside, giving the street lighting, and setting a reference for future neighbors. The front of the land has a north-east orientation, so a diagonal sunshade facade (45 degrees) was designed, allowing light to enter through the north orientation. These parasols are made of red painted glass and transparent windows. The red painted pieces have an interior drywall so as not to let the light pass through these sections.


@Gladys Alvarado Jourde

View of the building from the street (front facade)


Ground Floor

Upper Floors (typical)


@Gladys Alvarado Jourde

Front door view @Gladys Alvarado Jourde

Panels of the main facade seen from below


@Gladys Alvarado Jourde

View of the panels (front facade)

Section plan

Section elevation

Elevation


@Gladys Alvarado Jourde

Interior view from the passage (top floor)

@Gladys Alvarado Jourde

View of the main entrance from the inside

@Gladys Alvarado Jourde

Vertical circulation block, view of the street

@Gladys Alvarado Jourde

Upward view from an inner courtyard


E

F

H

D

G

Longitudinal section of the building auditorium In the section, the irregular shape of the acoustic ceiling of the auditorium is appreciated 3

2

1

Cross section of the building auditorium The triangulation of the wooden panels with the different sizes in the steel sections is what achieves this type of acoustic ceiling.


@Gladys Alvarado Jourde

Passage on the first level, on the left is the auditorium and on the right is the cafeteria @Gladys Alvarado Jourde

Cafeteria terrace


Colegio de Ingenieros del Perú / CIP completed Project development and detailed design for the new building in San Isidro.

2017 - 2019 Colegio de Ingenieros del Peru / CIP in Lima, Peru State _ Completed REYNALDO LEDGARD ARCHITECTS Lead Architect Reynaldo Ledgard with Daniela Beraún Paola Nicolacci Roberto Villalobos

The property of the College of Engineers Departmental Council Lima faces the street on three sides and is located in the district of San Isidro, Lima. The project has been developed independently, without connection with the existing buildings. The project “Office Building, Parking and Auditorium of the College of Engineers of Peru - Lima Departmental Council”, has two sections. In one there is an auditorium and in the other a four-story office building. It also has four basement levels that make up a unified parking lot, which allows for a single entry and exit. The auditorium has pedestrian access from the street, including an elevator for the disabled, through an open plaza. It has a total capacity of 803 people, and has a ground level and mezzanine. The office building has access from the main

avenue, and from a double-height roofed square that visually expands the space, as well as the entrance hall of the office building. All levels have rental offices for architectural and engineering uses. The total built area is 13,764.33 m2.


@Gladys Alvarado Jourde

View from below of the office block


SECOND PART FIRST PART COLEGIO DE INGENIEROS DEL PERU COLEGIO DE INGENIEROS DEL PERU

Ground floor MASTERPLAN The entire property of the College of Engineers - Departmental Council Lima has a total area of 5170.50 m2. Within this area is the first built part of the project with an area of 4,266.00 m2. This second project has an area of 904.50 m2. The total constructed area of the new building is 16 372.43 m2. The total built area of the integrated project is 30 120.88 m2.


@Gladys Alvarado Jourde

Curtain Wall Curtain wall seen from inside the offices

Enclosure Details

Section 1

Section 2

Section 3


@Gladys Alvarado Jourde

View of the office building from the main avenue

@Gladys Alvarado Jourde

View from below of the office block

@Gladys Alvarado Jourde

Main entrance of the office building from the main avenue

@Gladys Alvarado Jourde

View of the roof over the covered square


@Gladys Alvarado Jourde

Facade The auditorium facade is made of wood (in the first level) and corten steel in the upper part of the building.

@Gladys Alvarado Jourde

Details Corten steel wall.

@Gladys Alvarado Jourde


@Gladys Alvarado Jourde

Interior view of the Auditorium

.55

39 38 37 36 35 34 33 32 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1

Section of the Auditorium


Auditorium’s Acoustic walls

4

3

2

1

D C

D C Acoustic wall’s section. Identification of the panels that creates the acoustics walls.

B

A

Trapezium. Triangulation of the panles for construction.

Section. To know the true magnitude of the sides of the triangles, cuts were made at different points of elevation to know the length of the sides.


Colegio de Ingenieros del Perú / CIP Second part project delivered Project development of the second part of Colegio de Ingenieros, Project delivered to the municipality for consenting.

2018 - 2019 Colegio de Ingenieros del Peru / CIP Second Part in Lima, Peru State _ Project Delivered for consenting REYNALDO LEDGARD ARCHITECTS Lead Architect Reynaldo Ledgard with Daniela Beraún Paola Nicolacci Roberto Villalobos

To meet local planning laws the proposed new building is integrated to the completed project (auditorium and offices). The new building consists of 4 floors and 4 basement levels for use as the Institutional Headquarters Professional College with their respective parking lots. The parking lots of both buildings are connected at all levels. The historical entrance of the College of Engineers has been preserved in its current location but it has not been considered for the calculation of evacuation as it will be used only in ceremonial events. The connection between the built project and the new building occurs only occasionally because each building has its own evacuation route.


Pedestrian traffic Support area / services Offices Collegiate service

Basement 4 In the basement 4 there is a parking level, a multipurpose room for use by the CIP, service area and bathrooms.

Pedestrian traffic Support area / services Offices Collegiate service

Basement 3 In the basement 3 the parking plant is repeated but together with bathrooms and changing rooms, in addition to some CIP offices and the double height of the SUM. Pedestrian traffic Support area / services Offices Collegiate service

Basement 2 In the basement 2 there is a patio and multipurpose room for the use of the CIP, there is also an exercise area, reading room, general medicine offices, topical and lacteal.

Pedestrian traffic Support area / services Offices Collegiate service

Basement 1 In the basement 1 there is a cafeteria for internal use, next to a garden and terrace, three multipurpose rooms for CIP use, a security office, and car and bicycle parking.


Ground floor In addition, between the basement 1 and the first floor, a conference room is proposed for the use of the College, which has access to both Basement 1 and the first floor. The offices of the College with greater access to the public are concentrated on the first floor, such as attention to the collegiate and treasury. An extension is also being projected to the stage of the built auditorium, which will add a backstage and dressing room space.

Pedestrian traffic Support area / services Offices Collegiate service

First floor

Pedestrian traffic Support area / services Offices Collegiate service

Second floor

Finally, from the first to the third floor, there are school offices and 3 integrated multi-purpose rooms, for use by the CIP, at each level.


SECOND PART FIRST PART

Elevation of the first and second part of the proyect

Project view View from the street of the office building of the second part of the project and the auditorium facade

Elevation of the second part of the project showing the historic entrance

Project view


Longitudinal section This sections shows the inner courtyard and the sports field of the building

SECOND PART FIRST PART

Longitudinal section


Internal view showing the inner courtyard

View of the courtyard of the cafeteria in basement 1

View of the sports court

Sports court stands


USIL project delivered Project development and detailed design for the new building of the University in a South City of Peru.

2017 - 2019 San Ignacio de Loyola University / USIL in Arequipa, Peru State _ Project Delivered for consenting REYNALDO LEDGARD ARCHITECTS Lead Architect Reynaldo Ledgard with Daniela Beraún Paola Nicolacci Roberto Villalobos

Facilities for the San Ignacio de Loyola University (USIL), the Institute of Entrepreneurs (IE) and the Postgraduate of the University of the same house of studies are projected in the masterplan of the USIL Arequipa Campus. In addition, it includes a sports area, outdoor recreation area and parking space within the site. In total, 50 classrooms of varied typology will be implemented (35 classrooms, 4 computer labs, 2 kitchen laboratories and one bakery, 3 multipurpose rooms and 3 staggered classrooms). The project will have student service spaces such as cafeteria, 2 libraries, a chapel, 10 study rooms, topic, lactarium, sports hall with dressing rooms, and a VIP computer room in the University. Administration spaces will also be implemented for each entity and teacher

services (staff room, records and academic services, etc.) separately for the university and the institute. The campus seeks to have a low environmental impact for which, the design and construction of the campus will consider high standards of climatic efficiency that allow it to obtain a LEED certification, in addition to having 70% of free land area. A central square has been designed with trees that provide shade for daily movements on campus, and terraces with vegetation to expand the green areas to the upper parts of the building.


Main facade of the project

Inner courtyard of the university and institute building


Interior view of the university building and the institute, where you can see the inner courtyard and curtain walls


TECHOS

TECHOS

NPT. +17.50 m

NPT. +17.50 m

PISO 5

PISO 5 NPT. +14.00 m

NPT. +14.00 m

PISO 4

PISO 4 NPT. +10.50 m

NPT. +10.50 m

PISO 3

PISO 3

NPT. +7.00 m

NPT. +7.00 m

PISO 2

PISO 2

NPT. +3.50 m

NPT. +3.50 m

PISO 1

PISO 1

NPT. 0.00 m

NPT. 0.00 m

7.90

A

4.10

B

7.30

7.60

C

7.60

15.32

E

D

J

F

SÓTANO NPT. -3.50 m

Elevation Elevation of the main facade of the university and institute building NPT. +18.65 m

NPT. +17.65 m

NPT. +15.65 m

NPT. +15.65 m

NPT. +14.65 m

NPT. +14.65 m

TECHOS NPT. +13.65 m

NPT. +13.60 m

PISO 4

PISO 4

NPT. +10.10 m

NPT. +10.10 m

PISO 3

PISO 3

NPT. +6.60 m

NPT. +6.60 m

PISO 2

PISO 2

NPT. +3.10 m

NPT. +3.10 m

PISO 1

PISO 1

NPT. -0.40 m

NPT. -0.40 m

4.36

5

4

10.27

2'

10.43

2

7.65

1

Elevation Elevation of the main facade of the postgraduate building

Ground floor In the left side of the building is the university and the institute. In the middle part the two sports fields are evident, and on the right side the postgraduate building.


View from the sports fields to the postgraduate building

View from the sports fields to the university and institute building


TECHOS NPT. +17.50 m

PISO 5

OFICINA DE DIRECTOR DE CARRERA

NPT. +14.00 m

PISO 4

NPT. +14.00 m

NPT. +10.50 m

PISO 3

LABORATORIO

NPT. +7.00 m

NPT. +14.00 m

AULA

AULA

AULA

NPT. +10.50 m

NPT. +10.50 m

AULA

AULA

NPT. +7.00 m

AULA

NPT. +3.50 m

NPT. +14.00 m

NPT. +10.50 m

NPT. +7.00 m

AULA

NPT. +3.50 m

TUTORÍA

COBRANZA

NPT. +14.00 m

AULA

NPT. +7.00 m

PISO 2

OFICINA

NPT. +14.00 m

LABORATORIO

NPT. +10.50 m

CRÉDITOS Y

COORDINADORES ACADÈMICOS

ASISTENTES

NPT. +14.00 m

NPT. +7.00 m

AULA

NPT. +3.50 m

AULA

NPT. +3.50 m

NPT. +3.50 m

PISO 1 NPT. 0.00 m

CORTE A - A

Section University and Institute building

TECHOS

TECHOS

NPT. +17.50 m

NPT. +17.50 m

PISO 5

PISO 5

NPT. +14.00 m

NPT. +14.00 m

PISO 4

PISO 4

NPT. +10.50 m

NPT. +10.50 m

PISO 3 NPT. +7.00 m

PISO 2 NPT. +3.50 m

PISO 1 NPT. 0.00 m

TERRAZA

TERRAZA

EXPANSIÓN SUM

EXPANSIÓN SUM

NPT. +7.00 m

SALA DE ESTUDIO NPT. +3.50 m

LACTARIO NPT. 0.00 m

BIBLIOTECA INSTITUTO

BIBLIOTECA UNIVERSIDAD

NPT. +3.50 m

NPT. +3.50 m

TALLER CULTURAL

SALA DE ESTUDIO NPT. +3.50 m

PISO 2 NPT. +3.50 m

PISO 1

CAFETERÍA

NPT. 0.00 m

NPT. 0.00 m

NPT. 0.00 m

VESTUARIO

COMEDOR

EMPLEADOS

EMPLEADOS

NPT. -3.50 m

Section University and Institute building

PISO 3 NPT. +7.00 m

NPT. +7.00 m

NPT. -3.50 m

SÓTANO NPT. -3.50 m


Swimming pool / CSIR under construction In charge of the swimming pool project of the new campus for San ignacio de Recalde’s school

2018 - 2019 San Ignacio de Recalde’s school / CSIR in Lima, Peru State _ Under construction REYNALDO LEDGARD ARCHITECTS Lead Architect Reynaldo Ledgard with Paola Nicolacci

San Ignacio de Recalde School has a building in the district of Huachipa. In this place are the recreational programs of the school such as workshops, gym, orchards, among others. As part of its growth, the design of a semi-olympic pool that had 6 regulatory lanes, dressing rooms, bathrooms, cafeteria and a gallery for competitions was requested. A pool was designed on a single level with a depth of 1.5 meters, with the dressing rooms on a lower middle level, the bathrooms on an intermediate level and the stands and cafeterias on a higher level. The transparent roof was raised and an opening system was designed, since the pool is heated in winter but in summer it can be opened to take advantage of the favorable climate. The project is currently under construction with delivery date in March 2020.


1

1-1

2

2-2

3

4

3-3

5

ELEV. 1

6

4-4

7

5-5

8

9

44.10 4.80 0.30

5.75

4.50

0.30

5.75 0.30

5.45

5.45

5.75 0.30

5.75 0.30

5.45

5.75 0.30

5.45

5.75 0.30

5.45

4.80 0.30

5.45

4.50

0.30

A

A

CUARTO TABLEROS

CUARTO

N.P.T +0.00

BAÑOS H

N.P.T +0.00

N.P.T +/-0.00

BAÑOS M VESTIDOR M

VESTIDOR H

N.P.T -1.05

N.P.T -1.05

N.P.T -1.05

BAÑOS H N.P.T -1.05

CLOSET LIMPIEZA

CASILLEROS

6

10.85

CLOSET LIMPIEZA

CASILLEROS

CLOSET LIMPIEZA

N.P.T +/-0.00

PASARELA

19.82

N.P.T +/-0.00

N.P.T -1.05

4 5

3 4 5 6

1 2 3

1 2

BAÑOS M

CUARTO DE CISTERNA Y BOMBAS DEPOSITO

10.85

N.P.T -1.05

N.P.T -1.05

4.375 0.15

2

2

ELEV. 4

4.45 0.15

0.50 2.00

PASARELA

AREA DE PASARELA 380 m2 N.P.T +/-0.00

10.625

10.78

0.50 1.00

RAMPA PENDIENTE 3.4%

RAMPA PENDIENTE 3.4%

0.50

2.50

10.625

2.00

2.50

2.00

0.50

15.00 2.50

0.15

PISCINA

PASARELA

AREA DE PISCINA 375 m2

2.50

4.45

2.00

1

1

ELEV. 2

30.60

2.00 0.50

4 3

4 3

2.50

N.P.T +/-0.00

7 6 5

7 6 5

0.15

6-6

N.P.T +/-0.00

8

8

30.60

6-6

0.50

2.50

4.375

1.00

25.00

PASARELA N.P.T +/-0.00

B

B

5.45

0.30

5.45

5.75

1

0.30

5.45

5.75

5.75

0.30

5.45 5.75

0.30

5.45

N.P.T -0.35

5.75

34.50 2

2-2

1-1

0.30

2 1

0.30

5.75

2 1

5.45

2 1

2 1

0.30

N.P.T -0.35 3

4

5

3-3

6

7

8

4-4

ELEV. 2

9

5-5

Ground floor

5.75

N.T.T +8.35 s=10%

s=10%

s=10%

1.50

s=10%

6.65

0.25 1.00

N.P.T +3.15 18 17 16 15 14 13 12 11 10

1.35

HALL

PASARELA

PASARELA

HALL

N.P.T +/-0.00 N.P.T -0.35

1.50

0.35

JARDIN

18 17 16 15 14 13 12 11 10

2.90

6.70

0.20

N.T.T +6.85

PISCINA

N.P.T -1.50

N.P.T -1.50

9

Section

8

7

6

5

4

3

2

1


Centro Emergencia Mujer / CEM project delivered Design team leader: oversaw the development, execution of project plans

2018 Ministry of the Interior in Lima, Peru State _ Project Delivered

The Emergency Centers for Women (CEM) in Police stations are services provided jointly and articulated between the CEM and the police unit in the same physical space, for the integral attention of cases of violence against women, family group members and sexual violence . In this way, the victim or complainant may submit their complaint and access legal, psychological and social advice in one place. The Ministry of the Interior (MININTER), the National Police of Peru (PNP) and the Ministry of Women and Vulnerable Populations (MIMP) signed an agreement that approved the installation of CEM in Police Stations. For this purpose, the MININTER has adequate physical spaces in the police offices for the establishment of CEMs in those places with a high incidence of femicide and attempt of femicide.

Currently, there are more than 70 CEMs in police stations nationwide and it was planned to reach 100 by the end of the 2019. This will fulfill the commitment of the current government management in the eradication of violence against women and vulnerable groups. Several prototypes were design which could then be adapted to suit the conditions of each police station.


V-12

V-12

V-12

V-12

NPT=+0.00

PISO PORCELANATO

P-12 P-12 E-1

P-12´

NPT=+-0.00

ÁREA HALL

PISO PORCELANATO

P-12 0.90 x 2.20

ÁREA DE PSICOLOGÍA

NPT=+-0.00

PISO PORCELANATO

PROMOCION Y COORD.

NPT=+-0.00

PISO PORCELANATO

AREA LEGAL

NPT=+-0.00

PISO PORCELANATO

ASISTENCIA SOCIAL

V-10

V-10

0.90 x 2.20

Typical plan of prototype number 3 This block was proposed in the free spaces of the existing police stations, having previously done an investigation in order to have information as to the use, the space and the ground. It was necessary to know if the soil could withstand the load because the majority of police stations are in jungle and mountain areas, and are precarious. The area couldn’t be bigger than 30m2. Within the given program, a social assistance office, a legal area office, a psychology area and a promotion and coordination office were required. The prototypes had various modifications according to the chosen area.



MODEL MAKING


Britanico / Santa Anita Physical presentation model

Scale 1_200

Scale 1_200


Colegio de Ingenieros del Peru / CIP Physical presentation model

Scale 1_200

Scale 1_50 Section model of the auditorium for the development of the acoustic wall


+64 22 093 2007 nrodriguezv@pucp.pe


Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.